Abdul Kadir, M. R., Lee, W. P., Jaafar, M. S., Sapuan, S. M., & Ali, A. A. A. (2005). Factors affecting construction labour productivity for Malaysian residential projects. Structural Survey, 23(1), pp. 42–54. doi: 10.1108/02630800510586907.
Al-Tabtabai, H., Kartam, N., Flood, I., & Alex, A. P. (1997). Construction project control using artificial neural networks. Artificial Intelligence for Engineering Design, Analysis and Manufacturing: AIEDAM, 11(1), pp. 45–57. Available at https://www.scopus.com/inward/record.uri?eid=2-s2.0-0030649909&partnerID=40&md5=96331d-756b7156493aca6946cedc8869.
Ameh, O., & Osegbo, E. (2011). Study of relationship between time overrun and productivity on construction sites. International Journal of Construction Supply Chain Management, 1(1), pp. 56–67. doi: 10.14424/ijcscm101011-56-67.
Apolot, R., Alinaitwe, H., & Tindiwensi, D. (2011). An investigation into the causes of delay and cost overrun in Uganda's public sector construction projects. Journal of Construction in Developing Countries. doi: 10.5121/ijcsit.2011.3406.
Arditi, D., Sikangwan, P., & Tokdemir, O. B. (2002). Scheduling system for high rise building construction. Construction Management and Economics. doi: 10.1080/01446190210131647.
Ashly Babu, M., & Kanchana, S. (2014). Role of insurance in construction and infrastructure projects. pp. 30–31. Available at: http://www.iaeme.com/MasterAdmin/UploadFolder/ROLE OF INSURANCE IN CONSTRUCTION AND INFRASTRUCTURE PROJECTS-2/ROLE OF INSURANCE IN CONSTRUCTION AND INFRASTRUCTURE PROJECTS-2.pdf.
Best, R. (2010). Using purchasing power parity to assess construction productivity. Australasian Journal of Construction Economics and Building, 10(4), pp. 1–10.
Chalker, M., & Loosemore, M. (2016). Trust and productivity in Australian construction projects: A subcontractor perspective. Engineering, Construction and Architectural Management, 23(2), pp. 192–210. doi: 10.1108/ECAM-06-2015-0090.
Chancellor, W., & Abbott, M. (2015). The Australian construction industry: Is the shadow economy distorting productivity? Construction Management and Economics, 33(3), pp. 176–186. doi: 10.1080/01446193.2015.1028954.
Dai, J., Maloney, W. F., Goodrum, P., & Srinivasan, C. (2009). Latent structures of the factors affecting construction labor productivity. Journal of Construction Engineering and Management, 135(5), pp. 397–406. doi: 10.1061/(ASCE)0733-9364(2009)135:5(397).
Dallasega, P., & Rauch, E. (2017). Sustainable construction supply chains through synchronized production planning and control in engineer-to-order enterprises. Sustainability, 9(10), p. 1888. doi: 10.3390/su9101888.
Dixit, S. (2018). Analysing Enabling Factors Affecting the On-site Productivity in Indian Construction Industry. Periodica Polytechnica Architecture. Periodica Polytechnica Budapest University of Technology and Economics, 49(2), pp. 185–193. doi: 10.3311/ppar.12710.
Dixit, S., Pandey, A. K., Mandal, S. N., & Bansal, S. (2017). A study of enabling factors affecting construction productivity: Indian scenario. International Journal of Civil Engineering and Technology, 8(6), pp. 741–758.
Dixit, S., & Saurabh, K. (2019). Impact of Construction Productivity Attributes Over Construction Project Performance in Indian Construction Projects. Periodica Polytechnica Architecture. doi: 10.3311/PPar.12711.
Dixit, S., & Sharma, K. (2019). Factors Influencing Construction Time Delay on High Rise Projects In India, in Hajdu, M. J. S.; Miklos (ed.) Creative Construction Conference 2019. Budapest University of Technology and Economics & Diamond Congress Ltd., pp. 341–346. doi: https://doi.org/10.3311/CCC2019-047.
Doloi, H. (2008). Application of AHP in improving construction productivity from a management perspective. ConstructionManagement and Economics, 26(8), pp. 839–852. doi: 10.1080/01446190802244789.
El-Gohary, K. M., Aziz, R. F., & Abdel-Khalek, H. A. (2017). Engineering approach using ANN to improve and predict construction labor productivity under different influences. Journal of Construction Engineering and Management, 143(8), p. 04017045. doi: 10.1061/(ASCE)CO.1943-7862.0001340.
Hajdu, M. (2015). History and some latest developments of precedence diagramming method. Organization, Technology & Management in Construction: An International Journal, 7(2), pp. 1302–1314. doi: 10.5592/otmcj.2015.2.5.
Isaac, S., & Hajdu, M. (2016). The possibilities for better project tracking based on the new developments of the precedence diagramming method. Procedia Engineering, 164(June), pp. 75–81. doi: 10.1016/j.proeng.2016.11.594.
Jarkas, A. M. (2015). Factors influencing labour productivity in Bahrain's construction industry, International Journal of Construction Management, 15(1), pp. 94–108. doi: 10.1080/15623599.2015.1012143.
