
Micro-baking procedure flow diagram
Abbildung 1. Fließdiagramm des Mikrobackversuchs

Modified RVA cans used for micro-baking (right) and crumb texture determination (left)
Abbildung 2. Bearbeitete RVA Probenbehälter zur Verwendung als Backform (rechts) und als Halterung für die Texturmessung (links)

Exemplary front view images of breads obtained by micro baking procedure out of wheat flours A, B and C.
Abbildung 3. Beispielhafte Fotos von Broten hergestellt mittels Mikrobackversuch aus Mehlen A, B und C
Table 1
Specific volume, crumb firmness, crumb elasticity and crust color of breads made by micro-baking procedure
Tabelle 1. Spezifisches Volumen, Krumenfestigkeit, Krumenelastizität und Krustenfarbe der im Mikrobackversuch hergestellten Brote
| Parameter | Fresh bread (n = 10) | Frozen dough bread (n = 10) | |||||
|---|---|---|---|---|---|---|---|
| A | B | C | A | B | C | ||
| Specific loaf volume, cm3/100g | |||||||
| Mean | 359a | 330ab | 425c | 236d | 331ab | 317b | |
| Standard deviation | 15 | 18 | 19 | 11 | 18 | 14 | |
| Coefficient of variation | 4.2 | 5.5 | 4.5 | 4.7 | 5.4 | 4.3 | |
| Fmaxa, N | |||||||
| Mean | 2.4a | 0.9b | 1.0b | 5.9c | 0.8b | 1.0b | |
| Standard deviation | 0.2 | 0.1 | 0.1 | 1.3 | 0.1 | 0.2 | |
| Coefficient of variation | 7.5 | 9.5 | 10.3 | 21.3 | 11.7 | 15.8 | |
| FREL a, % | |||||||
| Mean | 49.7a | 37.6b | 30.0c | 59.3d | 39.9b | 40.5b | |
| Standard deviation | 1.6 | 1.5 | 1.6 | 3.4 | 2.8 | 2.4 | |
| Coefficient of variation | 3.3 | 4.0 | 5.2 | 5.8 | 6.9 | 6.0 | |
| Color L* | |||||||
| Mean | 80.8a | 72.7b | 63.1d | 65.3cd | 67.3c | 57.5e | |
| Standard deviation | 1.2 | 1.1 | 1.5 | 1.0 | 1.8 | 2.2 | |
| Coefficient of variation | 1.4 | 1.6 | 2.3 | 1.6 | 2.6 | 3.8 | |
| Color a* | |||||||
| Mean | 11.1ab | 10.6a | 15.8c | 15.1c | 12.8b | 16.7c | |
| Standard deviation | 0.6 | 0.9 | 0.9 | 0.6 | 1.2 | 0.9 | |
| Coefficient of variation | 5.8 | 8.8 | 5.4 | 4.0 | 9.3 | 5.4 | |
| Color b* | |||||||
| Mean | 37.5a | 34.3bcd | 35.3bc | 35.8b | 34.1cd | 33.3d | |
| Standard deviation | 0.5 | 1.1 | 1.1 | 0.2 | 0.9 | 0.8 | |
| Coefficient of variation | 1.2 | 3.4 | 3.1 | 0.5 | 2.6 | 2.3 | |
a n = 6 Within row, values with the same following letter do not differ significantly from each other (p > 0.05)
a n = 6 Within row, values with the same following letter do not differ significantly from each other (p > 0.05)
a n = 6 Within row, values with the same following letter do not differ significantly from each other (p > 0.05)
a n = 6 Within row, values with the same following letter do not differ significantly from each other (p > 0.05)
a n = 6 Within row, values with the same following letter do not differ significantly from each other (p > 0.05)
a n = 6 Within row, values with the same following letter do not differ significantly from each other (p > 0.05)

Changes of bread crumb firmness during storage at 20°C, 50% relative humidity
Abbildung 4. Veränderungen der Krumenfestigkeit während der Lagerung bei 20°C, 50 % relative Luftfeuchtigkeit
Table 2
Staling kinetic parameters according to the Avrami equation
Tabelle 2. Kinetische Parameter des Altbackenwerdens laut Avrami-Gleichung
| Bread type | Avrami equation parameters | ||
|---|---|---|---|
| n | k | R2 | |
| Fresh bread | |||
| Flour A | 1.85 | 0.184 | 0.934 |
| Flour B | 3.42 | 0.030 | 0.998 |
| Flour C | 5.66 | 0.002 | 0.999 |
| Frozen dough bread | |||
| Flour A | 0.95 | 0.314 | 0.999 |
| Flour B | 4.92 | 0.005 | 0.999 |
| Flour C | 3.14 | 0.048 | 0.999 |