Have a personal or library account? Click to login
New Railway Tunnels and their Construction Method as Well as their Impact to Train Operation Cover

New Railway Tunnels and their Construction Method as Well as their Impact to Train Operation

By: Murat Kalender and  Martin Vojtek  
Open Access
|Dec 2021

References

  1. Aygar, E.B., Gokceoglu, C. 2020 Problems encountered during a railway tunnel excavation in squeezing and swelling materials and possible engineering measures: a case study from Turkey. Sustainability 12:1166. doi:https://doi.org/10.3390/su1203116610.3390/su12031166
  2. Xu L., Huang H.W. 2004 Time effects in rock– support interaction: a case study in the construction of two road tunnels, International Journal of Rock Mechanics and Mining Sciences, Volume 41, Supplement 1, Pages 888-893, ISSN 1365-1609, https://doi.org/10.1016/j.ijrmms.2004.03.153.10.1016/j.ijrmms.2004.03.153
  3. Rabcewicz L. 1964 The New Austrian Tunnelling Method, Part one, Water Power, November 1964, 453-457, Part two, Water Power, December 1964, 511-515
  4. Rabcewicz L. 1965 The New Austrian Tunnelling Method, Part one, Part Three, Water Power, January 1965, 19-24.
  5. Rabcewicz L. & Golser J. 1973 Principles of dimensioning the supporting system for the “New Austrian Tunnelling Method”, Water Power, March 1973, 88-93.
  6. Karakus, Murat & Fowell, R. 2004 An insight into the New Austrian Tunnelling Method (NATM) ROCKMEC’2004-7th Regional Rock Mechanics Symposium, Sivas, Türkiye.
  7. Marek M. et al. Steel fiber reinforced concrete precast tunnel segments: design using nonlinear analysis Online: https://www.cervenka.cz/assets/files/article/%C4%8Dl%C3%A1nek_aplikace_tunel_ejpovice.pdf
  8. Network Statement on Nationwide and Regional Railways Valid for the Preparation of the Timetable 2022 and the Timetable 2022 in forceas of 11. 12. 2020 Ref. No. 80929/2020-SŽ-GŘ-O5 Online:https://www.spravazeleznic.cz/documents/50007830/124638401/Prohl%C3%A1%C5%A1en%C3%AD+2022_en_web.pdf/686f390a-6c42-4557-9756915c2f4d64af
  9. Annual Report 2020, Sprava Zeleznice, Czech Republic Online:https://www.spravazeleznic.cz/documents/50007830/51603047/Annual+report+2020/4cf14d13-e766-4c6b-9dbf-5b181a36b10c
  10. Metroprojekt, Online : https://www.metroprojekt.cz/en/home/tunnels-and-other-underground-constructions/the-turecky-vrch-railway-tunnel
  11. Annual Report 2020, Zelenice Slovenskej Republiky Online:https://www.zsr.sk/files/o-nas/vyrocnespravy/annualreport2020.pdf
  12. Zelenice Slovenskej Republiky Online: http://www.zsr.sk/slovensky/media-room/vyjadrenia-pre-media-2017/marec/zsrmodernizacia-tunel-milochov-tuneldiel.html?page_id=5282
Language: English
Page range: 30 - 33
Published on: Dec 27, 2021
Published by: Univesity of Žilina
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year

© 2021 Murat Kalender, Martin Vojtek, published by Univesity of Žilina
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.