Abisuga, O. A., Ogungbemi, A. O., Akinpelu, A. A., & Oshodi, O. S. (2017). Assessment of building maintenance projects success factors in developing countries. Journal of Construction Business and Management, 1(1), pp. 29-38.
Akasah, Z., & Alriwaimi, H. M. R. (2015). A Review of Factors Affecting the Success of Building Maintenance Projects. Universit Tun Hussein Onn Malaysia, pp. 1-10.
Akasah, Z.A., & Alriwaimi, H.M. (2015), A review of factors affecting the success of building maintenance projects”, The 2nd International Conference on Construction and Building Engineering (ICONBUILD 2015), 11-13 August 2015. Grand Inn Muara, Padang, West Sumatera, Indonesia, pp. 1-10.
Barrett, P. S., Hudson, J., & Stanley, C. (1996). Is briefing innovation? In: Langford, D. A., & Retik, A. (eds.), International Symposium for the Organisation and Management of Construction: Shaping Theory and Practice. E & F N Spon, London, pp. 87-95.
Basi, D. (2015). How does early supplier involvement (ESI) timing affect development costs. In: 5th International Business Administration (IBA) Bachelor Thesis Conference, University of Twente, The Faculty of Behavioural, Management and Social sciences, Enschede, The Netherlands, pp. 85-92.
Building and Construction Authority. (2014). Design for maintainability checklist. Available at https://www1.bca.gov.sg/docs/default-source/docs-corp-buildsg/dm_checklist_2016. pdf?sfvrsn=8c2da349_0 (Access Date: 8 July 2023).
Chavhan, R., Mahajan, S. K., & Sarang, J. (2012). Supplier development: Theories and practices. IOSR Journal of Mechanical and Civil Engineering, 3(3), pp. 37-51.
Chew, M. Y. L., Asmone, A. S., & Conejos, S. (2018). Design for maintainability: Benchmarks for quality buildings. World Scientific Publishing Co. Pte. Ltd., Singapore.
De Silva, N., Ranasinghe, M., & De Silva, C. R. (2012). Risk factors affecting building maintenance under tropical conditions. Journal of Financial Management of Property and Construction, 17(3), pp. 235-252.
EDMS. (2010). Framework. Engineering Data Management Service. Available at http://cedar.web.cern.ch/CEDAR/glossary.html#Framework [accessed 2 January, 2010].
El-Saeidy, Y. A. A., & Othman, A. A. E. (2021). Early supplier involvement: A novel approach for reducing construction waste generated during the architectural design process. In: Proceedings of the 3rd International Conference on Sustainable Construction and Project Management: Integrated Management for Smart Cities, ICSCPM 21, Housing and Building National Research Center, Dokki, 20-22 June 2021.
FluidSurveys Team. (2014). Calculating the right survey sample size, Available at http://fluidsurveys.com/university/calculating-right-survey-sample-size/ [accessed 2 February, 2022].
John, M., & Jeffrey, R. (2000). Model process for implementing maintainability. Journal of Construction Engineering and Management, 126(6), pp. 440-450.
Johnsen, T. E. (2009). Supplier involvement in new product development and innovation: Taking stock and looking to the future. Journal of Purchasing and Supply Management, 15(3), pp. 187-197.
Kamal, A., Othman, A. A. E., & Refaat, M. (2019). Enhancing building maintainability through suppliers involvement in project design phase. In: Proceedings of the International Conference on Architecture and Urbanism: A Smart Outlook, Hilton Heliopolis Cairo, October 14-16, 2019, pp. 485-498.
Kamara, J. M., Anumba, C. J. & Hobbs, B. (1999), “From briefing to client requirements processing”, Proceedings of the 15th Annual Conference, Association of Research in Construction Management (ARCOM), Liverpool John Moores University, Liverpool, 15-17 September 1999, Vol. 1, pp. 317-326.
Kannan, V. R., & Tan, K. C. (2002), Supplier selection and assessment: their impact on business performance. The Journal of Supply Chain Management, 38, pp. 11-21.
Kanniyapana, G., Mohammad, I.S., Nesanc, L. J., Mohammed, A. H., Abdullah, M. N. M, Asmonib, M. & Ganisena, S. (2015), “Implementing maintainability in building material selection: a preliminary survey”, Jurnal Teknologi (Sciences & Engineering), 77 (30), pp. 145-154.
Katunzi, T. M. (2011). Obstacles to process integration along the supply chain: Manufacturing firms perspective international. Journal of Business and Management, 6(5), pp. 105-113.
