Have a personal or library account? Click to login
Assessing the role and significance of project selection by the contractors in the Saudi construction industry Cover

Assessing the role and significance of project selection by the contractors in the Saudi construction industry

Open Access
|May 2021

References

  1. Asgari, S., Awwad, R., Kandil, A., & Odeh, I. (2016). Impact of considering need for work and risk on performance of construction contractors: An agent-based approach. Automation in Construction, 65, pp. 9–20. doi: 10.1016/j.autcon.2016.01.004
  2. Banaitiene, N., & Banaitis, A. (2006). Analysis of criteria for contractors’ qualification evaluation. Technological and Economic Development of Economy, 12(4), pp. 276–282.
  3. Costantino, F., Di Gravio, G., & Nonino, F. (2015). Project selection in project portfolio management: An artificial neural network model based on critical success factors. International Journal of Project Management, 33(8), pp. 1744–1754. doi: 10.1016/j.ijproman.2015.07.003
  4. Eastman, C. M. (2018). Building Product Models: Computer Environments, Supporting Design and Construction. CRC Press, Boca Raton.
  5. Huang, X. (2011). An analysis of the selection of project contractor in the construction management process. International Journal of Business and Management, 6(3), p. 184. doi: 10.5539/ijbm.v6n3p184
  6. Ikediashi, D. I., Ogunlana, S. O., & Alotaibi, A. (2014). Analysis of project failure factors for infrastructure projects in Saudi Arabia: A multivariate approach. Journal of Construction in Developing Countries, 19(1), p. 35.
  7. Kaiser, M. G., El Arbi, F., & Ahlemann, F. (2015). Successful project portfolio management beyond project selection techniques: Understanding the role of structural alignment. International Journal of Project Management, 33(1), pp. 126–139. doi: 10.1016/j.ijproman.2014.03.002
  8. Lin, J. H., & Yang, C. J. (2016). Applying analytic network process to the selection of construction projects. Open Journal of Social Sciences, 4(3), p. 41. doi: 10.4236/jss.2016.43007
  9. Mok, K. Y., Shen, G. Q., & Yang, J. (2015). Stakeholder management studies in mega construction projects: A review and future directions. International Journal of Project Management, 33(2), pp. 446–457. doi: 10.1016/j.ijproman.2014.08.007
  10. Oakland, J. S., & Marosszeky, M. (2017). Total Construction Management: Lean Quality in Construction Project Delivery. Routledge, USA.
  11. Olaniran, O. J. (2015). The effects of cost-based contractor selection on construction project performance. Journal of Financial Management of Property and Construction, 20(3), pp. 235–251. doi: 10.1108/jfmpc-06-2014-0008
  12. Ozcelik, M. (2016). Criteria for the selection of construction method at the Ovit Mountain Tunnel (Turkey). KSCE Journal of Civil Engineering, 20(4), pp. 1323–1328. doi: 10.1007/s12205-015-0055-3
  13. Parvan, K., Rahmandad, H., & Haghani, A. (2015). Inter-phase feedbacks in construction projects. Journal of Operations Management, 39, pp. 48–62. doi: 10.1016/j.jom.2015.07.005
  14. Pekuri, A., Pekuri, L., & Haapasalo, H. (2015). Business models and project selection in construction companies. Construction Innovation, 15(2), pp. 180–197.
  15. Rejment, M., & Dziadosz, A. (2014). Selected aspects of construction projects selection including risk estimation. Czasopismo Techniczne, 1-B(5), pp. 221–228.
  16. Sheng, Z. (2018). Fundamental principles behind the theory of mega infrastructure construction management. In: Fundamental Theories of Mega Infrastructure Construction Management. Springer, Cham, pp. 135–183. doi: 10.1007/978-3-319-61974-3_6
  17. Taylan, O., Bafail, A. O., Abdulaal, R. M., & Kabli, M. R. (2014). Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies. Applied Soft Computing, 17, pp. 105–116. doi: 10.1016/j.asoc.2014.01.003
  18. Turner, J. R. (2004). Five necessary conditions for project success. International Journal of Project Management, 5(22), pp. 349–350.
  19. Walker, A. (2015). Project Management in Construction. John Wiley and Sons, Hong Kong.
  20. Wanous, M., Boussabaine, A. A., & Lewis, J. (2000). To bid or not to bid: A parametric solution. Construction Management and Economics, 18(4), pp. 457–466.
DOI: https://doi.org/10.2478/otmcj-2021-0005 | Journal eISSN: 1847-6228 | Journal ISSN: 1847-5450
Language: English
Page range: 2367 - 2373
Submitted on: Dec 23, 2019
|
Accepted on: May 6, 2020
|
Published on: May 18, 2021
Published by: University of Zagreb
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2021 Abdulrahman Bageis, Saleh Alsulamy, published by University of Zagreb
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.