Have a personal or library account? Click to login
Impact of Engineering Change Request in Production System in the Pandemic Period Cover

Impact of Engineering Change Request in Production System in the Pandemic Period

Open Access
|Aug 2022

References

  1. Bhatti M. Ishaq, H. M. Awan, Z. Razaq (214). The key performance indicators (KPIs) and their impact on overall organizational performance. CBE, King Abdulaziz University, Jeddah, Saudi Arabia.
  2. Brandimarte P., A. Sharifnia, B.F. Von Turkovich,,, Continuous Flow Models of Manufacturing Systems: a Review’’, CIRP Annals - Manufacturing technology,Volume 45, 1996;10.1016/S0007-8506(07)63098-4
  3. Brundtland, (1987). United Nations World Commission. Development and Environment: Our common Future. s.l. Oxford University Press.
  4. Cross N (1989). Engineering design methods. Wiley, Chichester
  5. Deac Ion (2000). Programarea producţiei în condiţiile implementării sistemelor flexibile de fabricaţie, Sesiunea de comunicări ştiinţifice a cadrelor didactice, AISTEDA, Capitolul I: Sisteme moderne de fabricaţie. Sisteme de producţie;
  6. Eckert CM, Clarkson PJ, Zanker W (2004). Change and customization in complex engineering domains. Res Eng Des 15(1): 1-2110.1007/s00163-003-0031-7
  7. Fleischer, J., Otter, M. & Beuke, F. (2014). Method to compensate production related deviations for the assembly of space-frame-structures. German Academic Society for Production Engineering, Volume 8, pp. 207-21610.1007/s11740-013-0501-3
  8. Gottschalk Max and Sven Patrick Gerlich (2019). Control and Reduction of Deviations in Production Processes. School of Engineering in Jönköping in the subject area Production Systems
  9. Jarratt T. A. W., Eckert C. M., N. H. M. Caldwell, P. J. Clarkson (2011). Engineering change: an overview and perspective on the literature. Res Eng. Design 22: 103-12410.1007/s00163-010-0097-y
  10. Meier Horst, Henning Lagemann*, Friedrich Morlock, Christian Rathmann (2013). Key performance indicators for assessing the planning and delivery of industrial services. Ruhr- Universität Bochum, Universitätsstraße 150, 44801 Bochum, Germany10.1016/j.procir.2013.07.056
  11. Nichols K (1990). Getting engineering changes under control. J Eng Des 1(1): 5-1510.1080/09544829008901639
  12. Periodic Strain, The International Journal of Advanced Manufacturing Technology, London, Springer, 1997;
  13. Schweinoch, M. et al. (2016). A non-rigid registration method for the efficient analysis of shape deviations in production engineering applications. German Academic Society for Production Engineering, Volume 10, pp. 137-146.10.1007/s11740-016-0660-0
  14. Seppänen Olli (2004). Empirical Research on Deviations in Production and Current State of Project Control. Aalto University
  15. Terwiesch C, Loch CH (1999). Managing the process of engineering change orders: the case of the climate control system in automobile development. J Prod Innov Manag 16(2): 160-17210.1111/1540-5885.1620160
  16. Vainio Ville, Lauri Jokinen and Antti Pulkkinen (2016). Quality Elements of Engineering Change Requests and Their Effect on Request Processing and Content Comprehension. Conference on Flexible Automation and Intelligent Manufacturing.
  17. Wilberga Julian, Fatos Elezia, Iris D. Tommeleinb, Udo Lindemannann (2015). Using a Systemic Perspective to Support Engineering Change Management. Conference Organized by Missouri University of Science and Technology2015-San Jose, CA
  18. Wright IC (1997). A review of research into engineering change management: implications for product design. Des Stud 18: 33-4210.1016/S0142-694X(96)00029-4
Language: English
Page range: 629 - 638
Published on: Aug 8, 2022
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2022 Oana Bianca Pop, Dorel Cristian Uifalean, published by Bucharest University of Economic Studies
This work is licensed under the Creative Commons Attribution 4.0 License.