Skip to main content
Have a personal or library account? Click to login
Analyzing the Impact of Workload Norms and Order Fill Rate on Job Shop Performance Cover

Analyzing the Impact of Workload Norms and Order Fill Rate on Job Shop Performance

Open Access
|Jun 2026

References

  1. Baker, W., 1965. The delivery time in machine factories, an exploratory investigation. . Delft University,.
  2. Bongomin, O., Mwasiagi, J. I., Nganyi, E. O., & Nibikora, I., 2020. Improvement of garment assembly line efficiency using line balancing technique. Engineering Reports, 2(4. DOI: 10.1002/eng2.12157
  3. Calle, M., Gonzalez-R, P. L., Andrade, J. L., Leon-Blanco, J. M., & Canca, D., 2025. Workload control in dual-resource constrained flexible job shops: a simulation analysis. International Journal of Production Research, 63(20), 7363–7385. DOI: 10.1080/00207543.2025.2496976
  4. Ebadian, M., Rabbani, M., Torabi, S. A., & Jolai, F., 2009. Hierarchical production planning and scheduling in make-to-order environments: Reaching short and reliable delivery dates. International Journal of Production Research, 47(20), 5761–5789. DOI: 10.1080/00207540802010799
  5. Fernandes, N. O., & Carmo-Silva, S., 2011. Order release in a workload controlled flow-shop with sequence-dependent set-up times. International Journal of Production Research, 49(8), 2443–2454. DOI: 10.1080/00207541003720376
  6. Fernandes, N. O., Land, M. J., & Carmo-Silva, S., 2014. Workload control in unbalanced job shops. International Journal of Production Research, 52(3), 679–690. DOI: 10.1080/00207543.2013.827808
  7. Fernandes, N. O., Land, M. J., & Carmo-Silva, S., 2016. Aligning workload control theory and practice: Lot splitting and operation overlapping issues. International Journal of Production Research, 54(10), 2965–2975. DOI: 10.1080/00207543.2016.1143134
  8. Fernandes, N. O., Silva, C., & Carmo-Silva, S., 2015. Order release in the hybrid MTO-FTO production. International Journal of Production Economics, 170, 513–520. DOI: 10.1016/j.ijpe.2015.03.025
  9. Ferro, R., Cordeiro, G. A., Ordóñez, R. E. C., Beydoun, G., & Shukla, N., 2021. An optimization tool for production planning: A case study in a textile industry. Applied Sciences, 11(18). DOI: 10.3390/app11188312
  10. Germs, R., & Riezebos, J., 2010. Workload balancing capability of pull systems in MTO production. International Journal of Production Research, 48(8), 2345–2360. DOI: 10.1080/00207540902814314
  11. Jung, W. K., Kim, H., Park, Y. C., Lee, J. W., & Suh, E. S., 2022. Real-time data-driven discrete-event simulation for garment production lines. Production Planning and Control, 33(5), 480–491. DOI: 10.1080/09537287.2020.1830194
  12. Land, M., & Gaalman, G., 1996. Workload control concepts in job shops A critical assessment. In Int. J. Production Economics (Vol. 46).
  13. Land, M. J., & Gaalman, G. J. C., 1998. The performance of workload control concepts in job shops: Improving the release method. Int. J. Production Economics, 56, 347–364.
  14. Land, M. J., Stevenson, M., Thürer, M., & Gaalman, G. J. C., 2015. Job shop control: In search of the key to delivery improvements. International Journal of Production Economics, 168, 257–266. DOI: 10.1016/j.ijpe.2015.07.007
  15. Lee, C. K. H., Choy, K. L., Ho, G. T. S., & Law, K. M. Y., 2013. A RFID-based Resource Allocation System for garment manufacturing. Expert Systems with Applications, 40(2), 784–799. DOI: 10.1016/j.eswa.2012.08.033
  16. Lödding, H., Yu, K. W., & Wiendahl, H. P., 2003. Decentralized WIP-oriented manufacturing control (DEWIP). Production Planning and Control, 14(1), 42–54. DOI: 10.1080/0953728021000078701
  17. Lu, H. L., Huang, G. Q., & Yang, H. D., 2011. Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach. International Journal of Production Research, 49(3), 647–669. DOI: 10.1080/00207540903524490
  18. Mezzogori, D., Romagnoli, G., & Zammori, F., 2022. A new perspective on Workload Control by measuring operating performances through an economic valorization. Scientific Reports, 12(1). DOI: 10.1038/s41598-022-17968-5
