Have a personal or library account? Click to login
Modelling the delivery and laying of concrete mix Cover

Modelling the delivery and laying of concrete mix

Open Access
|May 2020

Abstract

The aim of this paper is to indicate solutions which fulfil the conditions for laying concrete mix before it starts setting. Using models M/M/N/-/N, for organization I for the so-called delivery directly after unloading, with automatic transfer of information using the RFID system, and M/M/1/FIFO/N/F, for organisation II with transportation units working in closed cycle. Of example, organisation I, with RFID system is more advisable as it is characterised by a shorter waiting time on construction sites; and longer at the concrete-mixing plant. At the same time, it increases the efficiency of working units compared with organisation II which has self-regulating transportation units running in closed cycle.

DOI: https://doi.org/10.4467/2353737XCT.17.153.7165 | Journal eISSN: 2353-737X | Journal ISSN: 0011-4561
Language: English
Page range: 127 - 135
Published on: May 29, 2020
Published by: Cracow University of Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2020 Andrzej Więckowski, published by Cracow University of Technology
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.