References
- Betterton, C. E., & Cox, J. F., 2009. Espoused drum-buffer-rope flow control in serial lines: A comparative study of simulation models. International Journal of Production Economics, 117(1), 66–79. DOI: 10.1016/j.ijpe.2008.08.050
- Bortolotti, P., Berry, D., Murray, R., Gaertner, E., Jenne, D., Damiani, R., Barter, G., & Dykes, K., 2019. A Detailed Wind Turbine Blade Cost Model. www.nrel.gov/publications.
- Breithaupt, J. W., Land, M., & Nyhuis, P., 2002. The workload control concept: Theory and practical extensions of load oriented order release. Production Planning and Control, 13(7), 625–638. DOI: 10.1080/0953728021000026230
- Chakravorty, S. S., 2001. An evaluation of the DBR control mechanism in a job shop environment. In Omega, 29. www.elsevier.com/locate/dsw
- Chiara Leva, M., Demichela, M., Comberti, L., & Caimo, A., 2022. Human performance in manufacturing tasks: Optimization and assessment of required workload and capabilities. Safety Science, 154. DOI: 10.1016/j.ssci.2022.105838
- Costa, F., Kundu, K., Rossini, M., & Portioli-Staudacher, A., 2023. Comparative study of bottleneck-based release models and load-based ones in a hybrid MTO-MTS flow shop: an assessment by simulation. Operations Management Research, 16(1), 33–48. DOI: 10.1007/s12063-022-00276-6
- Fernandes, N. O., Thürer, M., Silva, C., & Carmo-Silva, S., 2017. Improving workload control order release: Incorporating a starvation avoidance trigger into continuous release. International Journal of Production Economics, 194, 181–189. DOI: 10.1016/j.ijpe.2016.12.029
- Fredendall, L. D., Ojha, D., & Wayne Patterson, J., 2010. Concerning the theory of workload control. European Journal of Operational Research, 201(1), 99–111. DOI: 10.1016/j.ejor.2009.02.003
- Germs, R., & Riezebos, J., 2010. Workload balancing capability of pull systems in MTO production. International Journal of Production Research, 48(8), 2345–2360. DOI: 10.1080/00207540902814314
- Huang, Y., 2017. Information architecture for effective Workload Control: an insight from a successful implementation. Production Planning and Control, 28(5), 351–366. DOI: 10.1080/09537287.2017.1288278
- Hurley, S. F., & Whybark, D. C., 1999. Inventory and capacity trade-offs in a manufacturing cell. In Int. J. Production Economics (Vol. 59).
- Kadipasaoglu, S. N., Xiang, W., Hurley, S. F., & Khumawala, B. M., 2000. A study on the effect of the extent and location of protective capacity in flow systems. In Int. J. Production Economics (Vol. 63).
- Kim, S., Cox, J. F., & Mabin, V. J., 2010. An exploratory study of protective inventory in a re-entrant line with protective capacity. International Journal of Production Research, 48(14), 4153–4178. DOI: 10.1080/00207540902991666
- Kingsman, B., & Hendry, L., 2002. The relative contributions of input and output controls on the performance of a workload control system in make-to-order companies. Production Planning and Control, 13(7), 579–590. DOI: 10.1080/0953728021000026285
- Land, M., & Gaalman, G., 1996. Workload control concepts in job shops A critical assessment. In Int. J. Production Economics (Vol. 46).
