Adrian, C., Abdullah, R., Atan, R., & Jusoh, Y. Y. (2017). Factors influencing to the implementation success of big data analytics: A systematic literature review. International Conference on Research and Innovation in Information Systems, ICRIIS, 17(IEEE), 978-1. doi: 10.1109/ICRIIS.2017.8002536
Agyapong, A., Amanor, K., & Poku, K. (2016). Antecedents to the implementation of hybrid strategy in a dynamic business environment – An econometric analysis of business decisions in Ghana, Journal of Developmental Entrepreneurship, 21 (4), pp. 1-24. doi: 10.1142/S1084946716500254
Agyapong, A., Zamore, S., & Mensah, H. K. (2020). Strategy and performance: Does environmental dynamism matter? Journal of African Business, 21(3), pp. 315-337. doi: 10.1080/15228916.2019.1641304
Akter, S., Wamba, S. F., Gunasekaran, A., Dubey, R., & Childe, S. J. (2016). How to improve firm performance using big data analytics capability and business strategy alignment? International Journal of Production Economics, 182, pp. 113-131. doi: 10.1016/j.ijpe.2016.08.018
Alkhafaji, A. F. (2011). Strategic management: Formulation, implementation, and control in a dynamic environment. Development and Learning in Organizations: An International Journal, 25(2). doi: 10.1108/dlo.2011.08125bae.001
Allas, T., Erichazan, S., Ramaswamy, & Chui, M. (2017). Artificial intelligence the next digital frontier? In McKinsey Global Institute: McKinsey Global Institute. www.mckinsey.com/mgi.
Amiri, O., Rahimi, M., Ayazi, A., & Khazaeni, G. (2021). Multi-criteria decision-making model for EPC contractor prequalification: A hybrid approach. International Journal of Building Pathology and Adaptation, 1. doi: 10.1108/IJBPA-06-2021-0082
Anderson, R. E., Black, W. C., Babin, B. J., & Hair, J. F. (2019). Multivariate Data Analysis. In CENCAGE (8th ed., Vol. 87, Issue 4). Annabel Ainscow.
Ateş, N. Y., Tarakci, M., Porck, J. P., van Knippenberg, D., & Groenen, P. J. F. (2020). The dark side of visionary leadership in strategy implementation: Strategic alignment, strategic consensus, and commitment. Journal of Management, 46(5), pp. 637-665. doi: 10.1177/0149206318811567
Awan, U., Shamim, S., Khan, Z., Zia, N. U., Shariq, S. M., & Khan, M. N. (2021). Big data analytics capability and decision-making: The role of data-driven insight on circular economy performance. Technological Forecasting and Social Change, 168 (March), p. 120766. doi: 10.1016/j.techfore.2021.120766
Aydiner, A. S., Tatoglu, E., Bayraktar, E., & Zaim, S. (2019). Information system capabilities and firm performance: Opening the black box through decision-making performance and business-process performance. International Journal of Information Management, 47(July 2018), pp. 168-182. doi: 10.1016/j.ijinfomgt.2018.12.015
Bagus, A. L. (2018). Masa depan industri EPC dan tantangan BUMN EPC Tahun 2017. Fakultas Ekonomi Dan Bisnis Universitas Indonesia, 2017, 6. www.lmfebui.com.
Balogun, J., & Johnson, G. (2005). From intended strategies to unintended outcomes: The impact of change recipient sensemaking. Organization Studies, 26(11), pp. 1573-1601. doi: 10.1177/0170840605054624
Barney, J. B. (1986). Organizational culture: Can it be a source of sustained competitive advantage? Academy of Management Review, 11(3), pp. 656-665. doi: 10.5465/amr.1986.4306261
Barney, J., Ketchen, D., & Wright, M. (2011). The future of resource-based theory: Revitalization or decline? Journal of Management, 37(5), pp. 1299-1315. doi: 10.1177/0149206310391805
Bharadwaj, S., Adidam, P., Edison, S., & Menon, A. (1999). Antecedents and consequences of marketing strategy making: A model and a test. Journal of Marketing, 63(April), pp. 18-40. doi: 10.1177/002224299906300202
Bonett, D. G., & Wright, T. A. (2015). Cronbach’s alpha reliability: Interval estimation, hypothesis testing, and sample size planning. Journal of Organizational Behavior, 36(1), pp. 3-15. doi: 10.1002/job.1960
Bourgeois, L. J. & Eisenhardt, K. M. (1988). Strategic decision processes in high velocity environments: Four cases in the microcomputer industry. Management Science, 34 (7), pp. 816-835. doi: 10.1287/mnsc.34.7.816
Bryson, J. M., & Roering, W. D. (1988). Initiation of strategic planning by governments. Public Administration Review, 48 (6), p. 995. doi: 10.2307/976996
Byrne, B. M. (2016). Structural Equation Modeling with Amos: Basic Concepts, Applications and Programming. In Lisa Harlow (Ed.), Structural Equation Modeling with AMOS. Routledge Taylor & Francis Group.
