References
- A. Ghosh, D. J. Edwards, and M. R. Hosseini, “Patterns and trends in Internet of Things (IoT) research: future applications in the construction industry,” Engineering, Construction and Architectural Management, vol. 28, no. 2. 2021. doi: 10.1108/ECAM-04-2020-0271.
- R. Iwańkowicz, “A Multi-Case-Based Assembly Management Method for the Shipbuilding Industry,” Polish Maritime Research, vol. 28, no. 2. 2021. doi: 10.2478/ pomr-2021-0018.
- V. Koscheyev, V. Rapgof, and V. Vinogradova, “Digital transformation of construction organizations,” in IOP Conference Series: Materials Science and Engineering, 2019. doi: 10.1088/1757-899X/497/1/012010.
- J. Berlak, S. Hafner, and V. G. Kuppelwieser, “Digitalization’s impacts on productivity: a model-based approach and evaluation in Germany’s building construction industry,” Production Planning and Control, vol. 32, no. 4, 2021, doi: 10.1080/09537287.2020.1740815.
- Q. K. Jahanger, J. Louis, C. Pestana, and D. Trejo, “Potential positive impacts of digitalization of construction-phase information management for project owners,” Journal of Information Technology in Construction, vol. 26, 2021, doi: 10.36680/j.itcon.2021.001.
- B. R. K. Mantha and B. García de Soto, “Assessment of the cybersecurity vulnerability of construction networks,” Engineering, Construction and Architectural Management, vol. 28, no. 10, 2021, doi: 10.1108/ECAM-06-2020-0400.
- S. Demirkesen and A. Tezel, “Investigating major challenges for industry 4.0 adoption among construction companies,” Engineering, Construction and Architectural Management, vol. 29, no. 3, 2022, doi: 10.1108/ECAM-12-2020-1059.
- Jan Koeleman, Maria João Ribeirinho, David Rockhill, Erik Sjödin, and Gernot Strube, “Decoding digital transformation in construction,” McKinsey & Company, no. August, 2019.
- Z. Wang and J. Liu, “A Seven-Dimensional Building Information Model for the Improvement of Construction Efficiency,” Advances in Civil Engineering, vol. 2020, 2020, doi: 10.1155/2020/8842475.
- S. Parusheva, “Digitalization and Digital Transformation in Construction – Benefits and Challenges,” Proceedings of the International Conference dedicated to the 50th anniversary of the Department of Informatics, University of Economics, Varna, 2019.
- L. Zheng, W. Lu, K. Chen, K. W. Chau, and Y. Niu, “Benefit sharing for BIM implementation: Tackling the moral hazard dilemma in inter-firm cooperation,” International Journal of Project Management, vol. 35, no. 3, 2017, doi: 10.1016/j.ijproman.2017.01.006.
- M. Rauf, Z. Guan, L. Yue, Z. Guo, J. Mumtaz, and S. Ullah, “Integrated Planning and Scheduling of Multiple Manufacturing Projects under Resource Constraints Using Raccoon Family Optimization Algorithm,” IEEE Access, vol. 8, pp. 151279–151295, 2020, doi: 10.1109/ ACCESS.2020.2971650.
- R. Moser, G. Narayanamurthy, K. Kusaba, and G. Kaiser, “Performance of low-cost country sourcing projects – Conceptual model & empirical analysis,” Int J Prod Econ, vol. 204, pp. 30–43, Oct. 2018, doi: 10.1016/j.ijpe.2018.07.011.
- H. Abbasianjahromi and S. Hosseini, “A risk-cost optimization model for selecting human resources in construction projects,” SN Appl Sci, vol. 1, no. 11, 2019, doi: 10.1007/s42452-019-1570-5.
- B. Ashuri and M. Tavakolan, “Shuffled Frog-Leaping Model for Solving Time-Cost-Resource Optimization Problems in Construction Project Planning,” Journal of Computing in Civil Engineering, vol. 29, no. 1, Jan. 2015, doi: 10.1061/ (asce)cp.1943-5487.0000315.
- E. Acar, G. Bayrak, Y. Jung, I. Lee, P. Ramu, and S. S. Ravichandran, “Modeling, analysis, and optimization under uncertainties: a review,” Structural and Multidisciplinary Optimization, vol. 64, no. 5. 2021. doi: 10.1007/s00158-021-03026-7.
