Minimizing total tardiness in no-wait flowshops
By: Tariq Aldowaisan and Ali Allahverdi
Open Access
|Oct 2012References
- [1] Aldowaisan, T., and Allahverdi, A. No-wait flowshop scheduling problem to minimize the number of tardy Jobs.2012 (to appear).
- [2] Aldowaisan T, Allahverdi A. A new heuristic for m-machine no-wait flowshop to minimize total completion time.2004; 32: 345-352.
- [3] Aldowaisan T, Allahverdi A. New heuristics for no-wait flowshops to minimize makespan.2003; 30: 1219-1231.
- [4] Allahverdi A, Aldowaisan T. No-wait flowshops with bicriteria of makespan and maximum lateness.2004; 152: 132-147.
- [5] Allahverdi A, Aldowaisan T. No-wait flowshops with bicriteria of makespan and total completion time.2002; 53: 1004-1015.
- [6] Allahverdi, A., Gupta, J.N.D., and Aldowaisan, T. A review of scheduling research involving setup considerations.1999; 27: 219-239.
- [7] Allahverdi, A., Ng, C.T., Cheng, T.C.E., and Kovalyov, M.Y. A survey of scheduling problems with setup times or costs.h 2008; 187: 985-1032.
- [8] Chang JL, Gong DW, Ma XP. A heuristic genetic algorithm for no-wait flowshop scheduling problem2007; 17: 582-586.
- [9] Chen CL, Neppalli RV, Aljaber N. Genetic Algorithms Applied to the Continuous Flow Shop Problem.1996; 30: 919-929.
- [10] Framinan JM, Nagano MS. Evaluating the performance for makespan minimization in no-wait flowshop sequencing. Journal2008; 197: 1-9.
- [11] Framinan, J.M., Leisten, R. Total tardiness minimization in permutation flow shops: a simple approach based on a variable greedy algorithm. International2008; 46: 6479-6498.
- [12] Hall NG, Sriskandarajah C. A survey of machine scheduling problems with blocking and no-wait in process.1996; 44: 510-525.
- [13] Lenstra JK, Rinnooy Kan, AHG., Brucker P. Complexity of machine scheduling problems.1977; 1: 343-362.
- [14] Nawaz M, Enscore E, Ham I. A heuristic algorithm for the m-machine, n-job flowshop sequencing problem.1983; 11: 91-95.
- [15] Pan QK, Tasgetiren MF, Liang YC. A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problem.2008; 35: 2807-2839.
- [16] Pinedo M (1995). Prentice Hall, Englewood Cliffs, New Jersey.
- [17] Vallada, E., Ruiz, R. Genetic algorithms with path relinking for the minimum tardiness permutation flowshop problem.2010; 38: 57-67.
- [18] Vallada, E., Ruiz, R., Minella, G. Minimizing total tardiness in the m-machine flowshop problem: A review and evaluation of heuristics and metaheuristics.2008; 35: 1350-1373.
- [19] Warburton RDH. EOQ extensions exploiting the Lambert W function.2009; 3: 45-69.
DOI: https://doi.org/10.2478/v10209-011-0009-6 | Journal eISSN: 2300-3405 (formerly 0867-6356) | Journal ISSN: 0867-6356
Language: English
Page range: 149 - 162
Published on: Oct 1, 2012
Published by: Poznan University of Technology
In partnership with: Paradigm Publishing Services
Keywords:
Related subjects:
© 2012 Tariq Aldowaisan, Ali Allahverdi, published by Poznan University of Technology
This work is licensed under the Creative Commons License.