Cândido, C. J. F., Santos, S. P., Cânddo, C., & Santos, S. P. (2015). Strategy implementation: What is the failure rate? Journal of Management and Organization, 21 (2), pp. 237-262. doi: 10.1017/jmo.2014.77
Cavusgil, S. T., Zou, S., Tamer, C. S., & Zou, S. (1994). Marketing strategy-performance relationship: An investigation of the empirical link in export market ventures. Journal of Marketing, 58 (1), p. 1. doi: 10.2307/1252247
Cepeda-Carrion, G., Cegarra-Navarro, J. G., & Jimenez-Jimenez, D. (2012). The effect of absorptive capacity on innovativeness: Context and information systems capability as catalysts. British Journal of Management, 23(1), pp. 110-129. doi: 10.1111/j.1467- 8551.2010.00725.x
Chang, B. R., Tsai, H. F., Tsai, Y. C., Kuo, C. F., & Chen, C. C. (2016). Integration and optimization of multiple big data processing platforms. Engineering Computations (Swansea, Wales), 33(6), pp. 1680-1704. doi: 10.1108/EC-08-2015-0247
Chan, C. M., Isobe, T., & Makino, S. (2008). Which country matters? Institutional development and foreign affiliate performance. Strategic Management Journal, 29(11), pp. 1179-1205. doi: 10.1002/smj.705
Child, J., & Hsieh, L. H. Y. (2014). Decision mode, information and network attachment in the internationalization of SMEs: A configurational and contingency analysis. Journal of World Business, 49(4), pp. 598-610. doi: 10.1016/j.jwb.2013.12.012
Chin, W. W. (1998). The partial least squares approach to structural equation modelling. In: Marcoulides, G. A. (ed.), Modern Methods for Business Research. Lawrence Erlbaum Associates, Mahwah, NJ, pp. 295-336.
Chin, W. W., & Marcoulides, G. (1998). Issues and Opinion on Structural Equation Modeling. MIS Quarterly, 22(1), vii–xvi. http://www.jstor.org/stable/249674.
Choi, S. J., So, W. C., Jong, H. K., & Lee, E. B. (2021). AI and text-mining applications for analyzing contractor’s risk in invitation to bid (ITB) and contracts for engineering procurement and construction (EPC) projects. Energies, 14 (15), p. 4632. doi: 10.3390/en14154632
Cohen, W. M., & Levin, R. C. (1989). Empirical studies of innovation and market structure. Handbook of Industrial Organization, 2, pp. 1059-1107. doi: 10.1016/S1573-448X(89)02006-6
Collis, D. J. (1994). Research note: How valuable are organizational capabilities? Strategic Management Journal, 15(Special Issue), pp. 143-152. doi: 10.1002/smj.4250150910
Conant, J., Mokwa, M., & Varadarajan, R. (1990). Strategic types, distinctive marketing competencies and organizational performance: A multiple measures based study. Strategic Management Journal, 11 (9), pp. 365-383. doi: 10.1002/smj.4250110504
Coricelli, G., Diecidue, E., & Zaffuto, F. D. (2018). Evidence for multiple strategies in choice under risk. Journal of Risk and Uncertainty, 56(2), pp. 193-210. doi: 10.1007/s11166-018- 9278-2
Davenport, T. H., Fa, L. L., Barth, P., & Bean, R. (2012). How ‘Big Data’ Is different. MIT Sloan Management Review, 54(1), 43–46. http://ez.sun.ac.za/login?url=https://search-proquest-com. ez.sun.ac.za/docview/1124397830?accountid=14049
Dean, J. W., & Sharfman, M. P. (1993a). Procedural rationality in the strategic decision-making process. Journal of Management Studies, 30(4), pp. 587-610. doi: 10.1111/j.1467-6486.1993.tb00317.x
Dean, J. W., & Sharfman, M. P. (1993b). The relationship between procedural rationality and political behavior in strategic decision making. Decision Sciences, 24(6), pp. 1069-1083. doi: 10.1111/j.1540-5915.1993.tb00504.x
Ding, J., Chen, C., An, X., Wang, N., Zhai, W., & Jin, C. (2018). Study on added-value sharing ratio of large EPC hydropower project based on target cost contract: A perspective from China. Sustainability (Switzerland), 10(10), p. 3362. doi: 10.3390/su10103362
Dooley, R. S., & Fryxell, G. E. (1999). Attaining decision quality and commitment from dissent: The moderating effects of loyalty and competence in strategic decision-making team. Academy of Management Journal, 42(4), pp. 389-402. doi: 10.2307/257010
Doz, Y. (2017). The evolution of cooperation in strategic alliances: Initial conditions or learning processes? Strategic Management Journal, 17 (Evolutionary Perspectives), pp. 55-83. doi: 10.1002/smj.4250171006
