An Analytical Study of Critical Factors Affecting Contractor Efficiency in Construction Projects in Indian Scenario Cover

An Analytical Study of Critical Factors Affecting Contractor Efficiency in Construction Projects in Indian Scenario

Open Access
|Oct 2018

References

  1. Aitken, A., & Paton, R. A. (2017). The ‘t-shaped buyer’: A transactional perspective on supply chain relationships. Journal of Purchasing and Supply Management, 23(4), pp. 280-289. doi: 10.1016/j.pursup.2017.03.001.
  2. Asgari, S., Awwad, R., Kandil, A., & Odeh, I. (2016). Impact of considering need for work and risk on performance of construction contractors: An agent-based approach. Automation in Construction, 65, pp. 9-20. doi: 10.1016/j. autcon.2016.01.004.
  3. Asim, M., Deep, S., & Ahmad, S. A. (2017a). Time impact study of real estate sector construction projects post application of lean principles for delay resolutions. Indian Journal of Science and Technology, 8(82), pp. 89-99.
  4. Asim, M., Deep, S., & Ahmad, S. A. (2017b). Time impact study of real estate sector construction projects post application of lean principles for delay resolutions. International Journal of Civil Engineering and Technology, 8(2), pp. 89-99.
  5. Bai, C., Rezaei, J., & Sarkis, J. (2017). Multicriteria green supplier segmentation. IEEE Transactions on Engineering Management, 64(4), pp. 515-528.10.1109/TEM.2017.2723639
  6. Chang, J.-R. (2015). Performance records system for public construction contractors-application of smooth roads project. Journal of Performance of Constructed Facilities, 30(3), p. 06015004.
  7. Chang, J.-R. (2016). Performance records system for public construction contractors—application of smooth roads project. Journal of Performance of Constructed Facilities, 30(3), doi: 10.1061/(ASCE)CF.1943-5509.0000793.
  8. Chang, J. (2017). The effects of buyer-supplier’s collab­oration on knowledge and product innovation. Industrial Marketing Management, 65, pp. 129-143. doi: 10.1016/j. indmarman.2017.04.003.
  9. Damoah, I. S., & Akwei, C. (2017). Government project failure in Ghana: A multidimensional approach. International Journal of Managing Projects in Business, 10(1), pp. 32-59.10.1108/IJMPB-02-2016-0017
  10. Deep, S., Asim, M., & Ahmad, S. A. (2017a). Earned value based liability calculation algorithm for schedule delays in construction projects. Indian Journal of Science and Technology, 10(15), pp. 1-10.10.17485/ijst/2017/v10i15/110324
  11. Deep, S., Asim, M., & Khan, M. K. (2017b). Review of various delay causing factors and their resolution by application of lean principles in India. Baltic Journal of Real Estate Economics and Construction Management, 5(1), pp. 101-117.10.1515/bjreecm-2017-0008
  12. Deep, S., Jefferies, M., & Gajendran, T. (2017c). Resolving constraints in collaborative procurement through the lens of a portfolio purchasing model: A traditional literature review. Paper presented at the International Symposium on Frontiers of Infrastructure Finance, Indian Institute of Technology, Kharagpur.
  13. Deep, S., Khan, M. B., Ahmad, S., & Saeed, A. (2017d). A study of various factors affecting contractor’s performance in lowest bid award construction projects. International Journal of Civil Engineering and Technology, 8(2), pp. 28-33.
  14. Deep, S., Singh, D., & Ahmad, S. (2017e). A review of contract awards to lowest bidder in Indian construction projects via case based approach. Open Journal of Business and Management, 5(1), pp. 159-168.10.4236/ojbm.2017.51015
  15. Dixit, V., Chaudhuri, A., & Srivastava, R. K. (2017). Procurement scheduling in engineer procure construct projects: A comparison of three fuzzy modelling approaches. International Journal of Construction Management, 18, pp. 1-18. doi: 10.1080/15623599.2017.1314750.
  16. Doğan, S. Z., Çalğici, P. K., Arditi, D., & Günaydin, H. M. (2016). Critical success factors of partnering in the building design process. METU Journal of the Faculty of Architecture, 32(2).10.4305/METU.JFA.2015.2.4
  17. Dražić, J., Peško, I., Mučenski, V., Dejić, A., & Romanovich, M. (2016). Evaluating contractors and offered structural solution. Procedia Engineering, 165, pp. 898-905. doi: 10.1016/j. proeng.2016.11.790.
  18. Elyamany, A., & Abdelrahman, M. (2010). Contractor performance evaluation for the best value of superpave projects. Journal of Construction Engineering and Management, 136(5), pp. 606-614. doi: 10.1061/(ASCE)CO.1943-7862.0000158.
  19. Elzomor, M., & Parrish, K. (2016). Investigating building construction process and developing a performance index. Procedia Engineering, 145, pp. 211-218. doi: 10.1016/j. proeng.2016.04.063.
  20. Erdogan, S. A., Šaparauskas, J., & Turskis, Z. (2017). Decision making in construction management: AHP and expert choice approach. Procedia Engineering, 172, pp. 270-276. doi: 10.1016/j.proeng.2017.02.111.
