References
- Alfreahat, D. & Sebestyén, Z. (2020) Development of a Risk Management Process for the Construction Sector. In: Creative Construction e-Conference, 2020, 40-45, Budapest University of Technology and Economics.
- Ali, Y. A., Rehman, A., Lala, S. & Sabir, M. (2021) Economic Viability of Foreign Investment in Public Transport of Pakistan – Orange Line Metro Train in Focus. Transnational Corporations Review, 13(3), 321-333.
- Ali, Y., & Sabir, M. (2022) Mode-route Choice Decisions: A Case Study of CPEC Investment in Pakistan Railways. Scientific Journal of Silesian University of Technology. Series Transport, 115, 5-21.
- Ali, Y., Sabir, M., Bilal, M., Ali, M., Ali Khan, A. (2020) Economic Viability of Foreign Investment in Railways: A Case Study of the China-Pakistan Economic Corridor (CPEC). The Engineering Economist, 65(2), 158-175.
- Aziz, S. A., Kassim, R., Idrus, M. & Masirin, M. (2018). Railway Development and the Impact on Malaysian Economy. Journal of Advanced Research in Dynamical & Control Systems, 10(6), 272-280.
- Bing, L., Tiong, R. L.-K., Fan, W. W. & Chew, D. A.-S. (1999) Risk Management in International Construction Joint Ventures. Journal of Construction Engineering and Management, 125(4), 277-284.
- Chaudhry, K. F. (2013) Financial Decline of Pakistan Railways and Prospective Turnaround. International Journal of Railway, 6(4), 131-138.
- Chen, H., Li, H., Wang, Y. & Cheng, B. (2020) A Comprehensive Assessment Approach for Water-Soil Environmental Risk During Railway Construction in the Ecologically Fragile Region Based on AHP and MEA. Sustainability, 12(19), 7910.
- CPEC Authority (2021) China Pakistan Economic Corridor Offical Website. [Online] Available at: http://cpec.gov.pk/project-details/30 [Accessed 1 June 2021].
- Dong, S., Li, Y., Li, Z., Li, F., Cheng, H., Yang, Y., Bilgaev, A., Zheng, J., Bazarzhapov, T. (2018b) Ecological Environment Risks and Green Development Modes of China-Mongolia-Russia Economic Corridor. In: IOP Conference Series: Earth and Environmental Science, 190(1), 012053, IOP Publishing.
- Dong, S., Li, Y., Li, Z., Li, F., Cheng, H., Yang, Y., Bilgaev, A., Zheng, J., Bazarzhapov, T. (2018a) An Evaluation of the Economic, Social, and Ecological risks of China-Mongolia-Russia High-Speed Railway Construction and Policy Suggestions. Journal of Geographical Sciences, 28(7), 900-918.
- El-Sayegh, S. M. (2008) Risk Assessment and Allocation in the UAE Construction Industry. International Journal of Project Management, 26(4), 431-438.
- Fedderke, J. W., Perkins, P. & Luiz, J. M. (2006) Infrastructural Investment in Long-run Economic Growth: South Africa 1875–2001. World Development, 36(6), 1037-59.
- Fremdling, R. (1997) Railroads and German Economic Growth: A Leading Sector Analysis with a Comparison to the United States and Great Britain. The Journal of Economic History, 37(3), 583-604.
- Gul, M. & Celik, E. (2018) Fuzzy Rule-based Fine–Kinney Risk Assessment Approach for Rail Transportation Systems. Human and Ecological Risk Assessment: An International Journal, 24(7), 1786-1812.
- Herranz-Loncán, A. (2011) The Role of Railways in Export-led Growth: The Case of Uruguay, 1870–1913. Economic History of Developing Regions, 26(2), 1-32.
- Hwang, B.-G., Zhao, X. & Chin, E. W. Y. (2017) International Construction Joint Ventures between Singapore and Developing Countries: Risk Assessment. Engineering, Construction and Architectural Management, 24(2).
- Hwang, B., Shan, M. & Supa’at, N. (2017) Green Commercial Building Projects in Singapore: Critical Risk Factors and Mitigation Measures. Sustainable Cities and Society, 30, 237-247.
- Iqbal, S., Choudhry, R., Holschemacher, K., Ali, A. (2015) Risk Management in Construction Projects. Technological and Economic Development of Economy, 21(1), 65-78.
- Junkes, M. B., Tereso, A. P. & Afonso, P. S. (2015) The Importance of Risk Assessment in the Context of Investment Project Management: a Case Study. Procedia Computer Science, 64, 902-910.
- Kaczorek, K., Krzemiński, M. & Ibadov, N. (2017) The Problem of Choosing Risk Management Methodology at the Example of Railway Construction. MATEC Web of Conferences, Les Ulis, France.
- Ke, Y., Wang, S. & Chan, A. P. (2010) Risk Allocation in Public-Private Partnership Infrastructure Projects: A Comparative Study. Journal of Infrastructure Systems, 16(4), 343-351.