Dunovic, I. B., Prebanic, K. R., & Durrigl, P. (2021). Method for base estimation of construction time for linear projects in front-end project phases. Organization, Technology and Management in Construction, 13(1), pp. 2312-2326. doi: 10.2478/otmcj-2018- 0026
Edwards, J. S., Duan, Y., & Robins, P. C. (2000). An analysis of expert systems for business decision making at different levels and in different roles. European Journal of Information Systems, 9(1), pp. 36-46. doi: 10.1057/palgrave. ejis.3000344
Eisenhardt, K. M., & Martin, J. A. (2000). Dynamic capabilities: What are they? Strategic Management Journal, 21 (10–11), pp. 1105-1121. doi: 10.1002/1097-0266(200010/11)21:10/11<;1105::AID-SM-J133>3.0.CO;2-E
Elawi, G. S. A., Algahtany, M., & Kashiwagi, D. (2016). Owners’ perspective of factors contributing to project delay: Case studies of road and bridge projects in Saudi Arabia. Procedia Engineering, 145(480), pp. 1402-1409. doi: 10.1016/j. proeng.2016.04.176
Elbanna, S., & Child, J. (2007). The influence of decision, environmental and firm characteristics on the rationality of strategic decision-making. Journal of Management Studies, 44(4), pp. 561-591. doi: 10.1111/j.1467-6486.2006.00670.x
Elbanna, S., & Naguib, R. (2009). How much does performance matter in strategic decision making? International Journal of Productivity and Performance Management, 58(5), pp. 437-459. doi: 10.1108/17410400910965715
Eling, K., Griffin, A., & Langerak, F. (2014). Using intuition in fuzzy front-end decision-making: A conceptual framework. Journal of Product Innovation Management, 31 (5), pp. 956-972. doi: 10.1111/jpim.12136
Engert, S., & Baumgartner, R. J. (2016). Corporate sustainability strategy – Bridging the gap between formulation and implementation. Journal of Cleaner Production, 113, pp. 822-834. doi: 10.1016/j.jclepro.2015.11.094
Eng, J., Khan, Z., Zia, N. U., Shamim, S., Zeng, J., Khan, Z., et al. (2020). Big data analytics capability and decision making performance in emerging market firms: The role of contractual and relational governance mechanisms. Technological Forecasting and Social Change, 161 (August), p. 120315. doi: 10.1016/j. techfore.2020.120315
Fatima, A., Mubin, S., & Masood, R. (2024). Risk-based integrated performance assessment framework for public-private partnership infrastructure projects. Organization, Technology and Management in Construction, 16(1), pp. 251-274. doi: 10.2478/otmcj-2024-0018
Fredrickson, J. W. (1985). Effects of decision motive and organizational performance level on strategic decision processes. Academy of Management Journal, 28 (1), pp. 821-843. doi: 10.1080/0361697920160103
Fredrickson, J. W., & Mitchell, T. R. (1984). Strategic decision processes: Comprehensiveness and performance in an industry with an unstable environment. The Academy of Management Journal, 27(2), pp. 399-423.
Gong, P., Zeng, N., Ye, K., & König, M. (2019). An empirical study on the acceptance of 4D BIM in EPC projects in China. Sustainability (Switzerland), 11 (5), pp. 1-20. doi: 10.3390/su11051316
Grant, R. M. (1991). The resource-based theory of competitive advantage: Implications for strategy formulation. California Management Review, 33(3), pp. 114-135. doi: 10.2307/41166664
Gupta, S., Justy, T., Kamboj, S., Kumar, A., & Kristoffersen, E. (2021). Big data and firm marketing performance: Findings from knowledge-based view. Technological Forecasting and Social Change, 171 (June), p. 120986. doi: 10.1016/j. techfore.2021.120986
Habibi, M., Kermanshachi, S., & Rouhanizadeh, B. (2019). Identifying and measuring engineering, procurement, and construction (EPC) key performance indicators and management strategies. Infrastructures, 4(2). doi: 10.3390/infrastructures4020014
Hair, J. F. et al. (2014). Partial least squares structural equation modeling (PLS-SEMb) An emerging tool in business research. Emerald Insight, 262, 106-121. https://doi.org/10.1108/EBR-10- 2013-0128
Hair, J. F., Black, W. C., Babin, B. J., & Anderson, R. E. (2010). Multivariate Data Analysis. In Pearson Prentice Hall: Vol. Seventh Ed. Pearson Practice Hall.
