Analysis of Fees for Connecting the Infrastructure of Generally Accessible Charging Stations to Networks with Rated Voltage not Higher than 1 KV Cover

Analysis of Fees for Connecting the Infrastructure of Generally Accessible Charging Stations to Networks with Rated Voltage not Higher than 1 KV

By: Anna ŚLĘZAK  
Open Access
|Apr 2021

Figures & Tables

Figure 1.

The characteristic of an actual domestic electricity market (https://www.enea.pl/pl/grupaenea/o-grupie/informacje-o-enea/otoczenie-rynkowe) [11]
The characteristic of an actual domestic electricity market (https://www.enea.pl/pl/grupaenea/o-grupie/informacje-o-enea/otoczenie-rynkowe) [11]

Fees for connecting to the road charging infrastructure network of public transport and generally available charging stations to the network with a rated voltage not higher than 1 kV

connection groupconnection fee PLN / kW outdoor connectionconnection fee PLN / kW cable connection
IV7.0915.56
V7.0915.56
VI (for the newly built connection)7.0915.56
VI (when connected to an existing network)1.971.97

Fees for connecting to the road charging infrastructure network of public transport and generally available charging stations to the network with rated voltage not higher than 1 kV

connection groupconnection fee PLN / kW outdoor connectionconnection fee PLN / kW cable connection
IV10.9511.77
V10.9511.77
VI (for the newly built connection)10.9511.77
VI (when connected to an existing network)1.971.97

Connection fees for networks with a rated voltage of less than 1 kV from entities other than charging stations that have been classified as connection groups: IV, V, VI

connection groupconnection fee PLN / kW outdoor connectionconnection fee PLN / kW cable connection
IV43.7847.09
V43.7847.09
VI (for the newly built connection)43.7847.09
VI (when connected to an existing network)7.887.88

Connection fees for networks with a rated voltage of less than 1 kV from entities other than charging stations that have been classified as connection groups: IV, V, VI, VI

connection groupconnection fee PLN / kW outdoor connectionconnection fee PLN / kW cable connection
IV28.3662.24
V28.3662.24
VI (for the newly built connection)28.3662.24
VI (when connected to an existing network)7.877.87
DOI: https://doi.org/10.21307/acee-2021-010 | Journal eISSN: 2720-6947 | Journal ISSN: 1899-0142
Language: English
Page range: 107 - 114
Submitted on: Nov 12, 2020
Accepted on: Dec 7, 2020
Published on: Apr 17, 2021
Published by: Silesian University of Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2021 Anna ŚLĘZAK, published by Silesian University of Technology
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.