- Kowalski, J., Połoński, M. & Lendo–Siwicka, M. (2019) Risk Factors for Delays in Rail Investments Implemented in the Design & Build Contracts. In: MATEC Web of Conferences, 262, 07007. EDP Sciences.
- Kumar, K. S. & Narayanan, R. M. (2021) Review on Construction Risk and Development of Risk Management Procedural Index–A Case Study from Chennai Construction Sector. Materials Today: Proceedings, 43, 1141-1146.
- Li, X., Alam, K. M. & Wang, S. (2018) Trend Analysis of Pakistan Railways based on Industry Life Cycle Theory. Journal of Advanced Transportation, 2018, 1-10.
- Li, H., Zhang, W. & XU, Y. (2013) Risk Analysis and Management of Second Railway Line Construction Adjacent to the Existing Lines. In: ICTIS 2013: Improving Multimodal Transportation Systems-Information, Safety, and Integration, 1907-1914.
- Lin, W., Yaqi, L. & Enmaoa, W. (2011) Research on Risk Management of Railway Engineering Construction. Systems Engineering Procedia, 1, 174-180.
- Losos, E. C., Pfaff, A., Olander, L. P., Mason, S., Morgan, S. (2019) Reducing Environmental Risks from Belt and Road Initiative Investments in Transportation Infrastructure. World Bank: Policy Research Working Paper (8718).
- Ma, G., Luo, H. & Zheng, J. (2017) Research on the Risks of International High-Speed Railway Projects Based on the FIDIC-EPC Total Price Contract. American Society of Civil Engineers, 1402-1411.
- Malik, A. R. (2018) The China–Pakistan Economic Corridor (CPEC): A Game Changer for Pakistan’s Economy. China’s Global Rebalancing and the New Silk Road, 69-83.
- Mieczkowski, B. (1978) Transportation in Eastern Europe: Empirical Findings. East European Quarterly, Boulder.
- Mobey, A. & Parker, D. (2002) Risk Evaluation and Its Importance to Project Implementation. Work Study, 51(4), 202-208.
- Pakistan Railways Wikipedia. (2021) Wikipedia. [Online] Available at: https://en.wikipedia.org/wiki/Pakistan_Railways [Accessed 2 June 2021].
- PMI. (2017) A Guide to the Project Management Body of Knowledge. Sixth Edition ed. Project Management Institute (PMI): USA.
- Połoński, M. & Kowalski, J. (2017) The Identification of Hazards Concerning the Character of Construction Works on Railway Sites in Poland. Technical Transactions, 5, 47-55.
- Rhosani, D. P., Dhokhikah, Y. & Trisiana, A. (2020) Analysis of Technical Risk at Construction Project by Using Fuzzy Logic Method (A Case Study: Grand Sungkono Lagoon). Jurnal Rekayasa Sipil dan Lingkungan, 4(1), 40-50.
- Sahoo, P. & Dash, R. K. (2012) Economic growth in South Asia: Role of Infrastructure. The Journal of International Trade & Economic Development, 21(2), 217-252.
- Sarkar, D. & Singh, M. (2021) Development of Risk Index for Mass Rapid Transit System Project in Western India through Application of Fuzzy Analytical Hierarchy Process. International Journal of Construction Management, 21(5), 439-451.
- Schwartz, J., Andres, L. & Dragoiu, G. (2009) Crisis in Latin America Infrastructure Investment, Employment and the Expectations of Stimulus. Journal of Infrastructure Development, 1(2), 111-131.
- Tang, J. P. (2014) Railroad Expansion and Industrialization: Evidence from Meiji Japan. The Journal of Economic History, 74(3), 863-886.
- Tesfaye, E., Berhan, E. & Kitaw, D. (2016) A Comprehensive Literature Review on Construction Project Risk Analysis. International Journal of Risk and Contingency Management, 5(4), 1-15.
- Toniolo, G. (1983). Railways and Economic Growth in Mediterranean Countries: Some Methodological Remarks. In: Railways and the Economic Development of Western Europe, 1830–1914. Palgrave Macmillan UK, 227-236.
- Wangai, A. W., Rohacs, D. & Bo, A., 2020. Supporting the Sustainable Development of Railway Transport in Developing Countries. Sustainability, 12(9), p. 3572.
- Wang, J.-W., Cheng, C.-H. & Huang, K.-C. (2009) Fuzzy Hierarchical TOPSIS for Supplier Selection. Applied Soft Computing, 9(1), 377-386.
- Wenga, L., Klintuni Boedhihartono, A., Dirks, P., Dixon, J., Lubis, M.I., Sayer, J. A. (2013) Mineral Industries, Growth Corridors and Agricultural Development in Africa. Global Food Security, 2(3), 195-202.
- Zadeh, L. A. (1965) Fuzzy sets. Information and Control, 8(3), 338-353.
- Zou, P., Zhang, G. & Wang, J. (2007) Understanding the Key Risks in Construction Projects in China. International Journal of Project Management, 25(6), 601-614.