Analyzing the Impact of Workload Norms and Order Fill Rate on Job Shop Performance
References
- Baker, W., 1965. The delivery time in machine factories, an exploratory investigation. . Delft University,.
- Bongomin, O., Mwasiagi, J. I., Nganyi, E. O., & Nibikora, I., 2020. Improvement of garment assembly line efficiency using line balancing technique. Engineering Reports, 2(4. DOI: 10.1002/eng2.12157
- Calle, M., Gonzalez-R, P. L., Andrade, J. L., Leon-Blanco, J. M., & Canca, D., 2025. Workload control in dual-resource constrained flexible job shops: a simulation analysis. International Journal of Production Research, 63(20), 7363–7385. DOI: 10.1080/00207543.2025.2496976
- Ebadian, M., Rabbani, M., Torabi, S. A., & Jolai, F., 2009. Hierarchical production planning and scheduling in make-to-order environments: Reaching short and reliable delivery dates. International Journal of Production Research, 47(20), 5761–5789. DOI: 10.1080/00207540802010799
- Fernandes, N. O., & Carmo-Silva, S., 2011. Order release in a workload controlled flow-shop with sequence-dependent set-up times. International Journal of Production Research, 49(8), 2443–2454. DOI: 10.1080/00207541003720376
- Fernandes, N. O., Land, M. J., & Carmo-Silva, S., 2014. Workload control in unbalanced job shops. International Journal of Production Research, 52(3), 679–690. DOI: 10.1080/00207543.2013.827808
- Fernandes, N. O., Land, M. J., & Carmo-Silva, S., 2016. Aligning workload control theory and practice: Lot splitting and operation overlapping issues. International Journal of Production Research, 54(10), 2965–2975. DOI: 10.1080/00207543.2016.1143134
- Fernandes, N. O., Silva, C., & Carmo-Silva, S., 2015. Order release in the hybrid MTO-FTO production. International Journal of Production Economics, 170, 513–520. DOI: 10.1016/j.ijpe.2015.03.025
- Ferro, R., Cordeiro, G. A., Ordóñez, R. E. C., Beydoun, G., & Shukla, N., 2021. An optimization tool for production planning: A case study in a textile industry. Applied Sciences, 11(18). DOI: 10.3390/app11188312
- Germs, R., & Riezebos, J., 2010. Workload balancing capability of pull systems in MTO production. International Journal of Production Research, 48(8), 2345–2360. DOI: 10.1080/00207540902814314
- Jung, W. K., Kim, H., Park, Y. C., Lee, J. W., & Suh, E. S., 2022. Real-time data-driven discrete-event simulation for garment production lines. Production Planning and Control, 33(5), 480–491. DOI: 10.1080/09537287.2020.1830194
- Land, M., & Gaalman, G., 1996. Workload control concepts in job shops A critical assessment. In Int. J. Production Economics (Vol. 46).
- Land, M. J., & Gaalman, G. J. C., 1998. The performance of workload control concepts in job shops: Improving the release method. Int. J. Production Economics, 56, 347–364.
