The Multi-Mode, Resource-Constrained Project Scheduling Problem in Construction: State of Art Review and Research Challenges Cover

The Multi-Mode, Resource-Constrained Project Scheduling Problem in Construction: State of Art Review and Research Challenges

By: Jerzy Rosłon  
Open Access
|May 2020

Abstract

In this article, the author analyses the state of the research of the multi-mode, resource-constrained, projectscheduling problem (MRCPSP). Both general and construction-industry-specific applications were studied and compared–in particular, algorithms and methodologies used for solving the different variations of this scheduling problem. Based on the analysis, the author suggests future research ideas.

DOI: https://doi.org/10.4467/2353737XCT.17.070.6427 | Journal eISSN: 2353-737X | Journal ISSN: 0011-4561
Language: English
Page range: 67 - 74
Published on: May 26, 2020
Published by: Cracow University of Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2020 Jerzy Rosłon, published by Cracow University of Technology
This work is licensed under the Creative Commons Attribution-ShareAlike 4.0 License.