Have a personal or library account? Click to login

Life-cycle cost estimation of a building structure: An example of partition walls

Open Access
|Feb 2024

References

  1. Biolek, V., & Hanák, T. (2019). LCC estimation model: A construction material perspective. Buildings, 9(8), p. 182.
  2. Bottero, M., Caprioli, C., & Oppio, A. (2021). A literature review on construction costs estimation: Hot topics and emerging trends. In Morano, P. et al. (Ed.), Appraisal and Valuation. Green Energy and Technology. Springer, Cham, pp. 117-131.
  3. Bromilow, F. J., & Pawsey, M. R. (1987). Life cycle cost of university buildings. Construction Management and Economics, 5, pp. S3-S22.
  4. Car-Pušić, D., Marović, I., Mladen, M., & Tijanić, K. (2020). Predicting buildings construction cost overruns on the basis of cost overruns structure. Przegląd Nauk. Inżynieria i Kształtowanie Środowiska, 29(3), pp. 366-376.
  5. Cemix, wall systém, Available at https://www.cemix.cz/data/files/cemix_omitkove_systemy_2012.pdf. [Accessed 2012].
  6. Cerić, A., Vukomanović, M., Ivić, I., & Kolarić, S. (2020). Trust in megaprojects: A comprehensive literature review of research trends. International Journal of Project Management, 39(4), pp. 325-338.
  7. ČSN 73 0532 (730532). (2020). Akustika – Ochrana proti hluku v budovách a posuzování akustických vlastností stavebních konstrukcí a výrobků – Požadavky. Praha: Úřad pro technickou normalizaci, metrologii a státní zkušebnictví.
  8. European Commission. Life-cycle costing. Available at https://ec.europa.eu/environment/gpp/lcc.htm (accessed on 7 Feb 2023).
  9. Fan, M., & Sharma, A. (2021). Design and implementation of construction cost prediction model based on SVM and LSSVM in industries 4.0. International Journal of Intelligent Computing and Cybernetic, 14(2), pp. 145-157.
  10. Flores-Colen, I., & de Brito, J. (2010). A systematic approach for maintenance budgeting of buildings façades based on predictive and preventive strategies. Construction and Building Materials, 24(9), pp. 1718-1729.
  11. Flyvbjerg, B. (2009). Survival of the unfittest: Why the worst infrastructure gets built – and what we can do about it. Oxford Review of Economic Policy, 25(3), pp. 344-367.
  12. Galimshina, A., Moustapha, M., Hollberg, A., Padey, P., Lasvaux, S., & Sudret, B., et al. (2020). Statistical method to identify robust building renovation choices for environmental and economic performance. Building and Environment, 183, p. 107143.
  13. Goh, B. H., & Sun, Y. (2016). The development of life-cycle costing for buildings. Building Research and Information, 44(3), pp. 319-333.
  14. Heluz katalog. kompletní cihelný systém pro hrubou stavbu. Available at https://www.heluz.cz/files/obecne/katalog/1045402-katalog-vyrobku-heluz.PDF. [Accessed červenec 2021].
  15. Heralova, R. S. (2017). Life cycle costing as an important contribution to feasibility study in construction projects. Procedia Engineering, 196, pp. 565-570.
  16. Illankoon, I. M. C. S., & Lu, W. (2019). Optimising choices of ‘building services’ for green building: Interdependence and life cycle costing. Building and Environment, 161, p. 106247.
  17. Islam, H., Jollands, M., & Setunge, S. (2015). Life cycle assessment and life cycle cost implication of residential buildings – A review. Renewable and Sustainable Energy Reviews, 42, pp. 129-140.
  18. ISO 15686-5:2017. Buildings and constructed assets – Service life planning. Part 5: Life–cycle costing. Publication date: 2017-07.
  19. Juszczyk, M. (2016). Application of PCA-based data compression in the ANN-supported conceptual cost estimation of residential buildings. AIP Conference Proceedings, 1738, pp. 1-8.
  20. Juszczyk, M. (2018). Implementation of the ANNs ensembles in macro-BIM cost estimates of buildings’ floor structural frames. AIP Conference Proceedings, 1946, pp. 1-5.
  21. Korytarova, J., & Hromadka, V. (2010). Building life cycle economic impacts. In: 2010 International Conference on Management and Service Science, Wuhan, China, 24-26 August 2010, pp. 1-4.
  22. Korytárová, J., & Papežíková, P. (2015). Assessment of large-scale projects based on CBA. Procedia Computer Science, 64, pp. 736-743.
  23. Krzemiński, M. (2017). Optimization of work schedules executed using the flow shop model, assuming multitasking performed by work crews. Archives of Civil Engineering, 63(4), pp. 3-19.
  24. Kupilík, V. (1999). Závady a životnost staveb. Grada, Praha, Czech Republic, 288 p.
  25. Lazzarin, R. M., Busato, F., & Castelloti, F. (2008). Life cycle assessment and life cycle cost of buildings’ insulation materials in Italy. International Journal of Low Carbon Technologies, 3(1), pp. 44-58.
