Have a personal or library account? Click to login
THE USAGE OF POSITAL CANOPEN AGS15 INCLINOMETERS FOR DIAGNOSTIC MONITORING OF SLENDER STRUCTURES Cover

THE USAGE OF POSITAL CANOPEN AGS15 INCLINOMETERS FOR DIAGNOSTIC MONITORING OF SLENDER STRUCTURES

Open Access
|Dec 2013

References

  1. Álvarez-Vigil, A.E., González-Nicieza, C., López Gayarre, F. & Álvarez-Fernández, M.I. (2010). Forensic analysis of the evolution of damages to buildings constructed in a mining area. Engineering Failure Analysis 17(4), June 2010, pp. 938-960.10.1016/j.engfailanal.2009.11.005
  2. Arnoso, J., Montesinos, F. G., Benavent, M. & Vélez, E. J. (2012). The 2011 volcanic crisis at El Hierro (Canary Islands): monitoring ground deformation through tiltmeter and gravimetric observations. EGU General Assembly 2012, held 22-27 April, 2012 in Vienna, Austria., p. 5373.
  3. Burdet, O.L. & Zanella, J.-L., (2000). Automatic monitoring of bridges using electronic inclinometers. 16th Congress of IABSE, Lucerne, 2000.10.2749/222137900796314284
  4. Burdet, O.L. & Zanella, J.-L., (2002). Automatic monitoring of the Riddes bridges using electronic inclinometers. First International Conference on BridgeMaintenance, Safety and Management IABMAS, Barcelona, 2002.
  5. Hou, X., Yang, X. & Huang, Q. (2005). Using Inclinometers to Measure Bridge Deflection. J. Bridge Eng., 10(5), pp. 564-569.10.1061/(ASCE)1084-0702(2005)10:5(564)
  6. Milev, A., Share, P., Durrheim, R., Naoi, M., Nakatani, M., Yabe, Y. & Ogasawara, H., (2013). Joint interpretation of high-precision tilt data and mining induced seismic events recorded underground in deep level gold mine in South Africa. EGUGeneral Assembly 2013, held 7-12 April, 2013 in Vienna, Austria, p. 663.
  7. Rohrmann, R. G., Thöns, S. & Rücker, W., (2010). Integrated monitoring of offshore wind turbines - requirements, concepts and experiences. Structure andInfrastructure Engineering, 6(5), pp. 575-591.10.1080/15732470903068706
  8. Sherman, C. S., Magliocco, M. & Glaser, S. D., (2011). Developing a Rock Mass Tilt And Seismic Observatory at DUSEL. 45th U.S. Rock Mechanics / GeomechanicsSymposium, June 26-29, 2011, San Francisco, California.
  9. So-Keul, Ch., Dong-Woo, R., Won-Il, J. & Hyung-Sik Y., (2010). Characterization of Complete Radial Displacement of Tunnel Using a Horizontal Inclinometer. Geosystem Engineering, 13(2), pp. 77-82.
  10. Wyczałek, I., Wyczałek, M. & Nowak R., (2013). Badania porównawcze i integracja pomiarów pochyleń z pomiarami tachimetrycznymi. Archiwum Instytutu InżynieriiLądowej, 15, pp. 157-168.
  11. Yun Wu & Yijin Wu, (2013). Study on Automatic Safety Monitoring and Management System of Tailings Reservoir. Advanced Materials Research, 663, pp. 1043-1048. 10.4028/www.scientific.net/AMR.663.1043
DOI: https://doi.org/10.2478/rgg-2013-0009 | Journal eISSN: 2391-8152 | Journal ISSN: 0867-3179
Language: English
Page range: 11 - 22
Published on: Dec 31, 2013
Published by: Warsaw University of Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year

© 2013 Ireneusz Wyczałek, Artur Plichta, Michał Wyczałek, published by Warsaw University of Technology
This work is licensed under the Creative Commons License.