Hair, J. F., Ringle, C. M., & Sarstedt, M. (2011). PLS-SEM: Indeed a silver bullet. Journal of Marketing Theory and Practice, 19 (2), pp. 139-152. doi: 10.2753/MTP1069-6679190202
Hair, J. F., Risher, J. J., Sarstedt, M., & Ringle, C. M. (2019). When to use and how to report the results of PLS-SEM. European Business Review, 31 (1), pp. 2-24. doi: 10.1108/EBR-11-2018-0203
Halachmi, A. (1986). Strategic Planning and Management ? Not Necessarily. Public Productivity Review, 10(2), 35-50. https://www.jstor.org/stable/3380450
Ham, D. H., Jung, W. J., & Park, J. (2021). Identifying key factors affecting the performance of team decision-making based on the analysis of investigation reports issued from diverse industries. Reliability Engineering and System Safety, 206(November 2020), p. 107304. doi: 10.1016/j. ress.2020.107304
Harrison, J. S., Barney, J. B., Freeman, R. E., & Phillips, R. A. (2019). In J. S. Harrison (Ed.), The Cambridge Handbook of Stakeholder Theory. Cambridge University Press. doi: 10.1017/9781108123495
Helfat, C. E., & Peteraf, M. A. (2003). The dynamic resource-based view: Capability lifecycles. Strategic Management Journal, 24 (10 Special Issue), pp. 997-1010. doi: 10.1002/smj.332
Henseler, J. (2017). Bridging design and behavioral research with variance-based structural equation modeling. Journal of Advertising, 46(1), pp. 178-192. doi: 10.1080/00913367.2017.1281780
Henseler, J., & Chin, W. W. (2010). A comparison of approaches for the analysis of interaction effects between latent variables using partial least squares path modeling. Structural Equation Modeling, 17(1), pp. 82-109. doi: 10.1080/10705510903439003
Herzallah, A., Gutierrez-Gutierrez, L. J., & Munoz Rosas, J. F. (2017). Quality ambidexterity, competitive strategies, and financial performance: An empirical study in industrial firms. International Journal of Operations and Production Management, 37(10), pp. 1496-1519. doi: 10.1108/IJOPM-01- 2016-0053
Hey, J. D., & Knoll, J. A. (2011). Strategies in dynamic decision making – An experimental investigation of the rationality of decision behaviour. Journal of Economic Psychology, 32(3), pp. 399-409. doi: 10.1016/j.joep.2011.02.011
Hickson, D. J., Miller, S. J., & Wilson, D. C. (2003). Planned or prioritized? Two options in managing the implementation of strategic decisions. Journal of Management Studies, 40 (7), pp. 1803-1836. doi: 10.1111/1467-6486.00401
Hitt, M. A., Ireland, R. D., & Hoskisson, R. E. (2009). Strategic Management, Concept and Cases, In Jack W. Calhoun (Ed.), South Western Cengage Learning (8th ed.). South-Western Cengage Learning.
Imran, U., Khurshid, M. B., Khan, U., & Access, O. (2025). Technical paper developing a quality index for pavement construction and rehabilitation. Organization, Technology and Management in Construction, 17, pp. 24-45. doi: 10.2478/otmcj-2025-0002
Jiang, M., Cheng, Y., Lei, T., & Liu, Z. (2021). “Intelligent construction, digital modeling of the future” Internet + BIM service EPC project – Take the exhibition center of national cybersecurity center for education and innovation project as an example. IOP Conference Series: Earth and Environmental Science, 719(2), pp. 1-9. doi: 10.1088/1755-1315/719/2/022043
Ji-fan Ren, S., Fosso Wamba, S., Akter, S., Dubey, R., Childe, S. J., Steven, J., et al. (2017). Modelling quality dynamics, business value and firm performance in a big data analytics environment. International Journal of Production Research, 55 (17), pp. 5011-5026. doi: 10.1080/00207543.2016.1154209
Jones, R. E., Jacobs, L. W., & Van Spijker, W. (1992). Strategic decision processes in international firms. Management International Review, 32(3), pp. 219-236. doi: 10.1007/978-3-663-01562-8
Kabirifar, K., & Mojtahedi, M. (2019). The impact of engineering, procurement and construction (EPC) phases on project performance: A case of large-scale residential construction project. Buildings, 9(1), p. 15. doi: 10.3390/buildings9010015
Kahneman, D., & Klein, G. (2009). Conditions for intuitive expertise: A failure to disagree. American Psychologist, 64(6), pp. 515-526. doi: 10.1037/a0016755
Kalyan, B. H. S., Anandh, S., & Nachiar, S. S. (2025). Predicting stakeholder perspective of alternative dispute resolution in the construction industry using ordinary least square regression. Organization, Technology and Management in Construction, 17, pp. 1-23. doi: 10.2478/otmcj-2025-0001
Kankam-Kwarteng, C., Osman, B., & Donkor, J. (2019). Innovative low-cost strategy and firm performance of restaurants. Asia Pacific Journal of Innovation and Entrepreneurship, 13 (3), pp. 266-281. doi: 10.1108/apjie-05-2018-0034
Keng, T. C., Mansor, N., & Ching, Y. K. (2018). An exploration of cost overrun in building construction projects. Global Business & Management Research, 10(3), pp. 638-646. http://search.ebscohost.com/login.aspx?direct=true&db=b-th&AN=133618157&site=ehost-live&authtype=ip,uid
Kim, J. H., Choi, S. J., Choi, S. W., & Lee, E. B. (2021). AI and text-mining applications for analyzing contractor’s procurement and construction (EPC) projects. Energies, 14. doi: 10.3390/en14154632
Kiron, B. D., Prentice, P. K., & Ferguson, R. B. (2014). The analytics mandate. MITSloan Management Review, 55(2), 29–33. http://sloanreview.mit.edu/analytics-mandate.
