Have a personal or library account? Click to login
Combining spatial and other objectives in forest design Cover

Combining spatial and other objectives in forest design

By: Bo Chen and  Klaus von Gadow  
Open Access
|Mar 2011

References

  1. Barrett, T. M., Gilless, J. K. 2000. Even-aged restriction with sub-graph adjacency. - Annals of Operations Research, 95, 259-175.
  2. Bettinger, P. Seccions, J., Johnson, K. N. 1998. Ensuring the compatibility of aquatic habitat and commodity production goals in eastern Oregon with a Tabu search procedure. - Forest Science, 44(1), 96-112
  3. Bettinger, P., Sessions, J., Boston, K. 1997. Using tabu search to schedule timber harvests subject to spatial wildlife goals for big game. - Ecological Modelling, 94, 111-123.
  4. Carter, D. R., Vogitazis, M., Moss, C. B., Arvantis, L. G. 1997. Ecosystem management or infeasible guidelines? Implications of adjacency restrictions for wildlife habitat and timber production. - Canadian Journal of Forest Research, 27, 1302-1310.
  5. Chen, B. W., Gadow, K.v. 2002. Timber harvest planning with spatial objectives, using the method of simulated annealing. - Forstwissenschaftliches Centralblatt, 121, 25-3410.1046/j.1439-0337.2002.01041.x
  6. Clutter, J. L., Fortson, J. C., Pienaar, L. V., Brister, G. H., Bailey, R. L. 1983. Timber Management - A Quantitative Approach. Wiley, 238-252.
  7. Gadow, K.v. 1991. Integration of single- and general forest utilization in forest management. (Integration von Einzel- und Gesamtnutzungsplanung in der Forsteinrichtung). - Allgemeine Forst- und Jagdzeitung, 162(4), 72-75. (In German).
  8. Gadow, K.v., Kurttila, M., Leskinen, P., Leskinen, L., Nuutinen, T., Pukkala, T. 2007. Designing forested landscapes to provide multiple services. - CAB Reviews: Perspectives in Agriculture, Veterinary Science, Nutrition and Natural Resources 2007 2, No. 038, 1-15.
  9. Gadow, K.v., Pukkala, T. 2008. Designing Green Landscapes. Vol. 15 of the Book Series "Managing Forest Ecosystems". Springer Verlag, Dordrecht. 301 pp.
  10. Hille, M., Hessenmöller, D. Möhring, B., Gadow, K.v. 1999. Evaluating alternative silvicultural regimes in a 110-year old beech forest. - Provisional Proceedings "From Theory to Practice - Gaps and Solutions in Managerial Economics and Accounting in Forestry", Prague, Czech Republic, May 1999, 94-100.
  11. Hinrichs, L. 2006. Generating management paths for multi-species forests. (Automatisierte Generierung von Behandlungspfaden für Mischbestände.) - Allgemeine Forst- und Jagdzeitung, 177(5), 77-85. (In German).
  12. Hof, J. G., Joyce, L. A. 1992. Spatial optimization for wildlife and timber in managed forest ecosystems. - Forest Science, 38(3), 489-508.
  13. Hof, J. G., Joyce, L. A. 1993. A mixed integer linear programming approach for apatially optimisating wildlife and timber in managed forest ecosystems. - Forest Science, 39(4), 816-834.
  14. Hof, J. G., Bevers, M., Joyce, L. A., Kent, B. 1994. An integer programming approach for spatially and temporally optimising wildlife population. - Forest Science, 39(4), 816-834.
  15. Hoganson, H. M., Rose, D. W. 1984. A simulation approach for optimal timber management scheduling. - Forest Science, 30(1), 200-238.
  16. Jones, J.G, Meneghin, B, Kirby M. W. 1991. Formulating adjacency constraints in linear optimization models for scheduling projects in tactical planning. - Forest Science, 37(5), 1283-1297.
  17. Lappi, J. 1992. JLP - a linear programming package for management planning. The Finnish Forest Research Institute, Research Paper, 414. 131 pp
  18. Murray, A. T. 1999. Spatial restrictions in harvests scheduling. - Forest Science, 45, 45-52.
  19. Öhman, K., Eriksson, L. O. 1998. The core area concept in forming contiguous areas for long-term forest planning. - Canadian Journal of Forest Research, 28(7), 1032-1039.
  20. Öhman, K. 2000. Creating continuous area of old forest in long-term forest planning. - Canadian Journal of Forest Research, 30(11), 1817-1823.
  21. Pukkala, T., Kangas, J. 1993. A heuristic optimization method for forest planning and decision making. - Scandinavian Journal of Forest Research, 8, 560-570.
  22. Rodriguez, L. 1996. A Microcomputer Program for Solving Forest Scheduling Problems with Heuristic Approaches. - Päivinen, R., Roihuvuo, L., Siitonen, M. (eds.). Large-scale forestry scenario models - experiences and requirements. European Forest Institute, EFI Proceedings, 5, 153-166.
  23. Sánchez-Orois, S., Gurjanov, M., Schröder, J. 2001. Analysis of basal area growth in even-aged spruce stands. (Analyse des Grundflächenzuwachses gleichaltriger Fichtenreinbestände.) - Allgemeine Forst- und Jagdzeitung, 172(3), 51-59
  24. Schübeler, D. 1997. Analysing site-dependent growth in spruce. (Untersuchungen zur standortabhängigen Wachstumsmodellierung bei der Fichte.) - Dissertation (University of Göttingen). (In German).
  25. Seo, J.-H., Vilčko, F., Sánchez Orois, S., Kunth, S., Son, Y-M., Gadow, K.v. 2005. A case study of forest management planning using a new heuristic algorithm. - Tree Physiology, 25, 929-938.
  26. Spellmann, H. and Nagel, J., Böckmann, T. 1999. Harvest planning based on systematic sample plots. (Summarische Nutzungsplanung auf der Basis von Betriebsinventurdaten). - Allgemeine Forst und Jagdzeitung, 170(7), 122-128. (In German).
  27. Van Deusen, P. C. V. 2001. Scheduling spatial arrangement and harvest simultaneously. - Silva Fennica, 35(1), 85-92.
  28. Vilčko, F. 2002. Quantifying harvest events anf yields in spruce stands. (Zur Quantifizierung forstlicher Eingriffe und Ertragsprognose in Fichtenbestände). - Unveröffentlichtes Manuskript, 22 p. (In German).
  29. Ware, G. O., Clutter, J. L. 1971. A mathematical programming system for the management of industrial forests. - Forest Science, 17, 428-445.
  30. Yoshimoto A. 2000. Risk analysis in the context of timber harvest planning. - Gadow, K.v. (ed.). Risk Analysis in Forest Management. Kluwer Academic Publishes.10.1007/978-94-017-2905-5_5
  31. Yoshimoto, A. 2001. Potential use of a spatially constrained harvest scheduling model for biodiversity concerns: exclusion periods to create heterogeneity in forest structure. - Journal of Forest Research, 6(1), 21-30.
DOI: https://doi.org/10.2478/v10132-011-0053-2 | Journal eISSN: 1736-8723 | Journal ISSN: 1406-9954
Language: English
Page range: 30 - 40
Published on: Mar 24, 2011
Published by: Estonian University of Life Sciences
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year

© 2011 Bo Chen, Klaus von Gadow, published by Estonian University of Life Sciences
This work is licensed under the Creative Commons License.

Volume 48 (2008): Issue 2008 (June 2008)