Skip to main content
Have a personal or library account? Click to login
Development of a Web Application for Dynamic Production Scheduling in Small and Medium Enterprises Cover

Development of a Web Application for Dynamic Production Scheduling in Small and Medium Enterprises

Open Access
|Jun 2010

References

  1. Akkermans, H. A., Bogerd, P., Yucesan, E. & van Wassenhove, L. N. (2003). The impact of ERP on supply chain management: Exploratory findings from a European Delphi study,, 146(2), 284-301, DOI: 10.1016/S0377-2217(02)00550-7.
  2. Bernik, I. (2001). Večkriterijsko razporejanje z genetskimi algoritmi in vizualno simulacijo s Petri mrežami [Multicriteria production scheduling with genetic algorithms and visual simulation with Petri Nets], Doctoral Dissertation (in Slovenian), University of Maribor, Faculty of Organizational Sciences.
  3. Breskvar, U. & Kljajić M. (2001). Možnost uporabe simulacijskega modela v naročniški proizvodnji [Possibility of using a simulation model in a make-to-order production].Editor: Vukovič, G., Portorož 2001, p. 1075-1079, Kranj: Moderna organizacija.
  4. Buchmeister, B., Palčič, I. & Pavlinjek, J. (2008). Nekonvencionalne metode terminiranja proizvodnih procesov [Unconventional methods for production process termination].: (proceedings). Editors: Polajnar, A., Bračko, B., Junkar, M., Portorož 7-9 October 2008, p. 67-74, Ljubljana: GZS, Združenje kovinske industrije, Odbor za orodjarstvo; v Mariboru: Fakulteta za strojništvo.
  5. Caseau, Y. & Laburthe, F. (1995).Technical report, LIES, Ecole Normale Superieure de Paris.
  6. Chen, H., Ihlow, J. & Lehmann, C. (1999). A Genetic Algorithm for Flexible Job-Shop Scheduling,, Detroit, Michigan, 10-15 May 1999, pp. 1120-1125, Los Alamitos, CA: IEEE Computer Society.
  7. Choi, H. R., Kim, H. S., Park, B. J., Park, Y. J. & Whinston, A. B. (2004). An agent for selecting optimal order set in EC marketplace,, 36(4), 371-383, DOI: 10.1016/S0167-9236(03)00027-7.
  8. Choi, S. H. & Yang, F. Y. (2006). A filter search algorithm based on machine-order space for job-shop scheduling problems,, 17(3), 376-392, DOI: 10.1108/17410380610648326.
  9. Davis, L. (1985). Job shop scheduling with genetic algorithms.Editor: Grefenstette, J. J., Pittsburgh, PA, 24-26 July 1985, pp. 136-140, Hillsdale, NJ, USA: L. Erlbaum Associates Inc.
  10. Derigs, U. & Jenal, O. (2005). A GA-based decision support system for professional course scheduling at Ford Service Organisation., 27(1), 147-162, DOI: 10.1007/s00291-004-0180-8.
  11. Deserno, T. M., Gïld, M. O., Plodowski, B., Spitzer, K. & Wein, B. B. (2008). Extended Query Refinement for Medical Image Retrieval., 21(3), 280-289, DOI: 10.1007/s10278-007-9037-4.
  12. Dorn, J., Slany, W. (1994). A flow shop with compatibility constraints in a steel making plant.Editors: Zwebenm M., Fox, M., pp. 629-654, San Francisco: Morgan Kaufmann.
  13. Eiben, A. E., Marchiori, E., & Valko, V. A. (2004). Evolutionary algorithms with on-the-fly population size adjustment. Lecture Notes in Computer Science, Vol. 3242, Parallel Problem Solving from Nature - PPSN VIII, 8th International Conference Proceedings, Editors: Yao, X. et al., Birmingham, 18-22 September 2004, pp. 41-50, Berlin: Springer.
  14. Gen, M. & Cheng, R. (1997).New York: John Wiley & Sons, Inc.