Koconegoro, H. (2012). Prospects of Engineering Procurement and Construction (EPC) Business for Construction Companies. Pefindo, December, 3. http://pefindo.com.
Kolbe, L. M., Bossink, B., & de Man, A. P. (2020). Contingent use of rational, intuitive and political decision-making in R&D. Management Decision, 58(6), pp. 997-1020. doi: 10.1108/MD-02-2019-0261
Kotnour, T. G., Teece, D. J., Pisano, G., Shuen, A. M. Y., & Kotnour, T. G. (1997). Dynamic capabilities and strategic management. Knowledge and Strategy, 18(7), pp. 509-533. doi: 10.1016/B978-0-7506-7088-3.50009-7
Lau, N., Hildebrandt, M., & Jeon, M. (2020). Ergonomics in AI: Designing and interacting with machine learning and AI. Ergonomics in Design, 28(3), p. 3. doi: 10.1177/1064804620915238
Liao, S., Hu, Q., & Wei, J. (2023). How to leverage big data analytic capabilities for innovation ambidexterity: A mediated moderation model. Sustainability, 15, p. 3948. doi: 10.3390/su15053948
Liberation, N., & Trope, Y. (1998). The role of feasibility and desirability considerations in near and distant future decisions: A test of temporal construal theory. Journal of Personality and Social Psychology, 75(1), pp. 5-18. doi: 10.1037/0022-3514.75.1.5
Lichtenthaler, U. (2019). An intelligence-based view of firm performance: Profiting from artificial intelligence. Journal of Innovation Management, 7(1), pp. 7-20. doi: 10.24840/2183- 0606_007.001_0002
Liu, Y., Li, W., & Li, Y. (2020). Ambidexterity between low cost strategy and CSR strategy: Contingencies of competition and regulation. Asia Pacific Journal of Management, 37(3), pp. 633-660. doi: 10.1007/s10490-019-09647-3
Makadok, R., & Barney, J. B. (2001). Strategic factor market intelligence: An application of information economics to strategy formulation and competitor intelligence. Management Science, 47(12), pp. 1621-1638. doi: 10.1287/mnsc.47.12.1621.10245
Margaret A. Peteraf, & Barney, B. J. (2003). Unraveling the resource-based tangle. Managerial and Decision Economics, 24(4), 309-323. doi: 10.1002/mde.1126
Marzouk, M. M., & El-Rasas, T. I. (2014). Analyzing delay causes in Egyptian construction projects. Journal of Advanced Research, 5(1), pp. 49-55. doi: 10.1016/j.jare.2012.11.005
McGee, J. E., Dowling, M. J., & Megginson, W. L. (2016). Cooperative strategy and new venture performance: The role of business strategy and management experience. Strategic Management Journal, 16(7), pp. 565-580. doi: 10.1002/smj.4250160706
McGee, J. (2006). The Blackwell handbook of strategic management. In R. E. F. A. J. S. H. eISBN: Michael A. Hitt (Ed.), The Blackwell Handbook of Strategic Management (Vol. 1). doi: 10.1111/b.978 0631218616.2006.x
Merendino, A., Dibb, S., Meadows, M., Quinn, L., Wilson, D., Simkin, L., et al. (2018). Big data, big decisions: The impact of big data on board level decision-making. Journal of Business Research, 93(August), pp. 67-78. doi: 10.1016/j.jbusres.2018.08.029
Mikalef, P., & Manjul, G. (2021). Artificial intelligence capability: Conceptualization, measurement calibration, and empirical study on its impact on organizational creativity and firm performance. Information and Management, 58(3), 103434. doi: 10.1016/j.im.2021.103434
Mintzberg, H. (1978). Patterns in strategy formation. Management Science, 24(9), pp. 934-948. Available at https://www.jstor. org/stable/2630633%0AJSTOR
Mishra, D., Luo, Z., Hazen, B., Hassini, E., Foropon, C., Luo, Z., et al. (2019). Organizational capabilities that enable big data and predictive analytics diffusion and organizational performance: A resource-based perspective. Management Decision, 57(8), pp. 1734-1755. doi: 10.1108/MD-03-2018-0324
Moon, M. J. (2018). The pursuit of managerial entrepreneurship: Does organization matter? Public Administration Review, 59 (1), pp. 31-43. doi: 10.2307/977477
Nikjow, M. A., Liang, L., Qi, X., & Sepasgozar, S. (2021). Engineering procurement construction in the context of belt and road infrastructure projects in West Asia: A SWOT analysis. Journal of Risk and Financial Management, 14 (3), p. 92. doi: 10.3390/jrfm14030092
Nurdiana, A., & Susanti, R. (2020). Assessing risk on the engineering procurement construction (EPC) project from the perspective of the owner: A case study. IOP Conference Series: Earth and Environmental Science, 506(1), p. 012040. doi: 10.1088/1755-1315/506/1/012040
