Have a personal or library account? Click to login
Applicability of Bromilow´s Time-cost Model for Residential Projects in Slovakia Cover

Applicability of Bromilow´s Time-cost Model for Residential Projects in Slovakia

Open Access
|Dec 2014

Abstract

The concept of construction time has been mentioned by most researchers as one of the key factors of a successful project. Time-cost model for rapid estimation of construction time appeared in the world some fifty years ago and the most mentioned is model developed by Bromilow. The purpose of submitted research is to validate Bromilow´s time-cost (BTC) model and identify constants in BTC model in context with residential construction projects in Slovak construction conditions. The data for the study were obtained from 28 residential projects completed within the period 2010-2013 in regions of Slovakia. The data were analyzed using classical correlation and regression analysis

DOI: https://doi.org/10.2478/sspjce-2014-0011 | Journal eISSN: 1338-7278 | Journal ISSN: 1336-9024
Language: English
Page range: 5 - 12
Published on: Dec 11, 2014
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year

© 2014 Daniela Mačková, Renáta Bašková, published by Technical University of Košice
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.