Have a personal or library account? Click to login
The analysis of machine operation and equipment loss in ironworks and steelworks Cover

The analysis of machine operation and equipment loss in ironworks and steelworks

By: Adrian Maszke  
Open Access
|Jan 2020

Abstract

The article presents a case study of the identification and analysis of operating and equipment losses in a steel plant. Losses may be visible in costs resulting from premature wear of machine and equipment components, removal of emergency failures related to quality losses, including loss of reputation of a reliable supplier, as well as losses related to production, especially in the case of continuous production. The analysis of losses was based on the cost criterion, including losses resulting from the loss of a potential client. The real data from the 2016 were used in the case study. In order to ensure proper operation at the finishing department, standard solutions have been developed. The analysis of losses was based on the Pareto principle and the analysis of TPM coefficients.

DOI: https://doi.org/10.30657/pea.2017.17.10 | Journal eISSN: 2353-7779 | Journal ISSN: 2353-5156
Language: English
Page range: 45 - 48
Submitted on: Sep 28, 2017
Accepted on: Dec 28, 2017
Published on: Jan 28, 2020
Published by: Quality and Production Managers Association
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2020 Adrian Maszke, published by Quality and Production Managers Association
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.