Oyewobi, L. O., Windapo, A., & Rotimi, J. O. B. (2016). Relationship between decision-making style, competitive strategies and organisational performance among construction organisations. Journal of Engineering, Design and Technology, 14(4), pp. 713-738. doi: 10.1108/JEDT-04-2015-0025
Papadakis, V. M. (1998). Green is and organizational performance: An empirical examination. British Journal of Management, 9, pp. 115-132. doi: 10.1111/1467-8551.00078
Pappas, I. O., Mikalef, P., Giannakos, M. N., Krogstie, J., & Lekakos, G. (2018). Big data and business analytics ecosystems: Paving the way towards digital transformation and sustainable societies. Information Systems and E-Business Management, 16(3), pp. 479-491. doi: 10.1007/s10257-018-0377-z
Pappas, I. O., Mikalef, P., Krogstie, J., & Pavlou, P. A. (2020). Big data and business analytics: A research agenda for realizing business value. Information and Management, 57(1), p. 103237. doi: 10.1016/j.im.2019.103237
Park, M. J., Lee, E. B., Lee, S. Y., & Kim, J. H. (2021). A digitalized design risk analysis tool with machine-learning algorithm for EPC contractor’s technical specifications assessment on bidding. Energies, 14 (18), p. 5901. doi: 10.3390/en14185901
Parnell, J. A., & Carolina, N. (2010). Strategic clarity, business strategy and performance. Journal of Strategy and Management, 3 (4), pp. 304-324. doi: 10.1108/17554251011092683
Pehlivanli, E. A. (2024). Dynamics of organisational attractiveness and perceived attributes: Evidence from Turkish construction sector. Organization. Technology and Management in Construction, 16(1), pp. 275-288. doi: 10.2478/otmcj-2024-0019
Perneger, T. V., Courvoisier, D. S., Hudelson, P. M., & Gayet-Ageron, A. (2015). Sample size for pre-tests of questionnaires. Quality of Life Research, 24(1), pp. 147-151. doi: 10.1007/s11136-014- 0752-2
Peteraf, M. A. (1998). The cornestones of competitive advantage: A resource based view. Strategic Management Journal, 14 (3), pp. 179-191. doi: 10.1002/smj.4250140303
Poister, T. H., Edwards, L. H., & Pasha, O. Q. (2022). Strategy formulation and performance: Evidence from local public transit agencies. Public Performance & Management Review, 36(4), pp. 585-615. doi: 10.2753/PMR
Poister, T. H., Pasha, O. Q., Edwards, L. H., Public, S., Review, A., August, J., et al. (2013). Transit industry published by: Wiley on behalf of the American Society for Public Administration. Public Administration Review, 73(4), pp. 625-636. doi: 10.1111/puar.12076
Pollanen, R., Abdel-Maksoud, A., Elbanna, S., & Mahama, H. (2017). Relationships between strategic performance measures, strategic decision-making, and organizational performance: Empirical evidence from Canadian public organizations. Public Management Review, 19(5), pp. 725-746. doi: 10.1080/14719037.2016.1203013
Porter, M. E. (1980). Competitive Strategy: Techniques for Analyzing Industries and Competitors. In Competitive Strategy: Techniques for Analyzing Industries and Competitors (p. 422). The Free Press. doi: 10.4324/9781912281060
Presser, S., Couper, M. P., Lessler, J. T., Martin, E., Martin, J., & Rothgeb, J. M. (2016). Methods for testing and evaluating survey questions. Public Opinion Quarterly, 68(1), pp. 109-130. doi: 10.1093/poq/nfh008
Pryor, M. G., Taneja, S., & Fayol, H. (2010). Henri Fayol, practitioner and theoretician – Revered and reviled. Journal of Management History, 16(4), pp. 489-503. doi: 10.1108/17511341011073960
Raghupathi, W., & Raghupathi, V. (2014). Big data analytics in healthcare: Promise and potential. Health Information Science and Systems, 2, p. 3. doi: 10.1186/2047-2501-2-3
Ramaseshan, B., Ishak, A., & Kingshott, R. P. J. J. (2013). Interactive effects of marketing strategy formulation and implementation upon firm performance. Journal of Marketing Management, 29(11–12), pp. 1224-1250. doi: 10.1080/0267257X.2013.79 6319
Ram, J., & Ronggui, D. (2018). Research and development projects: An empirical investigation of project managers’ traits. International Journal of Managing Projects in Business, 11(4), pp. 913-934. doi: 10.1108/IJMPB-03-2017-0032
Ransbotham, S., & Kiron, D. (2017). Analytics as a source of business innovation. MIT Sloan Management Review, February (58380), Foundation of Marketing 5th edition.
