Skip to main content
Have a personal or library account? Click to login
Changing land-use metrics in mass housing: Türkiye case study Cover

Changing land-use metrics in mass housing: Türkiye case study

Open Access
|May 2026

Figures & Tables

Figure 1:

Location maps of the mass housing projects in Türkiye discussed in the study: (a) Kocaeli; (b) İzmit in Kocaeli; (c) locations of the eight projects; and (d) İzmit City.

Figure 2:

Mass housing projects in the study.

Note: Photo numbers are associated with the site names listed in Figure 3.

Figure 3:

Site plans with solid–void representation.

Figure 4:

Research model.

Table 1

Comparison of the physical characteristics of the project areas in İzmit.

PROJECTPROJECT AREA (m²)BLOCKS (n)BUILDING COVERAGE AREA (m²)BLOCK FLOOR AREA (m²)DETACHED UNITS (n)ACTIVE GREEN (m²)PLAY GROUND (m²)SPORT FACILITIES (m²)CAR PARKING (m²)
Yahya Kaptan Residences1,014,37921093,212590,0155,386551,1926,37936,88763,213
Yuvam Akarca Residences810,76013270,244483,8573,899303,4166,3843,81251,694
İzmitkent-140,683107,25780,52155514,3696325736,634
İzmitkent-234,393145,94268,15167913,7903194583,832
İzmitkent-330,726165,12927,10669614,88544903,237
İzmitkent-410,53651,80321,6362204,7382160983
Yildiz Residences43,596118,307141,22668712,4011,02862213,268
İzmitkent-524,32283,83046,46749412,4674644992,675
Table 2

Realised land-use indicators in the project areas of İzmit.

PROJECTYEARCAR PARKING PER DETACHED UNIT (n)ACTIVE GREEN PER DETACHED UNIT (n)PLAY GROUND PER DETACHED UNIT (n)SPORT FACILITIES PER DETACHED UNIT (n)ACTUAL BUILDING COVERAGE RATIO (A.BCR)ACTUAL FLOOR AREA RATIO (A.FAR)BUILDING PROXIMITY INDEX (BPI)
Yahya Kaptan Residences1990121021.186.850.090.581.627
Yuvam Akarca Residences200013781.640.980.090.601.491
İzmitkent-1200811261.141.030.181.981.047
İzmitkent-220096200.470.670.171.980.622
İzmitkent-320105210.650.000.170.880.620
İzmitkent-420114220.980.000.172.050.395
Yildiz Residences201319181.500.900.193.241.018
İzmitkent-520145250.941.010.161.911.319
Figure 5:

Actual building coverage ratio (A.BCR), actual floor area ratio (A.FAR), building proximity index (BPI) and active green graphics in Table 2.

Table 3

What kind of arrangements are needed to implement a project similar to the 1990 project?

EXPERTS (n)%
Construction and land costs should remain low960%
Implementation may be possible through government interventions853%
Accurately designed and effectively implemented legislations and planning processes are needed533%
The land and ownership structure plays a critical role427%
Profit-oriented or rent-seeking motives should be avoided320%
Political and administrative facilitators are of significant importance213%

[i] Note: A total of 15 experts were interviewed.

DOI: https://doi.org/10.5334/bc.786 | Journal eISSN: 2632-6655
Language: English
Page range: 541 - 558
Submitted on: Jan 22, 2026
Accepted on: Apr 4, 2026
Published on: May 4, 2026
Published by: Ubiquity Press
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2026 Murat Selim Çepni, Ahmet Kıvanç Kutluca, Tayfun Salihoğlu, Abdurrahman Atmaca, Sevra Mintemur, published by Ubiquity Press
This work is licensed under the Creative Commons Attribution 4.0 License.