- Land, M. J., Stevenson, M., Thürer, M., & Gaalman, G. J. C., 2015. Job shop control: In search of the key to delivery improvements. International Journal of Production Economics, 168, 257–266. DOI: 10.1016/j.ijpe.2015.07.007
- Land, M., Stevenson, M., & Thürer, M., 2014. Integrating load-based order release and priority dispatching. International Journal of Production Research, 52(4), 1059–1073. DOI: 10.1080/00207543.2013.836614
- Liu, R., Li, X., & Chen, S., 2019. Extension Analysis of Manufacturing Cost and Construction of basic-elements Model. Procedia Computer Science, 162, 156–165. DOI: 10.1016/j.procs.2019.11.271
- Lu, H. L., Huang, G. Q., & Yang, H. D., 2011. Integrating order review/release and dispatching rules for assembly job shop scheduling using a simulation approach. International Journal of Production Research, 49(3), 647–669. DOI: 10.1080/00207540903524490
- Ma, L., Zhong, R. Y., Yuan, M., Ding, K., Thürer, M., Pan, Y., Qu, T., & Huang, G. Q., 2025. A human-centric order release method based on workload control in high-variety make-to-order shops towards Industry 5.0. Robotics and Computer-Integrated Manufacturing, 94. DOI: 10.1016/j.rcim.2024.102946
- Qi, C., Sivakumar, A. I., & Gershwin, S. B., 2009. An efficient new job release control methodology. International Journal of Production Research, 47(3), 703–731. DOI: 10.1080/00207540701455335
- Riezebos, J., Korte, G. J., & Land, M. J., 2003. Improving a practical DBR buffering approach using Workload Control. International Journal of Production Research, 41(4), 699–712. DOI: 10.1080/0020754031000065485
- Sagawa, J. K., Oliveira, A. F., Mušič, G., Land, M. J., & Maluf, A. S., 2023. Smart workload input-output control of production systems: A proof of concept. European Journal of Operational Research, 309(1), 286–305. DOI: 10.1016/j.ejor.2022.12.034
- Sargent, R. G., 2010. Verification and validation of simulation models. Proceedings of the 2010 Winter Simulation Conference, 166–183. DOI: 10.1109/WSC.2010.5679166
- Singh, R., & Mathirajan, M., 2019. Investigation of different inputs and a new release policy in the proposed simulation model for wafer fabrication system. Sādhanā, 44(2), 41. DOI: 10.1007/s12046-018-1006-8
- Soepenberg, G. D., Land, M. J., & Gaalman, G. J. C., 2012. Workload control dynamics in practice. International Journal of Production Research, 50(2), 443–460. DOI: 10.1080/00207543.2010.539277
- Thürer, M., Land, M. J., Stevenson, M., & Fredendall, L. D., 2017. On the integration of due date setting and order release control. Production Planning and Control, 28(5), 420–430. DOI: 10.1080/09537287.2017.1302102
- Thürer, M., Qu, T., Stevenson, M., Li, C. D., & Huang, G. Q., 2017. Deconstructing bottleneck shiftiness: the impact of bottleneck position on order release control in pure flow shops. Production Planning and Control, 28(15), 1223–1235. DOI: 10.1080/09537287.2017.1362486
- Thürer, M., Stevenson, M., & Land, M. J., 2016. On the integration of input and output control: Workload Control order release. International Journal of Production Economics, 174, 43–53. DOI: 10.1016/j.ijpe.2016.01.005
- Thürer, M., Stevenson, M., Land, M. J., & Fredendall, L. D., 2019. On the combined effect of due date setting, order release, and output control: an assessment by simulation. International Journal of Production Research, 57(6), 1741–1755. DOI: 10.1080/00207543.2018.1504250
- Thürer, M., Stevenson, M., Silva, C., Land, M., & Filho, M. G., 2013. Workload control and order release in two-level multi-stage job shops: An assessment by simulation. International Journal of Production Research, 51(3), 869–882. DOI: 10.1080/00207543.2012.676685
- Thürer, M., Stevenson, M., Silva, C., Land, M. J., Fredendall, L. D., & Melnyk, S. A., 2014. Lean control for make-to-order companies: Integrating customer enquiry management and order release. Production and Operations Management, 23(3), 463–476. DOI: 10.1111/poms.12058
- Thürer, M., Stevenson, M., Silva, C., & Qu, T., 2017. Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation. International Journal of Production Economics, 188, 116–127. DOI: 10.1016/j.ijpe.2017.03.025
- Wang, Y., Liu, J., Zhou, L., Cong, L., & Sutherland, J. W., 2024. Integrated operation planning and process adjustment for optimum cost with attention to manufacturing quality and waste. Journal of Manufacturing Systems, 73, 241–255. DOI: 10.1016/j.jmsy.2024.02.004