Rehan, A., Thorpe, D., & Heravi, A. (2024). Leadership practices and communication framework for project success – The construction sector. Organization, Technology and Management in Construction, 16(1), pp. 204-223. doi: 10.2478/otmcj-2024-0016
Rumelt, R. P., Schendel, D., & Teece, D. J. (1991). Strategic management and economics. Strategic Management Journal, 12 (2S), pp. 5-29. doi: 10.1002/smj.4250121003
Rusmin, R., Astami, E. W., & Hartadi, B. (2014). The impact of surplus free cash flow and audit quality on earnings management the case of growth triangle countries. Asian Review of Accounting, 22 (3), pp. 217-232. doi: 10.1108/ARA-10-2013-0062
Santos, J. B., & Brito, L. A. L. (2012). Toward a subjective measurement model for firm performance. BAR - Brazilian Administration Review, 9(Special Issue), pp. 95-117. doi: 10.1590/S1807-76922012000500007
Sarstedt, M., Becker, J.-M., Cheah, J.-H., Gholamzade, R., & Ringle, C. M. (2023). PLS-SEM’s most wanted guidance. International Journal of Contemporary Hospitality Management, 35(1), pp. 321-346. doi: 10.1108/IJCHM-04-2022-0474
Sarstedt, M., Hopkins, L., Kuppelwieser, V. G., & Hair, J. F. (2014). Partial least squares structural equation modeling (PLS-SEM): An emerging tool in business research. European Business Review, 26(2), pp. 106-121. doi: 10.1108/EBR-10-2013-0128
Savio, N. D., & Nikolopoulos, K. (2013). A strategic forecasting framework for governmental decision-making and planning. International Journal of Forecasting, 29(2), pp. 311-321. doi: 10.1016/j.ijforecast.2011.08.002
Schildt, H. (2017). Big data and organizational design-the brave new world of algorithmic management and computer augmented transparency. Innovation: Management, Policy and Practice, 19(1), pp. 23-30. doi: 10.1080/14479338.2016.1252043
Secundo, G., Elia, G., Margherita, A., & Leitner, K. H. (2022). Strategic decision making in project management: A knowledge visualization framework. Management Decision, 60 (4), pp. 1159-1181. doi: 10.1108/MD-02-2021-0196
Shamim, S., Zeng, J., Shafi Choksy, U., & Shariq, S. M. (2020). Connecting big data management capabilities with employee ambidexterity in Chinese multinational enterprises through the mediation of big data value creation at the employee level. International Business Review, 29(6), p. 101604. doi: 10.1016/j. ibusrev.2019.101604
Shamim, S., Zeng, J., Shariq, S. M., & Khan, Z. (2019). Role of big data management in enhancing big data decision-making capability and quality among Chinese firms: A dynamic capabilities view. Information and Management, 56(6), p. 103135. doi: 10.1016/j.im.2018.12.003
Shaw, E. H. (2012). Marketing strategy: From the origin of the concept to the development of a conceptual framework. Journal of Historical Research in Marketing, 4 (1), pp. 30-55. doi: 10.1108/17557501211195055
Sirmon, D. G., & Hitt, M. A. (2009). Contingencies within dynamic managerial capabilities: Interdependent effects of resource investment and deployment on firm performance. Strategic Management Journal, 30(13), pp. 1375-1394. doi: 10.1002/smj.791
Song, G., Sun, L., & Wang, Y. (2018). A decision-making model to support the design of a strategic supply chain configuration. Journal of Manufacturing Technology Management, 29 (3), pp. 515-532. doi: 10.1108/JMTM-09-2017-0197
Son, B. Y., & Lee, E. B. (2019). Using text mining to estimate schedule delay risk of 13 offshore oil and gas EPC case studies during the bidding process. Energies, 12 (10), 25. doi: 10.3390/en12101956
Straub, D., Suoniemi, S., Meyer-Waarden, L., Munzel, A., & Zablah, A. R. (2020). Big data and firm performance: The roles of market-directed capabilities and business strategy. Information and Management, 57(7), p. 103365. doi: 10.1016/j. im.2020.103365
Sun, C., Wang, M., & Zhai, F. (2021). Research on the collaborative application of BIM in EPC projects: The perspective of cooperation between owners and general contractors. Advances in Civil Engineering, 2021. doi: 10.1155/2021/4720900
