Cost Optimal Project Scheduling Cover
Open Access
|Dec 2008

Abstract

This paper presents the cost optimal project scheduling. The optimization was performed by the nonlinear programming approach, NLP. The nonlinear total project cost objective function is subjected to the rigorous system of the activity precedence relationship constraints, the activity duration constraints and the project duration constraints. The set of activity precedence relationship constraints was defined to comprise Finish-to-Start, Start-to-Start, Start-to-Finish and Finish-to-Finish precedence relationships between activities. The activity duration constraints determine relationships between minimum, maximum and possible duration of the project activities. The project duration constraints define the maximum feasible project duration. A numerical example is presented at the end of the paper in order to present the applicability of the proposed approach.

DOI: https://doi.org/10.2478/v10051-008-0017-3 | Journal eISSN: 1581-1832 | Journal ISSN: 1318-5454
Language: English
Page range: 153 - 158
Published on: Dec 12, 2008
Published by: University of Maribor
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2008 Uroš Klanšek, Mirko Pšunder, published by University of Maribor
This work is licensed under the Creative Commons License.

Volume 41 (2008): Issue 4 (July 2008)