- Land, M. J., Stevenson, M., Thürer, M., & Gaalman, G. J. C., 2015. Job shop control: In search of the key to delivery improvements. International Journal of Production Economics, 168, 257–266. DOI: 10.1016/j.ijpe.2015.07.007
- Lee, C. K. H., Choy, K. L., Ho, G. T. S., & Law, K. M. Y., 2013. A RFID-based Resource Allocation System for garment manufacturing. Expert Systems with Applications, 40(2), 784–799. DOI: 10.1016/j.eswa.2012.08.033
- Lödding, H., Yu, K. W., & Wiendahl, H. P., 2003. Decentralized WIP-oriented manufacturing control (DEWIP). Production Planning and Control, 14(1), 42–54. DOI: 10.1080/0953728021000078701
- Lu, H. L., Huang, G. Q., & Yang, H. D., 2011. Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach. International Journal of Production Research, 49(3), 647–669. DOI: 10.1080/00207540903524490
- Mezzogori, D., Romagnoli, G., & Zammori, F., 2022. A new perspective on Workload Control by measuring operating performances through an economic valorization. Scientific Reports, 12(1). DOI: 10.1038/s41598-022-17968-5
- Missbauer, H., 2002. Aggregate order release planning for time-varying demand. International Journal of Production Research, 40(3), 699–718. DOI: 10.1080/00207540110090939
- Moreira, M. R. A., & Alves, R. A. F. S., 2009. A methodology for planning and controlling workload in a job-shop: A four-way decision-making problem. International Journal of Production Research, 47(10), 2805–2821. DOI: 10.1080/00207540701725083
- Müller, E., Tolujew, J., & Kienzle, F., 2014. Push-Kanban-a kanban-based production control concept for job shops. Production Planning and Control, 25(5), 401–413. DOI: 10.1080/09537287.2012.701021
- Nahavandi, N., 2009. CWIPL II, a mechanism for improving throughput and lead time in unbalanced flow line. International Journal of Production Research, 47(11), 2921–2941. DOI: 10.1080/00207540701725059
- Ngwu, C., Liu, Y., & Wu, R., 2025. Reinforcement learning in dynamic job shop scheduling: a comprehensive review of AI-driven approaches in modern manufacturing. Journal of Intelligent Manufacturing. DOI: 10.1007/s10845-025-02585-6
- Oosterman, B., Land, M., & Gaalman, G., 2000. The influence of shop characteristics on workload control. In Int. J. Production Economics (Vol. 68).
- Qi, C., Sivakumar, A. I., & Gershwin, S. B., 2009. An efficient new job release control methodology. International Journal of Production Research, 47(3), 703–731. DOI: 10.1080/00207540701455335
- Rahman, A., Kamal, T., Rahman, F., & Tseng, T.-L., 2023. A simulation-based approach for line balancing under demand uncertainty in production environment. In C. G. Corlu et al. (Eds.), Proceedings of the 2023 Winter Simulation Conference (pp. 2020–2030). IEEE.
- Riezebos, J., Korte, G. J., & Land, M. J., 2003. Improving a practical DBR buffering approach using Workload Control. International Journal of Production Research, 41(4), 699–712. DOI: 10.1080/0020754031000065485
- Saad, S. M., Pickett, N., & Kittiaram, K., 2004. An integrated model for order release and due-date demand management. Journal of Manufacturing Technology Management, 15(1), 76–89. DOI: 10.1108/09576060410512356
- Sabuncuoglu, I., & Karapinar, H. Y., 2000. A Load-based and Due-date-oriented Approach to Order Review/Release in Job Shops. Decision Sciences, 31(2), 413–447.
- Safavi, S., & Blake, J. T., 2025. Inventory management of perishables under Zero-Inflated Poisson demand. Operations Research, Data Analytics and Logistics, 45, 200482. DOI: 10.1016/j.ordal.2025.200482
- Sargent, R. G., 2011. Verification and Validation of Simulation Models. In S. Jain, R.R. Creasey, & and M. F. eds J. HimmelspachK.P. White (Eds.), Proceedings of the 2011 Winter Simulation Conference. IEEE.