Tallman, S. B. (1991). Strategic management models and resource-based strategies among MNEs in a host market special issue: Global strategy (summer). Strategic Management Journal, 12, pp. 69-82. doi: 10.1002/smj.4250120907
Tan, C. D., Zhang, Y., Sun, J., Wang, Z., & Zheng, G. (2019). Key influencing factors for cross-organizational R & D project stakeholder management. In: IEEE International Conference on Industrial Engineering and Engineering Management, 2019 - December, 651–655. doi: 10.1109/IEEM.2018.8607341
Tawse, A., Patrick, V. M., & Vera, D. (2018). Crossing the chasm: Leadership nudges to help transition from strategy formulation to strategy implementation. ScienceDirect. https://doi. org/10.1016/j.bushor.2018.09.005
Tawse, A., & Tabesh, P. (2021). Strategy implementation: A review and an introductory framework. European Management Journal, 39(1), pp. 22-33. doi: 10.1016/j.emj.2020.09.005
Van Riel, A. C. R., Lemmink, J., & Ouwersloot, H. (2004). High-technology service innovation success: A decision-making perspective. Journal of Product Innovation Management, 21(5), pp. 348-359. doi: 10.1111/j.0737-6782.2004.00087.x
Varadarajan, R. (2020). Customer information resources advantage, marketing strategy and business performance: A market resources based view. Industrial Marketing Management, 89(February), pp. 89-97. doi: 10.1016/j. indmarman.2020.03.003
Venkatraman, N., & Camillus, J. C. (1984). Exploring the Concept of "Fit" in Strategic Management. The Academy of Management Review, 9(3), 513-525. http://www.jstor.org/stable/258291
Wagner, R. F. (2020). EPC 4.0: The quest for reducing CAPEX in EPC projects. Organization, Technology and Management in Construction, 12(1), pp. 2245-2255. doi: 10.2478/otmcj-2020- 0020
Wamba, F., Akter, S., Edwards, A., Chopin, G., & Gnanzou, D. (2015). How “big data” can make big impact: Findings from a systematic review and a longitudinal case study. International Journal of Production Economics, 165, pp. 234-246. doi: 10.1016/j.ijpe.2014.12.031
Wamba, S. F., Dubey, R., Gunasekaran, A., & Akter, S. (2020). The performance effects of big data analytics and supply chain ambidexterity: The moderating effect of environmental dynamism. International Journal of Production Economics, 222(September 2019), p. 107498. doi: 10.1016/j. ijpe.2019.09.019
Wamba, S. F., Gunasekaran, A., Akter, S., Fan Ren, S. J., Dubey, R., & Childe, S. J. (2017). Big data analytics and firm performance: Effects of dynamic capabilities. Journal of Business Research, 70, pp. 356-365. doi: 10.1016/j.jbusres.2016.08.009
Wang, K., Xu, Y., Wang, C., Tan, M., & Chen, P. (2020). A corrected goodness-of-fit index (CGFI) for model evaluation in structural equation modeling. Structural Equation Modeling, 27(5), pp. 735-749. doi: 10.1080/10705511.2019.1695213
Wang, Z., Sharma, P. N., & Cao, J. (2016). From knowledge sharing to firm performance: A predictive model comparison. Journal of Business Research, 69(10), pp. 4650-4658. doi: 10.1016/j. jbusres.2016.03.055
Wei, P., & Yang, J. (2010). Causes of delay in the planning and design phases for construction projects. Journal of Architectural Engineering, 16 (2), pp. 80-83. doi: 10.1061/(asce)1076- 0431(2010)16:2(80)
Westley, F., & Mintzberg, H. (1989). Visionary leadership and strategic management. Strategic Management Journal, 10 (Summer), pp. 17-32. Available at http://www.jstor.org/stable/2486580. doi: 10.1002/smj.4250100704
Yasmin, M., Tatoglu, E., Kilic, H. S., Zaim, S., & Delen, D. (2020). Big data analytics capabilities and firm performance: An integrated MCDM approach. Journal of Business Research, 114 (March), pp. 1-15. doi: 10.1016/j.jbusres.2020.03.028
Yukl, G., Chavez, C., & Seifert, C. F. (2005). Assessing the construct validity and utility of two new influence tactics. Journal of Organizational Behavior, 26(6), pp. 705-725. doi: 10.1002/job.335