Optimization Method of Equipment Maintenance Resource Scheduling Based on Hidden Semi-Markov Model
By: Pengrui Wang, Bailin Liu, Tao Zhao and Pengxiang Cao
Authors
Pengrui Wang
School of Computer Science and Engineering Xi’an Technological University, Xi’an, China
Bailin Liu
School of Computer Science and Engineering Xi’an Technological University, Xi’an, China
Tao Zhao
Northwest Institute of Mechanical and Electrical Engineering Xianyang, Xianyang, China
Pengxiang Cao
School of Electronic Information Engineering Xi’an Technological University, Xi’an, China
DOI: https://doi.org/10.21307/ijanmc-2021-013 | Journal eISSN: 2470-8038
Language: English
Page range: 23 - 31
Published on: Feb 21, 2022
Published by: Xi’an Technological University
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year
Keywords:
Related subjects:
© 2022 Pengrui Wang, Bailin Liu, Tao Zhao, Pengxiang Cao, published by Xi’an Technological University
This work is licensed under the Creative Commons Attribution 4.0 License.