  26. Leśniak, A., Wieczorek, D., & Górka, M. (2020). Costs of facade systems execution. Archives of Civil Engineering, 66(1), pp. 81-95.
  27. Marchini, A., & Patzlaff, J. O. (2016). Building information modeling (BIM) application in civil constructions intending the increase of service life. Journal of Building Pathology and Rehabilitation, 1(1), p. 12.
  28. Marková, L. (2011). Náklady životního cyklu stavby: náklady investora, celospolečenské dopady. Akademické nakladatelství CERM, Brno, 125 p.
  29. Mésároš, P., Mandičák, T., Spišáková, M., Behúnová, A., & Behún, M. (2021). The implementation factors of information and communication technology in the life cycle costs of buildings. Applied Sciences, 11(7), p. 2934.
  30. Nematchoua, M. K., Raminosoa, C. R. R., Mamiharijaona, R., René, T., Orosa, J. A., & Elvis W., et al. (2015). Study of the economical and optimum thermal insulation thickness for buildings in a wet and hot tropical climate: Case of Cameroon. Renewable and Sustainable Energy Reviews, 50, pp. 1192-1202.
  31. Oduyemi, O., Okoroh, M. I., Fajana, O. S., & Arowosafe, O. (2018). The need for economic performance measures for life cycle costing of sustainable commercial office buildings. Journal of Facilities Management, 16(1), pp. 54-64.
  32. Plebankiewicz, E., & Wieczorek, D. (2020). Adaptation of a cost overrun risk prediction model to the type of construction facility. Symmetry (Basel), 12(10), p. 1739.
  33. Plebankiewicz, E., Zima, K., & Wieczorek, D. (2021). Modelling of time, cost and risk of construction with using fuzzy logic. Journal of Civil Engineering and Management, 27(6), pp. 412-426.
  34. Příčky zděné (těžké). Available at https://www.estav.cz/cz/808.pricky-zdene-tezke. [accessed 6 August, 2016].
  35. Prostějovská, Z. (2008). Management výstavbových projektů. Vyd. 1. V Praze: České vysoké učení technické, 200 s.
  36. Qazi, A., Quigley, J., Dickson, A., & Kirytopoulos, K. (2016). Project complexity and risk management (ProCRiM): Towards modelling project complexity driven risk paths in construction projects. International Journal of Project Management, 34(7), pp. 1183-1198.
  37. Santos, R., Costa, A. A., Silvestre, J. D., Vandenbergh, T., & Pyl, L., (2020). BIM-based life cycle assessment and life cycle costing of an office building in Western Europe. Building and Environment, 169, p. 106568.
  38. Silva, A., & de Brito, J. (2021). Service life of building envelopes: A critical literature review. Journal of Building Engineering, 44, p. 102646.
  39. Śladowski, G., Szewczyk, B., Sroka, B., & Radziszewska-Zielina, E. (2019). Using stochastic decision networks to assess costs and completion times of refurbishment work in construction. Symmetry (Basel), 11(3), p. 398.
  40. Sobanjo, J. O. (1999). Facility life-cycle cost analysis on fuzzy sets theory. Durability of Building Materials and Components 8. Institute for Research in Construction, Ottawa, Canada.
  41. Spickova, M., & Myskova, R. (2015). Costs efficiency evaluation using life cycle costing as strategic method. Procedia Economics and Finance, 34, pp. 337-343.
  42. Tillmann, J. (1997). Příprava, provádění a užívání staveb 2. Prospektrum, Praha.
  43. Torres, A., Acosta, L. M., Gibert, V., & Serrat, C. (2019). Implementation of a multi-scale predictive system of the degradation of the urban front in Brno, Czech Republic. IOP Conference Series: Earth and Environmental Science, 222, p. 012029.
  44. ÚRS, a.s. Katalog stavebních konstrukcí a prací ÚRS, cenová úroveň 2021/2.
  45. Venkrbec, V., Galić, M., & Klanšek, U. (2012). Construction process optimisation - Review of methods, tools and applications. Gradjevinar, 70(7), pp. 593-606.
  46. Wong, I. L., Perera, S., & Eames, P. C. (2010). Goal directed life cycle costing as a method to evaluate the economic feasibility of office buildings with conventional and TI-façades. Construction Management and Economics, 28(7), pp. 715-735.
  47. Xie, S., & Fang, J. (2018). Prediction of construction cost index based on multi variable grey neural network model. International Journal of Information Systems and Change Management, 10(3), p. 209-226.
DOI: https://doi.org/10.2478/otmcj-2023-0017 | Journal eISSN: 1847-6228 | Journal ISSN: 1847-5450
Language: English
Page range: 13 - 26
Submitted on: Aug 7, 2023
Accepted on: Nov 12, 2023
Published on: Feb 13, 2024
Published by: University of Zagreb
In partnership with: Paradigm Publishing Services
Publication frequency: 1 times per year

© 2024 Vojtech Biolek, Tomaš Hanak, published by University of Zagreb
This work is licensed under the Creative Commons Attribution 4.0 License.