References
- BIMS-US. (2019). Available et: https://www.nationalbimstandard.org/about on 24 February, 2019.
- Block, K., & Dreier, F. (2003). DAfStb-Heft 541: Das Ermüdungsverhalten von Dübelbefestigungen, Beuth Verlag, Berlin.
- CEN - Comité Européen de Normalisation. (2018). EN 1992 -4. Eurocode 2:2018, Design of concrete structures – Part 4: Design of fastenings for use in concrete. Belgium, CEN, Brussels.
- Cronin, B. (2015). Industry Fears Over Fixings, New Civil Engineer (September 2015). EMAP Publishing Limited, London.
- fib - International Federation for Structural Concrete. (2011). fib Bulletin 58 - Design of anchorages in concrete. 2011, fib - International Federation for Structural Concrete, Lausanne, Switzerland
- Gralla, M., & Lenz, L. (2017). Digitalisierung im Baubetrieb – Building Information Modeling und virtuelle Zwillinge. In: Festschrift für Prof. Motzko, Darmstadt, Germany, 2017, p. 210.
- Grosser, P., Fuchs, W., & Eligehausen, R. (2011). A field study of adhesive anchor installations. Concrete International, 33.1, pp. 57–63.
- Kawahara, S., Doi, H., Shirato, M., Kajifusa, N., & Kutsukake, T. (2014). Investigation of the tunnel ceiling collapse in the Central Expressway in Japan. In: Transportation Research Board 93rd Annual Meeting, Washington DC, 12 January 2014 to 12 January 2014.
- Lenz, L., Gralla, M., Hoepfner, M., Spyridis, P., & Weist, K. C. (2019). BIM approach for automatic decision support: Case study fastening systems in factory adaptation planning, In: European Conference on Computing in Construction, Chania Crete, Greece, 2019.
- NTSB. (2007). Highway Accident Report: Ceiling Collapse in the Interstate 90 Connector Tunnel at Boston, Massachusetts, July 10, 2006 (Highway Accident Report). National Transportation Safety Board, Washington.
- Roylance, D. (2000). Mechanics of Materials – Lecture Notes, Fall 1999. Massachusetts Institute of Technology: MIT OpenCourseWare.
- Scheller, E., & Künzlen, J. (2013). Handbuch der Dübeltechnik, Swiridoff Verlag, Künzelsau.
- Seebauer, D. (2019). Roboterprogrammierung via Drag-and-Drop. Productronic, Hüthig, Heidelberg, pp. 48–49.
- Weist, K. C. (2019). BIM im Bauprozessmanagement – Entwicklung einer Datenbasis für die modellbasierte Ablaufplanung und Kalkulation, Dortmund, Germany, p. 48.
- Wendner, R., Peitner, C., & Spyridis, P. (2013). Life-cycle robustness of fastening technology: A Christian Doppler Laboratory. Sonderheft: Werkstoffe und Konstruktionen -Innovative Ansätze/Beton- und Stahlbetonbau 108(2013), pp. 121–128.