Figure 1.
![The characteristic of an actual domestic electricity market (https://www.enea.pl/pl/grupaenea/o-grupie/informacje-o-enea/otoczenie-rynkowe) [11]](https://sciendo-parsed.s3.eu-central-1.amazonaws.com/6470702c83f1392090d6982f/j_acee-2021-010_fig_001.jpg?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA6AP2G7AKBBM74A4T%2F20251212%2Feu-central-1%2Fs3%2Faws4_request&X-Amz-Date=20251212T231139Z&X-Amz-Expires=3600&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEEcaDGV1LWNlbnRyYWwtMSJHMEUCIQCSDFPXoBx8KZl1JnEbdah40IdHkMYigz%2Fuc%2FSTS1xdfwIgKyEwuYwFB4fC1i%2FlmTTEeV11fS3x%2B3syRomnHgSkJ%2F8qvQUIEBACGgw5NjMxMzQyODk5NDAiDNmcanWJdL7QX77z4yqaBSVVZ4aykYGiy0gH2aOP3Vvu6kOj%2FY9imVDLOK8ljiYEmNB6169t3NT6AmkKHLmzu95NZzeI58EuHBHBEAEMNOXtHwS128qFT0ElRsj39%2Flbu013o0xhAgHztYBlfBCcb2Y%2BrwLuSIIjdKPtoFq%2B0UX5F%2BT4tqXjeASF7qIDNs7WcUVCZ7owirnrNIjh1aNIfUDdQtDyYkJQlHtPLB4rQzDvWOzhqhiygdo8s3o0jvTQSFjob3PtidqI6ackbtGUXjIhXWvEnc8kcGN8vLlNVJccx%2FgOr0jIRUnLvuIxFVTJ7vCopRxpGGpBOV%2Bpx3B7vWF8h%2F7tv1k%2B8QDKOhxS3gKHiXzlVCeiOueMuT1wBoAyvjilmaIN1PBsaqE1Ukyt8TfyloJgKrhI%2BXDARz%2ByoGnuT59w%2B5cUqv4WQejYkz%2FGUcU1yD%2BVnCe13sXk5dVnxGAP3GcasUkwZsikRFFM%2FZN1VT7boO2nuftzTD3ImVWqEZWDQk6huPs0PJYb6LqVxYdQ%2B3uYUyyjfGWOu4Epb%2B6Rz59U57yGThYWQYq8mY0dYsOeVxa0UWQhfJRvBbmfkzVJRpC175ICQtac4q%2FjCbLe4UaheFseaDorrweOMyqzaXpkp3Jk5CV0BpwIonj84rnSm7QgXbmZIYyeSTGRU2rHLxpzHKRX%2F387PDEhFcYqGTM%2Blvv6U3Y7WDDTBCViADcZFPX6Fdj7cX4lOIOa4n64lz6DtBl%2BlORVDIFPy%2Br4HHJfvASeEX19GMNHBDk6MwNK8s8vX52VSyIfJYZaYdveCaT0GgP2MY4cqqTEzNmesazW0iE9SwWmdx%2Fs24wC5Dj%2Bq1HDAM%2BRQ8HhxV9iMIy4MU55JtB%2FaonrCcTWlLCPNGIMXP9TV%2BYSmDCGsvLJBjqxAcUMnNCUuGRg7%2Bbmf9HGOeVkesZWhTtnsGfFwGd0F%2FPCb%2Bajq6RvD2FM1fM95bITTq6hCyIeU9Q1KmvP1bsZHeUQ5UozZABX%2FBEQxpUD0SLMwtY3RHpnF2xUNxDcfAHNnKC5CaENpOT83ddozoTkNR5gJab5RnzbpL4I5GRopi504YJ%2BwoXE8wBySmT%2BW8GO8A93Vny0JEe8IV6igkgdyjQVBDFUTKoK41%2F6iF0P51S00Q%3D%3D&X-Amz-Signature=7f277bc6503296be62b44b31e78270b07b3dfc1cf362a4abfb107d539ed1b6d7&X-Amz-SignedHeaders=host&x-amz-checksum-mode=ENABLED&x-id=GetObject)
Fees for connecting to the road charging infrastructure network of public transport and generally available charging stations to the network with a rated voltage not higher than 1 kV
| connection group | connection fee PLN / kW outdoor connection | connection fee PLN / kW cable connection |
|---|---|---|
| IV | 7.09 | 15.56 |
| V | 7.09 | 15.56 |
| VI (for the newly built connection) | 7.09 | 15.56 |
| VI (when connected to an existing network) | 1.97 | 1.97 |
Fees for connecting to the road charging infrastructure network of public transport and generally available charging stations to the network with rated voltage not higher than 1 kV
| connection group | connection fee PLN / kW outdoor connection | connection fee PLN / kW cable connection |
|---|---|---|
| IV | 10.95 | 11.77 |
| V | 10.95 | 11.77 |
| VI (for the newly built connection) | 10.95 | 11.77 |
| VI (when connected to an existing network) | 1.97 | 1.97 |
Connection fees for networks with a rated voltage of less than 1 kV from entities other than charging stations that have been classified as connection groups: IV, V, VI
| connection group | connection fee PLN / kW outdoor connection | connection fee PLN / kW cable connection |
|---|---|---|
| IV | 43.78 | 47.09 |
| V | 43.78 | 47.09 |
| VI (for the newly built connection) | 43.78 | 47.09 |
| VI (when connected to an existing network) | 7.88 | 7.88 |
Connection fees for networks with a rated voltage of less than 1 kV from entities other than charging stations that have been classified as connection groups: IV, V, VI, VI
| connection group | connection fee PLN / kW outdoor connection | connection fee PLN / kW cable connection |
|---|---|---|
| IV | 28.36 | 62.24 |
| V | 28.36 | 62.24 |
| VI (for the newly built connection) | 28.36 | 62.24 |
| VI (when connected to an existing network) | 7.87 | 7.87 |