Jarkas, A. M., & Horner, R. M. W. (2015). Creating a baseline for labour productivity of reinforced concrete building construction in Kuwait. Construction Management and Economics, 33(8), pp. 625–639. doi: 10.1080/01446193.2015.1085651.
Jarkas, A. M., Kadri, C. Y., & Younes, J. H. (2012). A survey of factors influencing the productivity of construction operatives in the state of Qatar. International Journal of Construction Management, 12(3), pp. 1–23. doi: 10.1080/15623599.2012.10773192.
Jayasudha, K., & Vidivelli, B. (2016). Analysis of major risks in construction projects. ARPN Journal of Engineering and Applied Sciences, 11(11), pp. 6943–6950.
Kadry, M., Osman, H., & Georgy, M. (2016). Causes of Construction Delays in Countries with High Geopolitical Risks. Journal of Construction Engineering and Management. doi: 10.1061/(asce)co.1943-7862.0001222
Kirmani, S. S. (1988). ‘The Construction Industry in Development Issues and Options’, p. 30. Available at: http://www-wds.worldbank.org/servlet/WDSContentServer/IW3P/IB/2003/05/17/000178830_98101902153676/Rendered/PDF/multi0page.pdf.
Kwon, S., Ahn, D., Lee, G., & Park, H.-S. (2014). A modified-AHP method of productivity analysis for deployment of innovative construction tools on construction site. (August), pp. 45–50. doi: 10.6106/JCEPM.2014.4.1.045.
Lee, E.-B., Lee, H., & Ibbs, C. W. (2007). Productivity aspects of urban freeway rehabilitation with accelerated construction. Journal of Construction Engineering and Management, 133(10), pp. 798–806. doi: 10.1061/(ASCE)0733-9364(2007)133:10(798).
Mani, N., Kisi, K. P., Rojas, E. M., & Foster, E. T. (2017). Estimating construction labor productivity frontier: Pilot study. Journal of Construction Engineering and Management, 143(10), p. 04017077. doi: 10.1061/(ASCE)CO.1943-7862.0001390.
McKinsey and Company. (2010). India's urban awakening: Building inclusive cities, sustaining economic growth. McKinsey Quarterly, (April), pp. 1–33. Available at http://www.mckinsey.com/~/media/McKinsey/GlobalThemes/Urbanization/UrbanawakeninginIndia/MGI_Indias_urban_awakening_full_report.ashx.
Molavi, J., & Barral, D. L. (2016). A construction procurement method to achieve sustainability in modular construction. Procedia Engineering, 145, pp. 1362–1369. doi: 10.1016/j.proeng.2016.04.201.
Moselhi, O., & Khan, Z. (2012). Significance ranking of parameters impacting construction labour productivity. Construction Innovation, 12(3), pp. 272–296. doi: 10.1108/14714171211244541.
Ogunbiyi, O., Goulding, J. S., & Oladapo, A. (2014). An empirical study of the impact of lean construction techniques on sustainable construction in the UK. Construction Innovation, 14(1), pp. 88–107. doi: 10.1108/CI-08-2012-0045.
Panas, A., & Pantouvakis, J.-P. (2015). Efficiency multipliers for construction productivity: A comparative evaluation. Organization, Technology and Management in Construction an International Journal, 7(1), pp. 1186–1196. doi: 10.5592/otmcj.2015.1.3.
Parida, R., & Ray, P. K. (2015). Factors influencing construction ergonomic performance in India. Procedia Manufacturing, 3, pp. 6587–6592. doi: 10.1016/j.promfg.2015.07.284.
Pheng, L. S., Shang, G., & Foong, W. K. (2016). Enhancing construction productivity through organizational learning in the Singapore construction industry. International Journal of Construction Project Management, 8(1), pp. 71–89. Available at https://search.proquest.com/docview/1842450206?accountid=26636%5Cnhttp://link.periodicos.capes.gov.br/sfxlcl41?url_ver=Z39.88-2004&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&genre=article&sid=ProQ:ProQ%3Aengineeringjournals&atitle=ENHANCING+CONSTRUCTION+PRO.
Sapuay, S. E. (2016). Construction waste – Potentials and constraints. Procedia Environmental Sciences, 35, pp. 714–722. doi: 10.1016/j.proenv.2016.07.074.
Sezer, A. A. (2015). Contractor use of productivity and sustainability indicators for building refurbishment. Built Environment Project and Asset Management, 5(2), pp. 141–153. doi: 10.1108/BEPAM-11-2013-0065.
Shah, M. N., Dixit, S., Kumar, R., Jain, R., & Anand, K. (2019). Causes of delays in slum reconstruction projects in India. International Journal of Construction Management, pp. 1–16. doi: 10.1080/15623599.2018.1560546.
Singh, S., Dixit, S., & Varshney, D. (2018). Sustainable construction management in education sector. International Journal of Engineering & Technology, 7(2), pp. 300–304. doi: 10.14419/ijet.v7i2.9565.
Zhai, D., Goodrum, P., Haas, C., & Caldas, C. (2009). Relationship between automation and integration of construction information systems and labor productivity. Journal of Construction Engineering and Management, 135(8), pp. 746–753. doi: 10.1061/(ASCE)CO.1943-7862.0000024.