  21. Eriksson, P. E. (2010). Partnering: What is it, when should it be used, and how should it be implemented? Construction Management and Economics, 28(9), pp. 905-917.10.1080/01446190903536422
  22. Gündüz, M., Nielsen, Y., & Özdemir, M. (2012). Quantification of delay factors using the relative importance index method for construction projects in turkey. Journal of Management in Engineering, 29(2), pp. 133-139.10.1061/(ASCE)ME.1943-5479.0000129
  23. Hatush, Z., & Skitmore, M. (1997). Assessment and evaluation of contractor data against client goals using pert approach. Construction Management & Economics, 15(4), pp. 327-340.10.1080/014461997372881
  24. Heesom, D., Xiao, H., and Proverbs, D.G. (2003). The development of appropriate measurements for the international comparison of contractor performance. Paper presented at the Construction Research Congress. Available at http://ascelibrary.org/doi/ abs/10.1061/40671%282003%291910.1061/40671%282003%2919
  25. Ibironke, O. T., Oladinrin, T. O., Adeniyi, O., & Eboreime, I. V. (2013). Analysis of non-excusable delay factors influencing contractors’ performance in Lagos state, Nigeria. Journal of Construction in Developing Countries, 18(1), pp. 53-72.
  26. Ioannou, P. G., & Leu, S.-S. (1993). Average-bid method- competitive bidding strategy. Journal of Construction Engineering and Management, 119(1), pp. 131-147.10.1061/(ASCE)0733-9364(1993)119:1(131)
  27. Ishii, N., Takano, Y., & Muraki, M. (2014). An order acceptance strategy under limited engineering man-hours for cost estimation in engineering-procurement-construction projects. International Journal of Project Management, 32(3), pp. 519-528.10.1016/j.ijproman.2013.07.009
  28. Israel, G. D. (1992). Determining Sample Size. University of Florida Cooperative Extension Service, Institute of Food and Agriculture Sciences, EDIS Gainesville.
  29. Jaafar, M., Nuruddin, A. R., & Bakar, S. P. S. A. (2016). Managerial capabilities of housing developers: Building the competitive advantage of a firm. International Journal of Construction Management, 16(1), pp. 27-38.10.1080/15623599.2015.1117708
  30. Jekale, W. (2004). Performance for Public Construction Projects in Developing Countries: Federal Road and Educational Building Projects in Ethiopia. Thesis, Norwegian University of Science & Technology.
  31. Khan, A. R., Deep, S., & Asim, M. (2017a). Analysis of maintenance records of construction equipments and their importance in minimizing equipments breakdown during project execution phase to lessen time overrun. International Journal of Civil Engineering and Technology, 8(83), pp. 11-23.
  32. Khan, M. A., Deep, S., Asim, M., & Khan, Z. R. (2017b). Quantization of risks involved in supply of ready mix concrete in construction industry in Indian scenario. International Journal of Civil Engineering and Technology, 8(3), pp. 175-184.
  33. Khan, M. A., Srivastava, S. D., Asim, M., & Khan, Z. R. (2017c). Quantization of risks involved in supply of ready mix concrete in construction industry in Indian scenario. International Journal of Civil Engineering and Technology, 8(3), pp. 175-184.
  34. Kotula, M., Ho, W., Dey, P. K., & Lee, C. K. M. (2015). Strategic sourcing supplier selection misalignment with critical success factors: Findings from multiple case studies in Germany and the United Kingdom. International Journal of Production Economics, 166, pp. 238-247.10.1016/j.ijpe.2014.12.039
  35. Latham, S. M. (1994). Constructing the Team. HM Stationery Office, London.
  36. Lema, M. (2006). Alternative Project Delivery Methods for Public Constructions: Cases in Oromia Region. Addis Ababa University, Addis Ababa.
  37. Leśniak, A. (2015). Reliability assessment of research into contractors’ bidding decisions. Procedia Engineering, 122, pp. 251-257. doi: 10.1016/j.proeng.2015.10.033.
  38. Manu, E., Ankrah, N., Chinyio, E., & Proverbs, D. (2015). Trust influencing factors in main contractor and subcontractor relationships during projects. International Journal of Project Management, 33(7), pp. 1495-1508. doi: 10.1016/j. ijproman.2015.06.006.
  39. Mathivathanan, D., Kannan, D., & Haq, A. N. (2017). Sustainable supply chain management practices in Indian automotive industry: A multi-stakeholder view. Resources, Conservation and Recycling, 128(01), pp. 284-305. doi: 10.1016/j. resconrec.2017.01.003.
  40. Mishra, D., Gunasekaran, A., Papadopoulos, T., & Hazen, B. (2017). Green supply chain performance measures: A review and bibliometric analysis. Sustainable Production and Consumption, 10, pp. 85-99.10.1016/j.spc.2017.01.003
  41. Naoum, S., & Egbu, C. (2015). Critical review of procurement method research in construction journals. Procedia Economics and Finance, 21, pp. 6-13. doi: 10.1016/s2212-5671(15)00144-6.
