Minimization of the total completion time for asynchronous transmission in a packet data-transmission system
By: Adam Piórkowski and Jan Werewka
Open Access
|Jul 2010References
- Adler, M., Khanna S., Rajaraman, R., and Rosen, A., (1999). Time-constrained scheduling of weighted packets on trees and meshes,, pp. 1-12.
- Adler, M., Rosenberg, A. L., Sitaraman, R., and Unger, W., (1998). Scheduling time-constrained communication in linear networks,, pp. 269-278.
- Bansal, N. and Harchol-Balter, M. (2000). Analysis of SRPT scheduling: Investigating unfairness,, Carnegie Mellon University, Pittsburgh, PA.
- Coulouris, C., Dollimore, J. and Kindberg, T. (2001)., Addison-Wesley, Harlow.
- Dobrin, R. and Fohler, G. (2001). Implementing off-line message scheduling on Controller Area Network (CAN),
- Gouaux, F. and Simon-Chautemps, L. (2002). Ambient intelligence and pervasive systems for the monitoring of citizens at cardiac risk: New solutions from the EPI-MEDICS project,: 289-292.
- Graham, R. L., Lawler, E. L., Lenstra, J. K. and Rinnooy Kan, A. H. G. (1979). Optimization and approximation in deterministic sequencing and scheduling: A survey,(5): 287-326.
- Hamalainen, P., Hannikainen, M., Hamalainen, T. D. and Soininen, R. (2003). Offline architecture for real-time betting,, Vol. I, pp. 709-712.
- Harchol-Balter, M., Bansal, N. and Schroeder, B. (2000). Implementation of SRPT scheduling in web servers,, Carnegie Mellon School of Computer Science, Pittsburgh, PA.
- Janiak, A. and Krysiak, T. (2007). Single processor scheduling with job values depending on their completion times,(2): 129-138.
- Khoor, S., Nieberl, J., Fugedi, K. and Kail, E. (2003). Internet-based, GPRS, long-term ECG monitoring and non-linear heart-rate analysis for cardiovascular telemedicine management,: 209-212.
- Kielmann, T., Hofman, R. F. H., Bal, H. E., Plaat, A. and Bhoedjang, R. A. F. (1999). MPI's reduction operations in clustered wide area systems,, pp. 43-52.
- Liu, C. L., and Layland, J. W. (1973). Scheduling algorithms for multiprogramming in a hard real-time environment,(1): 46-61.
- Lui, K. S. and Zaks, S. (1997). Scheduling in synchronous networks and the greedy algorithm,, Vol. 2, pp. 556-561.
- Osman, M. Y. B., Kin, P. F. W., Leong, L. L. E., Wong, Ch.V., Wong, K. N., Khoon, J. T. L., Goh, S. B., Zainol, M. N. B. and Prakash, E. C. (2000). Simple pools online betting software system—A UML use case analysis,, Vol. 2, pp. 556-561.
- Ramanathan, P. and Rupnick, G. M. (1991). Deadline constrained message scheduling in point-to-point interconnection,, pp. 183-192.
- Smith, W. E. (1956). Various optimizers for single-stage production,(2): 59-66.
- Tsai, B. R. and Shin, K. G. (1996). Combined routing and scheduling of concurrent communication traffic in hypercube multicomputers,, pp. 150-157.
- Yang, B., Dayou L. and Kun Y. (2002). Communication performance optimization for mobile agent system,, pp. 327-335.
- Xu, X. (2008). The videotex hot line lottery-ticket-buying solution based on mobile GPRS system,, pp. 30-35.
- Zhu, X., Yu J. and Doyle J. (2001). Heavy tails, generalized coding and optimal web layout,, Vol. 3, pp. 1617-1626.
Language: English
Page range: 391 - 400
Published on: Jul 2, 2010
Published by: University of Zielona Góra
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year
Related subjects:
© 2010 Adam Piórkowski, Jan Werewka, published by University of Zielona Góra
This work is licensed under the Creative Commons License.