Have a personal or library account? Click to login
Diagnostics of Track Quality of Ballastless Track and Transition Areas in Vicinity of Portals of Tunnel Turecky vrch Cover

Diagnostics of Track Quality of Ballastless Track and Transition Areas in Vicinity of Portals of Tunnel Turecky vrch

By: Michal Šmalo  
Open Access
|May 2016

References

  1. [1] IŽVOLT, L. – ŠMALO, M.: Historical Development and Applications of Unconventional Structure of Railway Superstructure of the Railway Infrastructure of the Slovak Republic. In: Civil and Environmental Engineering. Volume 10, Issue 2. EDIS, University of Žilina, 2014. ISSN 1336-5835, p. 78 - 93.
  2. [2] ŠESTÁKOVÁ, J.: Quality of Slab Track Construction – Track Alignment Design and Track Geometry. In: Civil and Environmental Engineering. Vol. 11, Issue 1. EDIS, University of Žilina, 2014. ISSN 1336-5835, p. 2 - 9.10.1515/cee-2015-0001
  3. [3] ŠESTÁKOVÁ, J. - MEČÁR, M.: Evaluation of Track Design and Track Geometry of the Track with Unconventional Structure of Railway Superstructure. In: Proceedia Engineering. Vol. 111. XXIV. R-S-P Seminar, Theoretical Foundation of Civil Engineering (24 RSP). ISSN: 1877-7058, p. 709-716.10.1016/j.proeng.2015.07.136
  4. [4] IŽVOLT, L. – IŽVOLTOVÁ, J. – ŠESTAKOVÁ, J.: Influence of Construction of Railway Superstructure on Railway Quality. In: Applied Mechanics and Materials. Volume 617. Trans Tech Publications, ISSN 1660-9336, p. 54 - 59.10.4028/www.scientific.net/AMM.617.54
  5. [5] IŽVOLTOVÁ, J. – VILLIM, A. – PISCA, P.: Analysis of Height Changes of Ballast-Less Track. In: Geodézia, kartografia a geografické informačné systémy, VIII. vedecko-odborná medzinárodná konferencia - zborník príspevkov. Tatranské Matliare, SR, 17. - 19. 09. 2014. Košice : Technická univerzita, 2014. ISBN 978-80-553-1781-6.
  6. [6] STN 73 6360 (1999) Track alignment design and track geometry of normal-gauge tracks, SÚTN Bratislava and Amendment 1 (2002), SÚTN Bratislava.
  7. [7] ZSR SR 103-7 (S) Measurement and Evaluation of Track Geometry by Measuring Trolley KRAB (in Slovak). GR ZSR, 2008.
  8. [8] Continuously measuring trolley KRABTM–Light. Available online: http://kzv.cz/Czech/krab.php
  9. [9] IZVOLT, L. et al.: Monitoring of Sections of Non-conventional Constructions of the Railway Superstructure and the Transition Areas - 3th and 4th Stage. ZSR Modernization of Railway Track Nove Mesto nad Vahom - Puchov, km 100.500 to 159.100, part 24-32-01 Nove Mesto - Trencianske Bohuslavice (in Slovak). Zilina, KZSTH SvF, University of Zilina, 12/2013.
  10. [10] IZVOLT, L. et al.: Monitoring of Sections of Non-conventional Constructions of the Railway Superstructure and the Transition Areas - 5th and 6th Stage. ZSR Modernization of Railway Track Nove Mesto nad Vahom - Puchov, km 100.500 to 159.100, part 24-32-01 Nove Mesto - Trencianske Bohuslavice (in Slovak). Zilina, KZSTH, SvF, University of Zilina, 12/2014.
  11. [11] IZVOLT, L. et al.: Monitoring of Sections of Non-conventional Constructions of the Railway Superstructure and the Transition Areas - 7th and 8th Stage. ZSR Modernization of Railway Track Nove Mesto nad Vahom - Puchov, km 100.500 to 159.100, part 24-32-01 Nove Mesto - Trencianske Bohuslavice (in Slovak). Zilina, KZSTH, SvF, University of Zilina, 12/2015.
DOI: https://doi.org/10.1515/cee-2016-0001 | Journal eISSN: 2199-6512 | Journal ISSN: 1336-5835
Language: English
Page range: 2 - 12
Published on: May 12, 2016
Published by: University of Žilina
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year

© 2016 Michal Šmalo, published by University of Žilina
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.