Production Control of a Polymerization Plant Based on Production Performance Indicators
By: Dejan Gradišar, Sebastjan Zorzut and Vladimir Jovan
Open Access
|Feb 2009
References
- Aller, F., Kandare, G., Blázquez, L.F., Kukanja, D., Jovan, V. & Georgiadis, M.C. (2007). Model-based optimal control of the production of polyvinyl acetate.- 6, Copenhagen, 16-20 sept. 2007.
- Ahmad, M. M. & Dhafr N. (2002). Establishing and improving manufacturing performance measures., 18(3):171-176.
- Bemporad, A., Morari, M. & Ricker, L. (2006)., The Mathworks, Natwick.
- Dangelmaier, W., Fischer, M., Gausemeier, J., Grafe, M., Matysczok, C. & Mueck, B. (2005). Virtual and augmented reality support for discrete manufacturing system simulation., 56:371-383.
- Folan, P. & Brown, J. (2005). A review of performance measurement: Towards performance management., 56:663-680.
- Forza C. & Salvador, F. (2001). Information flows for high-performance manufacturing,, 70:21-36.
- Ghalayini, A. M., Noble, J. S. & Crowe, T. J. (1996). An integrated dynamic performance measurement system for improving manufacturing competitiveness,, 48:207-225.
- Gradišar, D., Zorzut, S. & Jovan, J. (2007). Model-based production,Edited by Zupančič, B., Karba, R. & Blažič, S. Ljubljana 9-13 sept. 2007.
- Holt, K. (1999). Management and organization through 100 years., 19:135-140.
- Jovan, V. (2001). The integration of management levels in process industries,, Florence, Italy, May 20-23, 1:453-458.
- Larsson T. & Skogestad S. (2000). Plantwide control - a review and a new design procedure., 21(4):209-240.
- Maciejowski, J.M. (1989).Addison-Wesley Publishing Company, Wokingham.
- Morari, M., Arkun, Y. & Stephanopoulos G. (1980). Studies in the synthesis of control structures for chemical processes., 26(2):220-232.
- Morari, M. & Lee, J. H. (1999). Model predictive control: Past, present and future., 23(4-5):667-682.
- Neely, A., Gregory, M. & Platts, K. (1995). Performance measurement system design: A literature review and research agenda., 15(4):80-116.
- Qin, S.J. & Badgwell, T.A. (2003). A survey of industrial model predictive control technology., 11(7):733-764.
- Scherer, E. (1995). Approaches to Complexity and Uncertainty of Scheduling in Process Industries: Process Regulation in Highly Auto-mated Systems,, 91-95, Berlin, Germany.
- Skogestad, S. (2000). Self-optimizing control: The missing link between steady-state optimization and control., 24:569-575.
- Skogestad, S. (2002). Plantwide control: Towards a systematic procedure. In, 12:57-69.
- Stephanopoulos, G. & Ng, C. (2000). Perspectives on the synthesis of plant-wide control structures., 10:97-111.
- Suwignjo, P., Bititci, U.S. & Carrie, A.S. (2000). Quantitative models for performance measurement system., 64(1):231-241.
- Tatsiopoulos, I. P. & Panayiotou, N. (2000). The integration of activity based costing and enterprise modelling for reengineering purposes,, 66:33-44.
- Vicens, E., Alemany, M. E., Andres, C. & Guarch, J. J. (2001). A design and application methodology for hierarchical production planning decision support system in an enterprise integration context,, 74:5-20.
Language: English, Slovenian
Page range: 207 - 217
Published on: Feb 23, 2009
Published by: University of Maribor
In partnership with: Paradigm Publishing Services
Keywords:
Related subjects:
© 2009 Dejan Gradišar, Sebastjan Zorzut, Vladimir Jovan, published by University of Maribor
This work is licensed under the Creative Commons License.