References
- Al-Hawari, S., Thabtah, F., Karadsheh, L., & Hadi, W. M. (2008). A risk management model for project execution. In: Proceedings of the 9th International Business Information Management Association conference (IBIMA), Conference on Information Management in Modern Organizations: Trends & Challenges, Marrakech, Morocco, pp. 887–893.
- Association for Project Management. (2018). Project risk analysis & management (PRAM) mini guide. UK, Available at https://www.apm.org.uk/media/10466/pram_web.pdf/ [accessed 15 March, 2022].
- Aven, T., & Heide, B. (2009). Reliability and validity of risk analysis. Reliability Engineering and System Safety, 94(11), pp. 1862–1868. doi: 10.1016/j.ress.2009.06.003.
- Banaitiene, N., & Banaitis, A. (2012). Risk management in construction projects. In: Banaitiene, N. (ed.), Risk Management–Current Issues and Challenges. InTech, Croatia, pp. 429–448. doi: 10.5772/51460.
- Bissonette, M. M. (2016). Project Risk Management: A Practical Implementation Approach. Project Management Institute, Newtown Square, Pennsylvania.
- Choudhry, R. M., & Iqbal, K. (2013). Identification of risk management system in construction industry in Pakistan. Journal of Management in Engineering, 29(1), pp. 42–49. doi: 10.1061/(ASCE)ME.1943-5479.0000122.
- Cooper, D. F., Grey, S., Raymond, G., & Walker, P. (2005). Project Risk Management Guidelines: Managing Risk in Large Projects and Complex Procurements. John Wiley & Sons Ltd, Chichester, West Sussex, England.
- Dikmen, I., Birgonul, M. T., & Han, S. (2007). Using fuzzy risk assessment to rate cost overrun risk in international construction projects. International Journal of Project Management, 25(5), pp. 494–505. doi: 10.1016/j.ijproman.2006.12.002.
- Ebrahimia, M., Asadia, M., Akbarib, H., & Shakeric, A. (2012). Petrochemical industries and the opportunities provided by effective risk management: A case study. In: 26th IPMA World Congress, Crete, Greece.
- El-Sayegh, S. M. (2008). Risk assessment and allocation in the UAE construction industry. International Journal of Project Management, 26(4), pp. 431–438. doi: 10.1016/j.ijproman.2007.07.004.
- El-Sayegh, S. M., & Mansour, M. H. (2015). Risk assessment and allocation in highway construction projects in the UAE. Journal of Management in Engineering, 31(6), p. 04015004. doi: 10.1061/(ASCE)ME.1943-5479.0000365.
- Fenz, S., & Ekelhart, A. (2011). Verification, validation, and evaluation in information security risk management. IEEE Security and Privacy, 9(2), pp. 58–65. doi: 10.1109/MSP.2010.117.
- Institute of Risk Management (2018). Standard Deviations A Risk Practitioners Guide to ISO 31000. London, Available at https://www.theirm.org/media/6884/irm-report-iso-31000-2018-v2.pdf/ [accessed 15 March, 2022].
- Institute of Risk Management. (2002). A Risk Management Standard. London, Available at https://www.theirm.org/what-we-do/what-is-enterprise-risk-management/irms-risk-management-standard/ [accessed 10 December, 2020].
- Jarkas, A. M., & Haupt, T. C. (2015). Major construction risk factors considered by general contractors in Qatar. Journal of Engineering, Design and Technology, 13(1), pp. 165–194. doi: 10.1108/JEDT-03-2014-0012.
- Kayis, B., Zhou, M., Savci, S., Khoo, Y. B., Ahmed, A., & Kusumo, R., et al. (2007). IRMAS – Development of a risk management tool for collaborative multi-site, multi-partner new product development projects. Journal of Manufacturing Technology Management, 18(4), pp. 387–414. doi: 10.1108/17410380710743770.
- Kendrick, T. (2003). Identifying and Managing Project Risk: Essential Tools for Failure-Proofing Your Project. American Management Association, United States.
- Kuo, Y. C., & Lu, S. T. (2013). Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects. International Journal of Project Management, 31(4), pp. 602–614. doi: 10.1016/j.ijproman.2012.10.003.
- Lathrop, J., & Ezell, B. (2017). A systems approach to risk analysis validation for risk management. Safety Science, 99, pp. 187–195. doi: 10.1016/j.ssci.2017.04.006.
- Lin, W., Yaqi, L., & Enmao, W. (2011). Research on risk management of railway engineering construction. Systems Engineering Procedia, 1, pp. 174–180. doi: 10.1016/j.sepro.2011.08.029.
- Mubarak, S. A. (2010). Construction Project Scheduling and control, 2nd edn. John Wiley & Sons Inc, Hoboken, NJ.
- Nieto-Morote, A., & Ruz-Vila, F. (2011). A fuzzy approach to construction project risk assessment. International Journal of Project Management, 29(2), pp. 220–231. doi: 10.1016/j.ijproman.2010.02.002.
- Perera, J., & Holsomback, J. (2005). An integrated risk management tool and process. In: IEEE Aerospace Conference Proceedings, Big Sky, MT. USA, pp. 129–136. doi: 10.1109/AERO.2005.1559306.
- Project Management Institute. (2017). Project Management Book of Knowledge, 6th edn. Newtown Square, PA, USA.
- Serpell, A. F., Ferrada, X., & Rubio, L. (2019). Measuring the performance of project risk management: A preliminary model. Organization, Technology and Management in Construction: An International Journal, 11(1), pp. 1984–1991. doi: 10.2478/otmcj-2019-0005.
- Suokas, J. (1985). On the reliability and validity of safety analysis: Dissertation. Tampere University of Technology, Available at https://cris.vtt.fi/en/publications/on-the-reliability-and-validity-of-safety-analysis-dissertation.
- Yildiz, A. E., Dikmen, I., Birgonul, M. T., Ercoskun, K., & Alten, S. (2014). A knowledge-based risk mapping tool for cost estimation of international construction projects. Automation in Construction, 43, pp. 144–155. doi: 10.1016/j.autcon.2014.03.010.
- Zhao, Z. Y., & Duan, L. L. (2008). An integrated risk management model for construction projects. In: PICMET: Portland International Conference on Management of Engineering & Technology. IEEE, pp. 1389–1394. doi: 10.1109/PICMET.2008.4599751.
- Zhi, H. (1995). Risk management for overseas construction projects. International Journal of Project Management, 13(4), pp. 231–237. doi: 10.1016/0263-7863(95)00015-I.
- Zou, P. X. W., Zhang, G., & Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6), pp. 601–614. doi: 10.1016/j.ijproman.2007.03.001.