Have a personal or library account? Click to login
Impact of the Separation of the Continental Europe Power System on January 8, 2021 on the Work of the Bosnia and Herzegovina Power System Cover

Impact of the Separation of the Continental Europe Power System on January 8, 2021 on the Work of the Bosnia and Herzegovina Power System

Open Access
|Oct 2022

References

  1. [1] ENTSO-E, ICS Final Report/Main Report, 15.07.2021
  2. [2] PSS/E Documentation, SIEMENS – PTI, November 2021, Version 35.3.2
  3. [3] M.G Ippolito, R. Muska, G.Zizzo: Analysis and Simulations of the Primary Frequency Control during a System Split in Continental Europe Power System, Energies 2021, 14, 1456. https://doi.org/10.3390/en1405145610.3390/en14051456
  4. [4] NOSBiH, Detailed report „Separation of the power system of continental Europe 08.01.2021. and impact on the work of Power System of BiH”, Sarajevo, March 2021
  5. [5] SIPROTEC, SIGRA V4.57 Manual, SIGRA Product Information, SIEMENS, Edition 02.2011
  6. [6] REL.316*4 Numerical Protection and Control Devices, Operating Instruccions, ABB Switzerland Ltd, Edition October 2004
  7. [7] SIPROTEC 7UM85 Generator Protection – Manual, SIENMENS, Edition 11, 2020
  8. [8] SIPROTEC 7UM622 Multifunctional Machine Protection – Manual, SIENMENS, Edition: April 2005
DOI: https://doi.org/10.2478/bhee-2022-0002 | Journal eISSN: 2566-3151 | Journal ISSN: 2566-3143
Language: English
Page range: 9 - 18
Submitted on: Nov 16, 2021
Accepted on: Feb 14, 2022
Published on: Oct 13, 2022
Published by: Bosnia and Herzegovina National Committee CIGRÉ
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year

© 2022 Husnija Ferizović, Branislav Koprena, published by Bosnia and Herzegovina National Committee CIGRÉ
This work is licensed under the Creative Commons Attribution 4.0 License.