Have a personal or library account? Click to login
Risk Assessment Model Based on Fuzzy Logic for Residential Buildings Cover

Risk Assessment Model Based on Fuzzy Logic for Residential Buildings

By: Namdeo Hedaoo and  Amey Pawar  
Open Access
|Dec 2021

References

  1. Abd El Khalek, - Hamada M. Kamel (2016)Risk and uncertainty assessment model in construction projects using fuzzy logic.” American Journal of Civil Engineering, pp. 24-39.10.11648/j.ajce.20160401.13
  2. Al-Bahar, Jamal F., - Keith C. Crandall (1990)Systematic risk management approach for construction projects.” Journal of Construction Engineering and Management, pp. 533-546.10.1061/(ASCE)0733-9364(1990)116:3(533)
  3. Ayyub, Bilal M., - Achintya Haldar (1984)Project scheduling using fuzzy set concepts.” Journal of Construction Engineering and Management, pp. 189-204.10.1061/(ASCE)0733-9364(1984)110:2(189)
  4. Banaitiene, Nerija, - Audrius Banaitis (2012)Risk management in construction projects.” Risk Management–Current Issues and Challenges. In N. Banaitiene (Ed.), Risk Management–Current Issues and Challenges, pp. 429-448.10.5772/51460
  5. Bannerman, Paul L. (2008)Risk and risk management in software projects: A reassessment.” Journal of Systems and Software, pp. 2118-2133.10.1016/j.jss.2008.03.059
  6. Bennett, Joanna C., et al. (1996)Risk analysis techniques and their application to software development.” European Journal of Operational Research, pp. 467-475.10.1016/S0377-2217(96)00171-3
  7. Bojadziev, George, - Maria Bojadziev (2007) Fuzzy logic for business, finance, and management. Vol. 23. World Scientific, pp. 252.10.1142/6451
  8. BS ISO 31000 (2018) “Risk management – Guidelines”. The British Standards Institute.
  9. Bu-Qammaz, - M. Talat Birgonul (2009)Risk assessment of international construction projects using the analytic network process.” Canadian Journal of Civil Engineering, pp. 1170-1181.10.1139/L09-061
  10. Cho, Yoon-Bae Kim (2002) “A risk assessment methodology for incorporating uncertainties using fuzzy concepts.” Reliability Engineering & System Safety, pp. 173-183.10.1016/S0951-8320(02)00158-8
  11. El-Sayegh, Sameh Monir (2008)Risk assessment and allocation in the UAE construction industry.” International journal of project management, pp. 431-438.10.1016/j.ijproman.2007.07.004
  12. Fuzzy Logic ToolboxTM (2015) 2 user’s guides, MATLAB. The Math Works, Inc., Natick.
  13. Gunduz, - Mustafa Ozdemir (2015)Fuzzy assessment model to estimate the probability of delay in Turkish construction projects.” Journal of Management in Engineering, pp. 01-32.10.1061/(ASCE)ME.1943-5479.0000261
  14. Hubbard, Douglas W. (2020) The failure of risk management: Why it’s broken and how to fix it. John Wiley & Sons.10.1002/9781119521914
  15. Kangari, - Leland S. Riggs (1989)Construction risk assessment by linguistics.” IEEE transactions on engineering management, pp. 126-131.10.1109/17.18829
  16. Karimi Azari – Amir Reza, et al. (2011)Risk assessment model selection in construction industry.” Expert Systems with Applications, pp. 9105-9111.
  17. Koehn, E. (1984)Fuzzy sets in construction engineering.” Proc. CIB W-65.
  18. Krane, Nils OE Olsson (2010)Categorising risks in seven large projects—Which risks do the projects focus on?” Project management journal, pp. 81-86.10.1002/pmj.20154
  19. Mamdani - Sedrak Assilian (1975)An experiment in linguistic synthesis with a fuzzy logic controller.” International journal of man-machine studies, pp. 1-13.
  20. Manoliadis, Odysseas (2018)The assessment of construction project risks with the use of fuzzy Delphi methodology—case study photovoltaic project in Greece.” International Journal of Management and Fuzzy Systems, pp. 7-14.10.11648/j.ijmfs.20180401.12
  21. Nicholas, John M., - Herman Steyn (2008) Project management for business, engineering, and technology: principles and practice. Elsevier.
  22. Nieto-Morote, - Francisco Ruz-Vila (2011) “A fuzzy approach to construction project risk assessment.” International Journal of Project Management, pp. 220-231.10.1016/j.ijproman.2010.02.002
  23. PMI A guide to the project management body of knowledge (2004) PMBOK Guide, 3rd edn. Project Management Institute Inc., Newtown Square.
  24. Rainer Jr, - Houston H. Carr (1991)Risk analysis for information technology.” Journal of Management information systems, pp. 129-147.
  25. Shang, Huiping, et al. (2005) “An intelligent risk assessment system for distributed construction teams.” Engineering, Construction and Architectural Management Vol. 12 Issue 4, pp. 391 - 409.10.1108/09699980510608839
  26. Subramanyan, - Vandana Bhatt (2012)Construction project risk assessment: development of model based on investigation of opinion of construction project experts from India.” Journal of construction engineering and management, pp. 409-421.10.1061/(ASCE)CO.1943-7862.0000435
  27. Tah, Joseph HM, - V. Carr (2000) “A proposal for construction project risk assessment using fuzzy logic.” Construction Management & Economics, pp. 491-500.10.1080/01446190050024905
  28. Tah, Joseph HM, - V. Carr (2001)Knowledge-based approach to construction project risk management.” Journal of computing in civil engineering, pp. 170-177.10.1061/(ASCE)0887-3801(2001)15:3(170)
  29. V. T. Covello, - J. Mumpower (1986) Risk Evaluation and Management. New York: Plenum.10.1007/978-1-4613-2103-3
  30. White, Diana (1995)Application of systems thinking to risk management.” Management Decision Vol. 33 No. 10, pp. 35-45.10.1108/EUM0000000003918
  31. Yeung, - Daniel WM Chan (2012)Fuzzy set theory approach for measuring the performance of relationship-based construction projects in Australia.” Journal of management in engineering, pp. 181-192.10.1061/(ASCE)ME.1943-5479.0000083
  32. Yong, - Nur Emma Mustaffa (2012)Analysis of factors critical to construction project success in Malaysia.” Engineering, construction and architectural management.
  33. Zadeh, L.A. (1965) Fuzzy sets. Inf. Control 8(3), pp. 338–353.10.1016/S0019-9958(65)90241-X
  34. Zadeh, L.A. (2007)Application of a fuzzy based decision-making methodology to construction project risk assessment.” International journal of project management, pp. 589-600.
DOI: https://doi.org/10.2478/sjce-2021-0026 | Journal eISSN: 1338-3973 | Journal ISSN: 1210-3896
Language: English
Page range: 37 - 48
Published on: Dec 30, 2021
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2021 Namdeo Hedaoo, Amey Pawar, published by Slovak University of Technology in Bratislava
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.