Have a personal or library account? Click to login
A review of fuzzy risk assessment models for construction projects Cover

A review of fuzzy risk assessment models for construction projects

Open Access
|Nov 2012

References

  1. [1] An M., Baker C., and Zeng, J., (2005), A Fuzzy Logic-Based Approach to Qualitative Risk Modeling in the Construction Process, World Journal of Engineering, 2, 1-2.
  2. [2] Baloi, D., and Price, A. D. F. (2003). Modeling global risk factors affecting construction cost performance, International Journal of Project Management, 21, 261-269.10.1016/S0263-7863(02)00017-0
  3. [3] Bannerman, P. L. (2008). Risk and risk management in software projects: A reassessment. The Journal of Systems and Software, 81(12), 2118-2133.10.1016/j.jss.2008.03.059
  4. [4] Bennett, J.C, Bohoris, G.A., E.M. (1996), Aspinwall, R.C. Hall, Risk analysis techniques and their application to software development, European Journal of Operation Research, 95, 467-475.
  5. [5] Bowles, J. B., and Pelaez, C. E. (1995). Fuzzy logic prioritization in a system failure mode, effects and criticality analysis, Reliability Engineering and System Safety, 50, 203-213.10.1016/0951-8320(95)00068-D
  6. [6] Chapman, C., (1997). Project risk analysis and management - the PRAM generic process, International Journal of Project Management, 15, 273-281.10.1016/S0263-7863(96)00079-8
  7. [7] Chia, S.E. (2006). Risk assessment framework for project management. IEEE, 376-379.10.1109/IEMC.2006.4279889
  8. [8] Cho, H. N., Choi, H. H., and Kim, Y. B. (2002). A risk assessment methodology for incorporating uncertainties using fuzzy concepts. Reliability Engineering and System Safety, 78, 173-183.10.1016/S0951-8320(02)00158-8
  9. [9] Choi, H., Cho, H., and Seo, J. W. (2004). Risk assessment methodology for underground construction projects. Journal of Construction Engineering and Management, 130(2), 258-272.10.1061/(ASCE)0733-9364(2004)130:2(258)
  10. [10] Cooper, D.F., Champan, C.B., (1987). Risk Analysis for a Large Project.Wiley, Chichester.
  11. [11] Dikmen, I., Birgonul, M., Han, S., (2007). Using fuzzy risk assessment to rate cost overrun risk in international construction projects. International Journal of Project Management, 25, 494-505.10.1016/j.ijproman.2006.12.002
  12. [12] Douglas, Hubbard (2009). The failure of risk management: Why it`s broken and how to fix it. John Wiley and Sons, p. 46
  13. [13] Elkington, P., and Smallman, C. (2002). Managing project risks: A case study from the utilities sector. International Journal of Project Management, 20, 49-57.10.1016/S0263-7863(00)00034-X
  14. [14] Hillson, D. (2004). Effective opportunity management for projects - exploiting positive risk. New York: Marcel Dekker10.1201/9780203913246
  15. [15] Huang, D., Chen, T., and Wang, M.-J. (2001). A fuzzy set approach for event tree analysis. Fuzzy Sets and Systems, 118, 153-165.10.1016/S0165-0114(98)00288-7
  16. [16] Institute of Risk Management, (2002). A risk management. Standard Institute of Risk Management.
  17. [17] Institution of Civil Engineers, (2002). Risk Analysis and Management for Projects (RAMP). Institution of Civil Engineers and Faculty and Institute of Actuaries. Thomas Telford, London.
  18. [18] Kangari, R. (1988), Construction Risk Management, Civil Engineering System, 5, September 1988.10.1080/02630258808970516
  19. [19] Kangari, R. and Riggs, L.S (1989) Construction Risk Assessment by Linguistics, IEEE Transaction on Engineering Management, 36(2), 126-131.10.1109/17.18829
  20. [20] KarimiAzari, et al. (2011). Risk assessment model selection in construction industry, Expert Systems with Applications, 38, 9105-9111.10.1016/j.eswa.2010.12.110
  21. [21] Kaufmann, A., and Gupta, M. M. (1988). Fuzzy mathematical models in engineering and management science. Amsterdam: North-Holland.
