[1] Arbós, L. C. (2002). Design of a rapid response and high efficiency service by lean production principles: Methodology and evaluation of variability of performance. International journal ofproduction economics. Vol. 80, 169 - 183.
[2] Haas, C. T., O´Connor, J. T., Tucker, R. L., Eickmann, J. A., Fagerlund, W. R. (2000). Prefabrication and preassembly trends and effects on the construction workforce, USA: University of Texas at Austin.
[5] Sullivan, W. G., McDonald, T. N., Van Aken, E. M. (2002). Equipment replacement decisions and lean manufacturing. Robotics and computer integrated manufacturing. Vol. 18, 255 - 265.
[11] Gann, D. M. (1996). Construction as a manufacturing process? Similarities and differences between industrialized housing and car production in Japan. Construction management andEconomics. Vol. 14, 437 - 450.
[12] Spišáková, M. Kozlovská, M. (2011). Reducing of construction waste through new technologies. In Organization, Technology and Management in Construction : 10th international conference, 7 - 10 September 2011(pp. 1 - 14), Šibenik: University of Zagreb, FCE.
[14] IBS Modular (29. 3. 2008). Toyota Homes - Live in your next Toyota - http://ibsmodular.blogspot.com/2008/03/toyota-homes-live-in-your-next-toyota.html.
[17] Struková, Z. (2011). Lean production principles in construction projects design and delivery. In Geodesy, architecture and construction 2011: proceedings of the 4th international conference of young scientists, 24. - 26. 11. 2011 (72 -73), Lviv: Publishing House of Lviv Polytechnic.