Khan, S. (2013). Designing buildings for minimum maintenance to achieve sustainability. Journal of Architecture, 3(4), pp. 74-78. doi: 10.5923/j.arch.20130304.04.
Koufteros, X. A., Edwin Cheng, T. C., & Lai, K.-H. (2007). “Black-box” and “gray-box” supplier integration in product development: Antecedents, consequences and the moderating role of firm size. Journal of Operations Management, 25(4), pp. 847-870. doi: 10.1016/j.jom.2006.10.009.
Lau, W. K., & Ho, D. C. W. (2010). Facilities Management for Building Maintainability: A Research Framework. CIB W70 International Conference on Facilities Management, Sao Paulo, Brazil, pp. 655-670.
Northey, G. (2018). An Introduction to Early Supplier Involvement in the Construction Industry. CRH Americas, Inc. Available at https://www.buildingsolutions.com/industry-insights/introduction-to-earlier-supplier-involvement-in-the-construction-industry [Accessed 20 November, 2019].
Ofori, I., Duodu, P. M., & Bonney, S. O. (2015). Establishing factors influencing building maintenance practices: Ghanaian perspective. Journal of Economics and Sustainable development, 6, pp. 184-193.
Ogunmakinde, O. E., Akinola, A. A., & Siyanbola, A. B. (2013). Analysis of the factors affecting building maintenance in government residential estates in Akure. Journal of Environmental Sciences and Resources Management, 5(2), pp. 89-103.
Othman, A. A. E. (2007). Generating sustainable values and achieving client satisfaction in construction projects through maintenance management: The case of housing projects in Abu Dhabi, United Arab Emirates. Architectural Engineering and Design Management, 3(3), pp. 145-159.
Othman, A. A. E., & El-Saeidy, Y. A. (2022). Early supplier involvement framework for reducing construction waste during the design process. Journal of Engineering, Design and Technology. doi: 10.1108/JEDT-10-2021-0566.
Othman, A. A. E., Hassan, T. M., & Pasquire, C. L. (2004). Drivers for dynamic brief development in construction. Engineering, Construction and Architectural Management, 11(4), pp. 248-258.
Othman, A. A. E., & Youssef, L. Y. W. (2020). A framework for implementing integrated project delivery in architecture design firms in Egypt. Journal of Engineering, Design and Technology, 19(3), pp. 721-757. doi: 10.1108/JEDT-02-2020-0047.
PAS 1192-2. (2019). Specification for information management for the capital/delivery phase of construction projects using building information modelling, Publicly Available Specifications. Available at PAS 1192-2: PAS 1192-2 Delivery Phase of Construction Project – Operam.
Petersen, K., Handfield, R., & Ragatz, G. (2003), A model of supplier integration into new product development. Journal of Product Innovation Management, 20(4), pp. 284-299.
Rached, F., Hraoui, Y., Karam, A., & Hamzeh, F. (2014). Implementation of IPD in the Middle East and its challenges. In: Proceedings International Group for Lean Construction, Oslo, Norway, Proceedings IGLC-22, pp. 293-304.
Rocha, P. F., & Rodrigues, R. C. (2017). How to maintain buildings: Intervention strategies for the operationalization process of building maintenance regarding the design stages. Available at LV2017Howtomaintain.pdf.
Saghatforoush, E. (2014). Extension of constructability to include operation and maintenance for infrastructure projects. PhD thesis, Science and Engineering Faculty Queensland University of Technology.
Sofi, M., Zou, Z., Lumantarna, E., Mendis, P., & Aye, L. (2016). Maintenance of building structural systems. In: 7th International Conference on Sustainable Built Environment (ICSBE), Kandy, Sri Lanka, pp. 53-61.
Sturman, A. (1997). Case study methods. In: Keeves, J. P. (ed.), Educational Research, Methodology and Measurement: An International Handbook, 2nd edn. Pergamon, Oxford, pp. 61-66.
Talib, R., Ahmad, G., Zakaria, N., & Sulieman, M. (2014). Assessment of factors affecting building maintenance and defects of public buildings in Penang, Malaysia. Architecture Research, 4(2), pp. 48-53.
Williamson, A., Williams, C., & Gameson, R. (2010). The consideration of maintenance issues during the design process in the UK public sector. In: Egbu, C. (ed.), Proceedings of the 26th Annual ARCOM Conference, 6-8 September 2010, Association of Researchers in Construction Management, Leeds, UK, pp. 1091-1100.
Zhao, Y., Cavusgil, E., & Cavusgil, S. T. (2014). An investigation of the black-box supplier integration in new product development. Journal of Business Research, 67(6), pp. 1058-1064.