  15. Jain, A. S. & Meeran, S. (1998).Dundee, Scotland: Technical report, Department of Applied Physics, Electronic and Mechanical Engineering, University of Dundee.
  16. Kljajić M., Breskvar, U. & Bernik, I. (2001). Planiranje proizvodnje s simulacijo in genetskimi algoritmi [Production planning with simulation and genetic algorithms]., Editor: Zajc, B., Portorož, 24-26 September 2001, pp. 311-314, Ljubljana: IEEE Region 8, Slovenska sekcija IEEE.
  17. Knaflič, A. (2009). Razvoj spletne aplikacije za dinamično razporejanje proizvodnje v malih in srednje velikih podjetjih [Development of a web application for dynamic production scheduling in small and medium enterprises], Master's thesis (in Slovenian), University of Maribor, Faculty of Organizational Sciences.
  18. Kofjač, D. & Kljajić, M. (2008)., 12(3): 992-1001.
  19. Kramberger, T. & Rosi, B. (2007). Do Managers have Enough Quality Information for Decision-Making., 40(3): 207-217.
  20. Ljubič T. (2000).Kranj: Moderna organizacija.
  21. Marinho, J., Braganca, A., Ramos, C. (1999). Decision support system for dynamic production scheduling., Editor:, Porto, 21-24 July 1999, pp. 424-429, Evanston: IEEE Robotics & Automation Society.
  22. Na, D.-G., Jang, W., Kim, D.-W. (2003). Development of a resource planning system for compound semiconductor wafer manufacturing., 138(1-3), 372-378, DOI: 10.1016/S0924-0136(03)00101-8.
  23. Naso, D., Surico, M., Turchiano, B. & Kaymak, U. (2007). Genetic algorithms for supply-chain scheduling: A case study in the distribution of ready-mixed concrete,, 177(3), 2069-2099, DOI: 10.1016/j.ejor.2005.12.019.
  24. Reeves, C. (1995). A genetic algorithm for flow shop sequencing,, 22(1), 5-13.
  25. Smith, S. L. & Mosier, J. N. (1984).Technical Report ESD-TR-84-190, Hanscom Air Force Base, MA: USAF Electronic Systems Division.
  26. Solina, F. (1997).Ljubljana: Fakulteta za računalništvo in informatiko.
  27. Stawowy, A., Duda, J., Osyczka, A. & Jankowski, R. (2007). Web-based Capable to Promise system.Editor: Dura, J. T., pp. 42-56, Krakow: AGH University of Science and Technology Press.
  28. Schuurman, N., Leight, M. & Berube, M. (2008). A Web-based graphical user interface for evidence-based decision making for health care allocations in rural areas., 7(1), 49-61, DOI: 10.1186/1476-072X-7-49.
  29. Shi, X. H., Wan, L. M., Lee, H. P., Yang, X. W., Wang, L. M. & Liang, Y. C. (2003). An improved genetic algorithm with variable population-size and a PSO-GA based hybrid evolutionary algorithm., Xian: 2-5 November 2003, 3: 1735-1740, Los Alamitos: IEEE Computer Society Press.
  30. Tarantilis, C. D., Kiranoudis, C. T. & Theodorakopoulos, N. D. (2008). A Web-based ERP system for business services and supply chain management: Application to real-world process scheduling., 187(3), 1310-1326, DOI: 10.1016/j.ejor.2006.09.015.
DOI: https://doi.org/10.2478/v10051-010-0013-2 | Journal eISSN: 1581-1832 | Journal ISSN: 1318-5454
Language: English
Page range: 125 - 135
Published on: Jun 9, 2010
Published by: University of Maribor
In partnership with: Paradigm Publishing Services

© 2010 Davorin Kofjač, Andrej Knaflič, Miroljub Kljajić, published by University of Maribor
This work is licensed under the Creative Commons License.