- S. Saeed, M. A. Khan, and R. Ahmad, Business strategies and approaches for effective engineering management. 2013. doi: 10.4018/978-1-4666-3658-3.
- M. Fusko, Ľ. Dulina, P. Bubeník, M. Bučková, M. Kasajová, and R. Svitek, “THE IMPORTANCE OF DIGITIZATION AND INNOVATIONS FOR SMALL AND MEDIUMSIZED ENTERPRISES,” Proceedings of CBU in Economics and Business, vol. 2, 2021, doi: 10.12955/peb.v2.252.
- M. Winfield, “Construction 4.0 and ISO 19650: A panacea for the digital revolution?,” Proceedings of Institution of Civil Engineers: Management, Procurement and Law, vol. 173, no. 4, 2020, doi: 10.1680/jmapl.19.00051.
- M. Eigner, “Engineering 4.0—Foundations of the Digitalization of Engineering,” in System Lifecycle Management, 2021. doi: 10.1007/978-3-658-33874-9_3.
- M. Müller and L. Jedličková, “Several Notes on the Existential Hermeneutic Phenomenology for Project Management and Possibilities of Its Extension by Other Existential Concepts: Case Study From the Research Project Team,” Project Management Journal, vol. 51, no. 4, pp. 452–463, Aug. 2020, doi: 10.1177/8756972820910280.
- W. Litwin, D. Piątek, W. Leśniewski, and K. Marszałkowski, “50’ Sail Catamaran with Hybrid Propulsion, Design, Theoretical and Experimental Studies,” Polish Maritime Research, vol. 29, no. 2, 2022, doi: 10.2478/pomr-2022-0012.
- B. Branowski, M. Zabłocki, P. Kurczewski, and A. Walczak, “Selected Issues in Universal Design of Yachts for People with Disabilities,” Polish Maritime Research, vol. 28, no. 3, 2021, doi: 10.2478/pomr-2021-0030.
- L. Venz, A. Pundt, and S. Sonnentag, “What matters for work engagement? A diary study on resources and the benefits of selective optimization with compensation for state work engagement,” J Organ Behav, vol. 39, no. 1, 2018, doi: 10.1002/job.2207.
- J. Bin Yang and H. Y. Chou, “Subjective benefit evaluation model for immature BIM-enabled stakeholders,” Autom Constr, vol. 106, 2019, doi: 10.1016/j.autcon.2019.102908.
- L. Rihar, T. Žužek, and J. Kušar, “How to successfully introduce concurrent engineering into new product development?,” Concurr Eng Res Appl, vol. 29, no. 2, pp. 87–101, Jun. 2021, doi: 10.1177/1063293X20967929.
- N. Bibi, Z. Anwar, and A. Ahsan, “Comparison of search-based software engineering algorithms for resource allocation optimization,” Journal of Intelligent Systems, vol. 2015, pp. 629–642, 2015, doi: 10.1515/jisys-2015-0016.
- L. K. Hansen and P. Svejvig, “Seven Decades of Project Portfolio Management Research (1950–2019) and Perspectives for the Future,” Project Management Journal, vol. 53, no. 3, pp. 277–294, 2022, doi: 10.1177/87569728221089537.
- A. Karczewski and J. Kozak, “A Generative Approach to Hull Design for a Small Watercraft,” Polish Maritime Research, vol. 30, no. 1, pp. 4–12, 2023, doi: 10.2478/ pomr-2023-0001.
- P. F. Drucker, E. Dyson, C. Handy, P. Saffo, and P. M. Senge, “Looking ahead: implications of the present.,” in Harvard business review, 1997.
- M. Pawłusik, R. Szłapczyński, and A. Karczewski, “Optimising Rig Design for Sailing Yachts with Evolutionary Multi-Objective Algorithm,” Polish Maritime Research, vol. 27, no. 4, 2020, doi: 10.2478/pomr-2020-0064.
- R. Hollister and M. D. Watkins, “Too many projects,” Harvard Business Review, vol. 2018, no. September-October. 2018.
- M. Deja, M. Dobrzyński, and M. Rymkiewicz, “Application of Reverse Engineering Technology in Part Design for Shipbuilding Industry,” Polish Maritime Research, vol. 26, no. 2, 2019, doi: 10.2478/pomr-2019-0032.