Improvement of Productivity in Buildings Construction Cover

References

  1. Gerek, I. H., Erdis, E., Mistikoglu, G. & Usmen, M. A. (2014). Evaluation of plastering crew performance in building projects using data envelopment analysis. Technological and Economic Development of Economy, 22(6), 926–940.
  2. Thomas, H. R., Maloney, W. F., Horner, R. M. W., Smith, G. R., Handa, V. K. & Sanders, S. R. (1990). Modeling construction labor productivity. Journal of Construction Engineering and Management, 116(4), 705–726.
  3. Yi, W. & Chan, A. P. C. ( 2014). Critical review of labor productivity research in construction journals. Journal of Management in Engineering, 30(2), 214–225.
  4. Boughaba, A. & Bouabaz, M. (2020). Identification and risk management related to construction projects. Advances in Computational Design, 5(4), 445–465.
  5. Boulkenafet, N., Boudjellal, K. & Bouabaz, M. (2023). Optimization of productivity in the rehabilitation of building linked to BIM. Advances in Computational Design, 8(2), 179–190.
  6. Olomolaiye, P. O., Jayawardane, A. K. W. & Harris, F. C. (1998). Construction Productivity Management. England: Addison Wesley Longman.
  7. Florez-Perez, L. Song, Z. & Cortissoz, J. C. (2022). Predicting construction productivity with machine learning approaches. Proceedings of the International Symposium on Automation and Robotics in Construction. 2022-July, (107–114).
  8. Jarkas, A. M. & Bitar, C. G. (2012). Factors affecting construction labor productivity in Kuwait. Journal of Construction Engineering and Management. 138(7), 811–820.
  9. Karim, N. A., Hassan, S., Yunus, J. & Hashim, M. (2013). Factors Influence Labour Productivity and the Impacts on Construction Industry. Caspian Journal of Applied Sciences Research, 2(August), 349–354.
  10. El-Gohary, K. M. & Aziz, R. F. (2013). Factors influencing construction labor productivity in Egypt. Journal of Management in Engineering, 30(1), 1–9.
  11. Hickson, B. G. & Ellis, L. A. (2014). Factors affecting Construction Labour Productivity in Trinidad and Tobago. The Journal of the Association of Professional Engineers of Trinidad and Tobago, 42(1), 4–11.
  12. Alaghbari, W., Al-Sakkaf, A. A. & Sultan. B., (2019). Factors affecting construction labour productivity in Yemen. International Journal of Construction Management, 19(1), 79–91.
  13. Shoar, S. & Banaitis, A. (2018). Application of fuzzy fault tree analysis to identify factors influencing construction labor productivity: A high-rise building case study. Journal of Civil Engineering and Management, 25(1), 41–52.
  14. Adebowale, O. & Smallwood, J. (2020). Contractors’ perceptions of factors affecting construction labour productivity in South Africa. Journal of Contemporary Managemen, 17(2), 326–346.
  15. Nasirzadeh, F., Rostamnezhad, M., Carmichael, D. G., Khosravi, A. & Aisbett, B. (2022). Labour productivity in Australian building construction projects: a roadmap for improvement. International Journal of Construction Management, 22(11), 2079–2088.
  16. Roberts, D., Park, K., Ankrah, N. & Kim, K. P. (2023). The effect on cost when utilising modular construction techniques-The impact of weather on labour productivity. International Journal of Sustainable Building Technology and Urban Development, 14(1), 77–95.
  17. Bouabaz, M. & Hamami, M. (2008). A cost estimation model for repair bridges based on artificial neural network. American Journal of Applied Sciences, 5(4), 334–339.
  18. Otmani, A., Bouabaz, M. & Al-Hajj, A. (2020). Predicting Maintenance and Rehabilitation Cost for Buildings Based on Artificial Neural Network and Fuzzy Logic. International Journal of Computational Intelligence and Applications, 19(1), 1–13.
  19. Peško, I. et al. (2017). Estimation of costs and durations of construction of urban roads using ANN and SVM. Complexity. 2450370.
  20. Umit Dikmen, S. & Sonmez, M. (2011). An artificial neural networks model for the estimation of formwork labour. Journal of Civil Engineering and Management, 17(3), 340–347.
  21. Al-Zwainy, F. M. S., Rasheed, H. A. & Ibraheem, H. F. (2012). Development of the construction productivity estimation model using artificial neural network for finishing works for floors with marble. ARPN Journal of Engineering and Applied Sciences, 7(6), 714–722.
  22. Gerek, I. H., Erdis, E., Mistikoglu, G. & Usmen, M. (2015). Modelling masonry crew productivity using two artificial neural network techniques. Journal of Civil Engineering and Management, 21(2), 231–238.
  23. Aswed, G. K. (2016). Productivity Estimation Model for Bracklayer in Construction Projects Using Neural Network. Al-Qadisiyah Journal For Engineering Sciences, 9(2), 183–199.
  24. Golnaraghi, S., Zangenehmadar, Z., Moselhi, O. & Alkass, S. (2019). Application of Artificial Neural Network ( s ) in Predicting Formwork Labour Productivity. Advances in Civil Engineering, 2019, 1–11.
  25. Mlybari, E. A. (2020). Application of soft computing techniques to predict construction labour productivity in Saudi Arabia. International Journal of GEOMATE, 19(71), 203–210.
