Have a personal or library account? Click to login
Development and First Year Operation of Extended Wastewater Treatment Plant in Dobron Cover

Development and First Year Operation of Extended Wastewater Treatment Plant in Dobron

Open Access
|Nov 2011

Abstract

The aim of the investigation was characterizing and operation assessment of the wastewater treatment plant in Dobron taking into consideration its flow capacity, before (350 m3/d) and after development including building of the second technological pipe with the same flow capacity (350 m3/d), finished in September, 2009. Concise description of the applied wastewater treatment technology and results of investigations concerning flow rates of wastewater within last few years, are presented. Example results of wastewater composition analysis and reached treatment conversion are described. Analysis results of screenings, sand removed from sand traps and stabilized sludge are shown.

DOI: https://doi.org/10.2478/v10216-011-0011-1 | Journal eISSN: 2084-4549 | Journal ISSN: 1898-6196
Language: English
Page range: 107 - 115
Published on: Nov 8, 2011
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2011 Andrzej Żarczyński, Piotr Witczak, published by Society of Ecological Chemistry and Engineering
This work is licensed under the Creative Commons License.

Volume 19 (2012): Issue 1 (March 2012)