Have a personal or library account? Click to login
Model and data management issues in the integrated assessment of existing building stocks Cover

Model and data management issues in the integrated assessment of existing building stocks

By: Meliha Honic and  Iva Kovacic  
Open Access
|Jun 2020

Figures & Tables

Fig. 1

The life cycle of a building (https://hydronic-flow-control.com/en/page/our-services--building-life-cycle).

Fig. 2

Comparison of the state-of-the-art as-built BIM data processing and SCI_BIM integrated data assessment and modeling method (based on Huber et al., 2011 and Volk et al., 2014).

Fig. 3

Process design.

Fig. 4

Data and process management framework.

Fig. 5

Point cloud of the use case and the surrounding (© C1).

Fig. 6

Panorama of the interior of the use case (© C1).
DOI: https://doi.org/10.2478/otmcj-2020-0011 | Journal eISSN: 1847-6228 | Journal ISSN: 1847-5450
Language: English
Page range: 2148 - 2157
Submitted on: Nov 14, 2019
|
Accepted on: Feb 11, 2020
|
Published on: Jun 22, 2020
Published by: University of Zagreb
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2020 Meliha Honic, Iva Kovacic, published by University of Zagreb
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.