- Silva, C., Stevenson, M., & Thürer, M., 2015. A case study of the successful implementation of workload control: A practitioner-led approach. Journal of Manufacturing Technology Management, 26(2), 280–296. DOI: 10.1108/JMTM-10-2013-0144
- Singh, R., & Mathirajan, M., 2019. Investigation of different inputs and a new release policy in the proposed simulation model for wafer fabrication system. Sādhanā, 44(2), 41. DOI: 10.1007/s12046-018-1006-8
- Soepenberg, G. D., Land, M., & Gaalman, G., 2008. The order progress diagram: A supportive tool for diagnosing delivery reliability performance in make-to-order companies. International Journal of Production Economics, 112(1), 495–503. DOI: 10.1016/j.ijpe.2007.06.001
- Thürer, M., Huang, G., Stevenson, M., Silva, C., & Filho, M. G., 2012b. The performance of Due Date setting rules in assembly and multi-stage job shops: An assessment by simulation. International Journal of Production Research, 50(20), 5949–5965. DOI: 10.1080/00207543.2011.638942
- Thürer, M., Land, M. J., Stevenson, M., & Fredendall, L. D., 2017. On the integration of due date setting and order release control. Production Planning and Control, 28(5), 420–430. DOI: 10.1080/09537287.2017.1302102
- Thürer, M., Land, M. J., Stevenson, M., Fredendall, L. D., & Godinho Filho, M., 2015. Concerning Workload Control and Order Release: The Pre-Shop Pool Sequencing Decision. Production and Operations Management, 24(7), 1179–1192. DOI: 10.1111/poms.12304
- Thürer, M., Silva, C., & Stevenson, M., 2010. Workload control release mechanisms: From practice back to theory building. International Journal of Production Research, 48(12), 3593–3617. DOI: 10.1080/00207540902922810
- Thürer, M., Silva, C., Stevenson, M., & Land, M., 2014b. Controlled order release: A performance assessment in job shops with sequence-dependent set-up times. Production Planning and Control, 25(7), 603–615. DOI: 10.1080/09537287.2012.735801
- Thürer, M., & Stevenson, M., 2016. Workload control in job shops with reentrant flows: an assessment by simulation. International Journal of Production Research, 54(17), 5136–5150. DOI: 10.1080/00207543.2016.1156182
- Thürer, M., Stevenson, M., & Land, M. J., 2016. On the integration of input and output control: Workload Control order release. International Journal of Production Economics, 174, 43–53. DOI: 10.1016/j.ijpe.2016.01.005
- Thürer, M., Stevenson, M., & Qu, T., 2016. Job sequencing and selection within workload control order release: An assessment by simulation. International Journal of Production Research, 54(4), 1061–1075. DOI: 10.1080/00207543.2015.1047978
- Thürer, M., Stevenson, M., Silva, C., & Land, M., 2013. Towards an integrated workload control (WLC) concept: The performance of due date setting rules in job shops with contingent orders. International Journal of Production Research, 51(15), 4502–4516. DOI: 10.1080/00207543.2013.774485
- Thürer, M., Stevenson, M., Silva, C., Land, M. J., & Fredendall, L. D., 2012a. Workload control and order release: A lean solution for make-to-order companies. Production and Operations Management, 21(5), 939–953. DOI: 10.1111/j.1937-5956.2011.01307.x
- Thürer, M., Stevenson, M., Silva, C., Land, M. J., Fredendall, L. D., & Melnyk, S. A., 2014a. Lean control for make-to-order companies: Integrating customer enquiry management and order release. Production and Operations Management, 23(3), 463–476. DOI: 10.1111/poms.12058
- Thürer, M., Ma, L., & Stevenson, M., 2021. Workload Control order release in general and pure flow shops with limited buffer size induced blocking: an assessment by simulation. International Journal of Production Research, 59(8), 2558–2569. DOI: 10.1080/00207543.2020.1735667
- Ünal, C., & Bekiroǧlu, B., 2024. Simulation Analysis of the Effect of Working Method Differences on Production Efficiency in the Apparel Industry. Fibres and Textiles in Eastern Europe, 32(3), 21–28. DOI: 10.2478/ftee-2024-0017
- Vieira, M., Moniz, S., Gonçalves, B. S., Pinto-Varela, T., Barbosa-Póvoa, A. P., & Neto, P., 2022. A two-level optimisation-simulation method for production planning and scheduling: the industrial case of a human–robot collaborative assembly line. International Journal of Production Research, 60(9), 2942–2962. DOI: 10.1080/00207543.2021.1906461
- Wang, H., Jiang, Y., Wang, H., & Luo, H., 2022. An online optimization scheme of the dynamic flexible job shop scheduling problem for intelligent manufacturing. 2022 4th International Conference on Industrial Artificial Intelligence (IAI), 1–6. DOI: 10.1109/IAI55780.2022.9976820
Language: English
Page range: 449 - 460
Submitted on: Feb 19, 2026
Accepted on: Mar 20, 2026
Published on: Jun 23, 2026
Published by: Quality and Production Managers Association
In partnership with: Paradigm Publishing Services
Keywords:
Related subjects:
© 2026 Aruna Prabhu, Srinivas Shenoy Heckadka, Ramakrishna Vikas Sadanand, Augustine B.V. Barboza, published by Quality and Production Managers Association
This work is licensed under the Creative Commons Attribution 4.0 License.