Have a personal or library account? Click to login
Threats of Flooding of Selected Mining Areas – Repair Measures Cover

Threats of Flooding of Selected Mining Areas – Repair Measures

Open Access
|May 2020

Abstract

Terrain surface subsidence observed in mining areas results in the flattening of riverbeds and their embankments. This leads to increasingly deep erosion and siltation of riverbeds and surface currents, which causes the emergence of permanent overflow lands. This paper presents hydro – engineering solutions applied in the areas of the mining activity of JSW S.A., which serve the purpose of repairing and eliminating mining damage in the existing infrastructure. The presented repair measures make it possible to eliminate the threat of flooding in mining areas.

DOI: https://doi.org/10.4467/2353737xct.19.110.11034 | Journal eISSN: 2353-737X | Journal ISSN: 0011-4561
Language: English
Page range: 117 - 127
Submitted on: Sep 12, 2019
Published on: May 16, 2020
Published by: Cracow University of Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2020 Tadeusz Majcherczyk, Katarzyna Kryzia, Jerzy Majchrzak, published by Cracow University of Technology
This work is licensed under the Creative Commons Attribution-ShareAlike 4.0 License.