  19. Missbauer, H., 2002. Aggregate order release planning for time-varying demand. International Journal of Production Research, 40(3), 699–718. DOI: 10.1080/00207540110090939
  20. Moreira, M. R. A., & Alves, R. A. F. S., 2009. A methodology for planning and controlling workload in a job-shop: A four-way decision-making problem. International Journal of Production Research, 47(10), 2805–2821. DOI: 10.1080/00207540701725083
  21. Müller, E., Tolujew, J., & Kienzle, F., 2014. Push-Kanban-a kanban-based production control concept for job shops. Production Planning and Control, 25(5), 401–413. DOI: 10.1080/09537287.2012.701021
  22. Nahavandi, N., 2009. CWIPL II, a mechanism for improving throughput and lead time in unbalanced flow line. International Journal of Production Research, 47(11), 2921–2941. DOI: 10.1080/00207540701725059
  23. Ngwu, C., Liu, Y., & Wu, R., 2025. Reinforcement learning in dynamic job shop scheduling: a comprehensive review of AI-driven approaches in modern manufacturing. Journal of Intelligent Manufacturing. DOI: 10.1007/s10845-025-02585-6
  24. Oosterman, B., Land, M., & Gaalman, G., 2000. The influence of shop characteristics on workload control. In Int. J. Production Economics (Vol. 68).
  25. Qi, C., Sivakumar, A. I., & Gershwin, S. B., 2009. An efficient new job release control methodology. International Journal of Production Research, 47(3), 703–731. DOI: 10.1080/00207540701455335
  26. Rahman, A., Kamal, T., Rahman, F., & Tseng, T.-L., 2023. A simulation-based approach for line balancing under demand uncertainty in production environment. In C. G. Corlu et al. (Eds.), Proceedings of the 2023 Winter Simulation Conference (pp. 2020–2030). IEEE.
  27. Riezebos, J., Korte, G. J., & Land, M. J., 2003. Improving a practical DBR buffering approach using Workload Control. International Journal of Production Research, 41(4), 699–712. DOI: 10.1080/0020754031000065485
  28. Saad, S. M., Pickett, N., & Kittiaram, K., 2004. An integrated model for order release and due-date demand management. Journal of Manufacturing Technology Management, 15(1), 76–89. DOI: 10.1108/09576060410512356
  29. Sabuncuoglu, I., & Karapinar, H. Y., 2000. A Load-based and Due-date-oriented Approach to Order Review/Release in Job Shops. Decision Sciences, 31(2), 413–447.
  30. Safavi, S., & Blake, J. T., 2025. Inventory management of perishables under Zero-Inflated Poisson demand. Operations Research, Data Analytics and Logistics, 45, 200482. DOI: 10.1016/j.ordal.2025.200482
  31. Sargent, R. G., 2011. Verification and Validation of Simulation Models. In S. Jain, R.R. Creasey, & and M. F. eds J. HimmelspachK.P. White (Eds.), Proceedings of the 2011 Winter Simulation Conference. IEEE.
  32. Silva, C., Stevenson, M., & Thürer, M., 2015. A case study of the successful implementation of workload control: A practitioner-led approach. Journal of Manufacturing Technology Management, 26(2), 280–296. DOI: 10.1108/JMTM-10-2013-0144
  33. Singh, R., & Mathirajan, M., 2019. Investigation of different inputs and a new release policy in the proposed simulation model for wafer fabrication system. Sādhanā, 44(2), 41. DOI: 10.1007/s12046-018-1006-8
  34. Soepenberg, G. D., Land, M., & Gaalman, G., 2008. The order progress diagram: A supportive tool for diagnosing delivery reliability performance in make-to-order companies. International Journal of Production Economics, 112(1), 495–503. DOI: 10.1016/j.ijpe.2007.06.001
  35. Thürer, M., Huang, G., Stevenson, M., Silva, C., & Filho, M. G., 2012b. The performance of Due Date setting rules in assembly and multi-stage job shops: An assessment by simulation. International Journal of Production Research, 50(20), 5949–5965. DOI: 10.1080/00207543.2011.638942
  36. Thürer, M., Land, M. J., Stevenson, M., & Fredendall, L. D., 2017. On the integration of due date setting and order release control. Production Planning and Control, 28(5), 420–430. DOI: 10.1080/09537287.2017.1302102
