In the case of realized geotechnical monitoring (GTM) of reinforced retaining wall in difficult geological conditions is demonstrated the important role at realisation of transport infrastructures, which are often realized in insufficient quality due to inappropriate geotechnical parameters from survey works or not fitted well design of structure at certain conditions. This can result in large deformations of structure, or losing stability or structure life-time is very limited and remediation work is complicated and expensive. There was built on the modernized railway line Bratislava – Trenčín, closed to Zlatovce, overpass and connected road embankments on the route of first class I/61. Structure was designed as a bridge over the railway track before the northern portal of the railway tunnel Turecký vrch was open. A part of the embankment and overpass was a retaining wall reinforced by geosynthetics. The results of the geotechnical monitoring of this wall were afterwards simulated using finite element method (FEM) and results of this comparison are the scope of this article.

Language: English
Page range: 23 - 27
Submitted on: Mar 9, 2016
Accepted on: Apr 3, 2016
Published on: Jun 11, 2016
Published by: University of Oradea, Civil Engineering and Architecture Faculty
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year

© 2016 M. Drusa, J. Vlcek, published by University of Oradea, Civil Engineering and Architecture Faculty
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.