  26. Bokor, O., Florez-Perez, L., Pesce, G. & Gerami Seresht, N. (2021). Using Artificial Neural Networks to Model Bricklaying Productivity. Proceedings of the 2021 European Conference on Computing in Construction, 2021, July (52–58).
  27. Juszczyk, M. (2020). Analysis of labour efficiency supported by the ensembles of neural networks on the example of steel reinforcement works. Archives of Civil Engineering, 66(1), 97–111.
  28. Sarmento, M., Sc, M., Luiz, M., Ferreira, R. & Sc, D. (2021). Sizing an Artificial Neural Network for Modelling Piping Assembly Labor Productivity Under Different Conditions. International Journal of Engineering Research and Applications, 11(2), 16–22.
  29. Goodarzizad, PP., Mohammadi Golafshani, E. & Arashpour, M. (2021). Predicting the construction labour productivity using artificial neural network and grasshopper optimisation algorithm. International Journal of Construction Management, 1–28.
  30. Lawaju, N., Parajuli, N. & Shrestha, S. K. (2021). Analysis of Labor Productivity of Brick Masonry Work in Building Construction in Kathmandu Valley. Journal of Advanced College of Engineering and Management, 6, 159–175.
  31. Phaobunjong, K. (2002). Parametric Cost Estimating Model for Conceptual Cost Estimating of Building Construction Projects. University of Texas at Austin.
  32. Al-Zwainy, F., Abed - Alla Eiada, A. & Abed - Almajed Khaleel, T. (2016). Application Intelligent Predicting Technologies in Construction Productivity. American Journal of Engineering and Technology Management, 1(3), 39–48.
  33. El-Kholy, A. M. (2010). Productivity performance estimation in Egyptian construction projects based on regression analysis. Mansoura Engineering Journal (MEJ), 35(01), 44–54.
  34. Narayanan, K. M. A. & Aswathi, M. P. (2018). Labour Productivity Model for Structural Elements By Varying Buildability Factors using Multiple Regression Analysis. International Journal of Advance Research, Ideas and Innovations in Technology, 4(2), 139–146.
  35. Khanh, H. D., Kim, S. Y., Van Khoa, N. & Tu, N. T. (2021). The relationship between workers’ experience and productivity: a case study of brick masonry construction. International Journal of Construction Management, 1–10.
  36. Paikun, P., Fatimah, C., Nugroho, N. S. & Kusmana, D. (2021). Labor Productivity Rating Model for Light Brick Wall Installation in Residential Projects. ASTONJADRO, 10(2), 260–270.
  37. Matejević-Nikolić, B. & Živković, L. (2022). Comparative Representation of Two Models for Predicting the Productivity of Column and Wall Concreting Process. Buildings, 12(11), 1809.
  38. Al-Zwainy, F. M. S., Abdulmajeed, M. H. & Aljumaily, H. S. M. (2013). Using Multivariable Linear Regression Technique for Modeling Productivity Construction in Iraq. Open Journal of Civil Engineering, 03(03), 127–135.
  39. Enshassi, A., Mohamed, S., Mustafa, Z. A. & Mayer, P. E. (2007). Factors affecting labour productivity in building projects in the Gaza strip. Journal of Civil Engineering and Management. 13(4), 245–254.
  40. Fagbenle Olabosipo, I., Ogunde Ayodeji, O. & Owolabi James, D. (2011). Factors Affecting the Performance of Labour in Nigerian Construction Sites. Mediterranean Journal of Social Sciences, 2(2), 251–257.
  41. El-Gohary, K. M., Aziz, R. F. & Abdel-Khalek, H. A. (2017). Engineering Approach Using ANN to Improve and Predict Construction Labor Productivity under Different Influences. Journal of Construction Engineering and Management, 143(8), 1–10.
  42. Hafez, S. M. (2014). Critical Factors Affecting Construction Labor Productivity in Egypt. American Journal of Civil Engineering, 2(2), 35.
  43. Kaming, P. F., Olomolaiye, P. O., Holt, G. D. & Harris, F. C. (1997). Factors influencing craftsmen’s productivity in Indonesia. International Journal of Project Management, 15(1), 21–30.
  44. Hogg, R. V. & Tanis, E. a. (2009). Instructor ’ s Solutions Manual Probability and Statistical Inference Eighth Edition. Upper Saddle River, NJ(USA): Prentice Hall.
  45. Sincich, T., Stephan, D. & Levine, D. M. (2002). Practical statistics by example using Microsoft Excel and Minitab. Prentice Hall Professional Technical Reference.
  46. Gopal, T. G. S. R. & Murali, K. (2015). A Critical Review on Factors Influencing Labour Productivity in Construction. Journal of Mechanical and Civil Engineering (IOSR-JMCE), 12(5), 47–51.
  47. Heravi, G. & Eslamdoost, E. (2015). Applying Artificial Neural Networks for Measuring and Predicting Construction-Labor Productivity. American Society of Civil Engineers, 141(10), 04015032.
  48. Duch, W. & Jankowski, N. (1999). Survey of neural transfer functions,” Neural Computing Surveys, 2, 163–212.
  49. Nassar, Y. S. & Khaleel, T. A. (2019). Building Model to Predict Labour Productivity Using Multiple Linear Regression Technique for “ Formwork Concrete Columns “. Kufa Journal of Engineering, 10(2), 12–26.
DOI: https://doi.org/10.2478/sspjce-2023-0005 | Journal eISSN: 1338-7278 | Journal ISSN: 1336-9024
Language: English
Published on: Dec 29, 2023
Published by: Sciendo
In partnership with: Paradigm Publishing Services
Publication frequency: 2 times per year

© 2023 Chemseddine Dehchar, Khaled Boudjellal, Mohamed Bouabaz, published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.