  37. Thürer, M., Land, M. J., Stevenson, M., Fredendall, L. D., & Godinho Filho, M., 2015. Concerning Workload Control and Order Release: The Pre-Shop Pool Sequencing Decision. Production and Operations Management, 24(7), 1179–1192. DOI: 10.1111/poms.12304
  38. Thürer, M., Silva, C., & Stevenson, M., 2010. Workload control release mechanisms: From practice back to theory building. International Journal of Production Research, 48(12), 3593–3617. DOI: 10.1080/00207540902922810
  39. Thürer, M., Silva, C., Stevenson, M., & Land, M., 2014b. Controlled order release: A performance assessment in job shops with sequence-dependent set-up times. Production Planning and Control, 25(7), 603–615. DOI: 10.1080/09537287.2012.735801
  40. Thürer, M., & Stevenson, M., 2016. Workload control in job shops with reentrant flows: an assessment by simulation. International Journal of Production Research, 54(17), 5136–5150. DOI: 10.1080/00207543.2016.1156182
  41. Thürer, M., Stevenson, M., & Land, M. J., 2016. On the integration of input and output control: Workload Control order release. International Journal of Production Economics, 174, 43–53. DOI: 10.1016/j.ijpe.2016.01.005
  42. Thürer, M., Stevenson, M., & Qu, T., 2016. Job sequencing and selection within workload control order release: An assessment by simulation. International Journal of Production Research, 54(4), 1061–1075. DOI: 10.1080/00207543.2015.1047978
  43. Thürer, M., Stevenson, M., Silva, C., & Land, M., 2013. Towards an integrated workload control (WLC) concept: The performance of due date setting rules in job shops with contingent orders. International Journal of Production Research, 51(15), 4502–4516. DOI: 10.1080/00207543.2013.774485
  44. Thürer, M., Stevenson, M., Silva, C., Land, M. J., & Fredendall, L. D., 2012a. Workload control and order release: A lean solution for make-to-order companies. Production and Operations Management, 21(5), 939–953. DOI: 10.1111/j.1937-5956.2011.01307.x
  45. Thürer, M., Stevenson, M., Silva, C., Land, M. J., Fredendall, L. D., & Melnyk, S. A., 2014a. Lean control for make-to-order companies: Integrating customer enquiry management and order release. Production and Operations Management, 23(3), 463–476. DOI: 10.1111/poms.12058
  46. Thürer, M., Ma, L., & Stevenson, M., 2021. Workload Control order release in general and pure flow shops with limited buffer size induced blocking: an assessment by simulation. International Journal of Production Research, 59(8), 2558–2569. DOI: 10.1080/00207543.2020.1735667
  47. Ünal, C., & Bekiroǧlu, B., 2024. Simulation Analysis of the Effect of Working Method Differences on Production Efficiency in the Apparel Industry. Fibres and Textiles in Eastern Europe, 32(3), 21–28. DOI: 10.2478/ftee-2024-0017
  48. Vieira, M., Moniz, S., Gonçalves, B. S., Pinto-Varela, T., Barbosa-Póvoa, A. P., & Neto, P., 2022. A two-level optimisation-simulation method for production planning and scheduling: the industrial case of a human–robot collaborative assembly line. International Journal of Production Research, 60(9), 2942–2962. DOI: 10.1080/00207543.2021.1906461
  49. Wang, H., Jiang, Y., Wang, H., & Luo, H., 2022. An online optimization scheme of the dynamic flexible job shop scheduling problem for intelligent manufacturing. 2022 4th International Conference on Industrial Artificial Intelligence (IAI), 1–6. DOI: 10.1109/IAI55780.2022.9976820
DOI: https://doi.org/10.30657/pea.2026.32.37 | Journal eISSN: 2353-7779 | Journal ISSN: 2353-5156
Language: English
Page range: 449 - 460
Submitted on: Feb 19, 2026
Accepted on: Mar 20, 2026
Published on: Jun 23, 2026
In partnership with: Paradigm Publishing Services

© 2026 Aruna Prabhu, Srinivas Shenoy Heckadka, Ramakrishna Vikas Sadanand, Augustine B.V. Barboza, published by Quality and Production Managers Association
This work is licensed under the Creative Commons Attribution 4.0 License.