  22. [22] Klemetti, A. (2006). Risk management in construction project networks. Report 2006/ 2. Finland: Laboratory of Industrial Management, Helsinki University of Technology.
  23. [23] Lichtenstein, Sh. (1996). Factors in the selection of a risk assessment method. Information Management and Computer Security, 4, 20-25.10.1108/09685229610130503
  24. [24] Nieto-Morote, A., Ruz-Vila, F., (2011). A fuzzy approach to construction project risk assessment, International Journal of Project Management, 29, 220-23110.1016/j.ijproman.2010.02.002
  25. [25] Olsson, R. (2007). In search of opportunity management: Is the risk management process enough? International Journal of Project Management, 25, 745-752.10.1016/j.ijproman.2007.03.005
  26. [26] Paek, J.H., Lee, Y.W. and Ock, J.H (1993). “Pricing Construction Risks: Fuzzy Set Theory” Journal of Construction Engineering and Management, 119(4), 743-756.10.1061/(ASCE)0733-9364(1993)119:4(743)
  27. [27] Project Management Institute, (2008). A guide to the project management body of knowledge. Project Management Institute Standards Committee.
  28. [28] Rainer, R.K.J.R., Snyder, C.A., Carr, H.H. (1991) Risk analysis for information technology, Journal of Management Information Systems, 8 (1), 129-147.10.1080/07421222.1991.11517914
  29. [29] Raz T, Shenhar AJ, Dvir D. (2002). Risk management, project success, and technological uncertainty. R&D Management, 32, 101-109.10.1111/1467-9310.00243
  30. [30] Tah, J.H.M., Thorpe, A., McCaffer, R., (1993). Contactor project risks contingency allocation using linguistic approximation. Computing System in Engineering, 4, 281-293.10.1016/0956-0521(93)90052-X
  31. [31] Taroun, A., Yang, J.B., Lowe, D., (2011). Construction Risk Modeling and Assessment: Insights from a Literature Review, The Built and Human Environment Review, Volume 4, Special Issue 1.
  32. [32] Terano, T., Asai, K., and Sugeno, M. (1992). Fuzzy systems theory and its applications. San Diego, CA: Academic Press.
  33. [33] Tuysuz and Kahreman (2006). Project Risk Evaluation Using a Fuzzy Analytic Hierarchy Process: An Application to Information Technology Projects, International Journal of Intelligent Systems, 21, 559-58410.1002/int.20148
  34. [34] Wang, Y.M., Elhag, T.M.-S., (2007). A fuzzy group decision making approach for bridge risk assessment. Computers and Industrial Engineering, 53, 137-148.10.1016/j.cie.2007.04.009
  35. [35] White, D. (1995). Application of systems thinking to risk management: A review of the literature. Management Decision, 3(10), 35-45.10.1108/EUM0000000003918
  36. [36] Wirba, E.N., Tah, J.H.M., Howes, R., (1996). Risk interdependencies and natural language computations. Journal of Engineering, Construction and Architectural Management, 3, 251-269.10.1108/eb021034
  37. [37] Zadeh, L.A., (1965). Fuzzy sets. Information Control 8, 338-353.10.1016/S0019-9958(65)90241-X
  38. [38] Zeng, J., An, M., and Smith, N. J. (2007). Application of a fuzzy based decision making methodology to construction project risk assessment. International Journal of Project Management, 25, 589-600.10.1016/j.ijproman.2007.02.006
  39. [39] Zhang, G., Zou, P.X.W., (2007). Fuzzy analytical hierarchy process risk assessment approach for joint venture construction projects in China. Journal of Construction Engineering and Management 133, 771-779.10.1061/(ASCE)0733-9364(2007)133:10(771)
DOI: https://doi.org/10.2478/v10189-012-0016-5 | Journal eISSN: 1338-3973 | Journal ISSN: 1210-3896
Language: English
Page range: 35 - 40
Published on: Nov 8, 2012
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2012 Pejman Rezakhani, published by Slovak University of Technology in Bratislava
This work is licensed under the Creative Commons License.