  42. Ng, S. T., Luu, D. T., Chen, S. E., & Lam, K. C. (2002). Fuzzy membership functions of procurement selection criteria. Construction Management and Economics, 20(3), pp. 285-296. doi: 10.1080/01446190210121288.
  43. Oduro-Owusu, K., Fugar, F., & Manteau, K. (2010). Factors influencing construction worker job satisfaction in the Ghanaian construction industry. Unpublished MSc thesis, KNUST.
  44. Palaneeswaran, E., & Kumaraswamy, M. (2001). Recent advances and proposed improvements in contractor prequalification methodologies. Building and Environment, 36(1), pp. 73-87.10.1016/S0360-1323(99)00069-4
  45. Palaneeswaran, E., & Kumaraswamy, M. M. (2000). Contractor selection for design/build projects. Journal of Construction Engineering and Management, 126(5), pp. 331-339.10.1061/(ASCE)0733-9364(2000)126:5(331)
  46. Safa, M., Shahi, A., Haas, C. T., Fiander-McCann, D., Safa, M., Hipel, K., et al. (2015). Competitive intelligence (CI) for evaluation of construction contractors. Automation in Construction, 59, pp. 149-157. doi: 10.1016/j.autcon.2015.02.009.
  47. Sanderson, M., Allen, P., Gill, R., & Garnett, E. (2018) New models of contracting in the public sector: A review of alliance contracting, prime contracting and outcome‐based contracting literature. Social Policy & Administration, 52, pp. 1060-1083. https://doi.org/10.1111/spol.12322.10.1111/spol.12322
  48. Sarker, B. R., Egbelu, P. J., Liao, T. W., & Yu, J. (2012). Planning and design models for construction industry: A critical survey. Automation in Construction, 22, pp. 123-134.10.1016/j.autcon.2011.09.011
  49. Setiawan, H., Erdogan, B., & Ogunlana, S. O. (2015). Proactiveness of contractors: A study of Indonesia. Procedia Engineering, 125, pp. 60-67. doi: 10.1016/j.proeng.2015.11.010.
  50. Shehu, Z., & Akintoye, A. (2010). Major challenges to the successful implementation and practice of programme management in the construction environment: A critical analysis. International Journal of Project Management, 28(1), pp. 26-39. doi: 10.1016/j.ijproman.2009.02.004.
  51. Sinčić Ćorić, D., Anić, I.-D., Piri Rajh, S., Rajh, E., & Kurnoga, N. (2017). Organizational buying decision approaches in manufacturing industry: Developing measures and typology. Journal of Business & Industrial Marketing, 32(2), pp. 227-237.10.1108/JBIM-10-2014-0214
  52. Singh, M. K., Deep, S., & Banerjee, R. (2017a). Risk management in construction projects as per Indian scenario. International Journal of Civil Engineering and Technology, 8(83), pp. 127-136.
  53. Singh, M. K., Deep, S., & Banerjee, R. (2017b). Risk management in construction projects as per Indian scenario. International Journal of Civil Engineering and Technology, 8(3), pp. 127-136.
  54. Suprapto, M., Bakker, H. L. M., & Mooi, H. G. (2015a). Relational factors in owner-contractor collaboration: The mediating role of teamworking. International Journal of Project Management, 33(6), pp. 1347-1363. doi: 10.1016/j.ijproman.2015.03.015.
  55. Suprapto, M., Bakker, H. L. M., Mooi, H. G., & Moree, W. (2015b). Sorting out the essence of owner-contractor collab­oration in capital project delivery. International Journal of Project Management, 33(3), pp. 664-683. doi: 10.1016/j. ijproman.2014.05.001.
  56. Wahaj, M., Deep, S., Dixit, R. B., & Khan, M. B. (2017a). A study of project success and procurement frameworks in Indian construction industry. International Journal of Civil Engineering and Technology, 8(3), pp. 167-174.
  57. Wahaj, M., Deep, S., Dixit, R. B., & Khan, M. B. (2017b). A study of project success and procurement frameworks in Indian construction industry. International Journal of Civil Engineering and Technology, 8(83), pp. 167-174.
  58. Walker, D. H., Hampson, K., & Peters, R. (2002). Project alliancing vs project partnering: A case study of the Australian national museum project. Supply Chain Management: An International Journal, 7(2), pp. 83-91.10.1108/13598540210425830
  59. Wang, C. M., Xu, B. B., Zhang, S. J., & Chen, Y. Q. (2016). Influence of personality and risk propensity on risk perception of Chinese construction project managers. International Journal of Project Management, 34(7), pp. 1294-1304. doi: 10.1016/j. ijproman.2016.07.004.
  60. Wang, T., Tang, W., Qi, D., Shen, W., & Huang, M. (2015). Enhancing design management by partnering in delivery of international epc projects: Evidence from Chinese construction companies. Journal of Construction Engineering and Management, 142(4), p. 04015099.10.1061/(ASCE)CO.1943-7862.0001082
  61. Winch, G. M. (2000). Institutional reform in British construction: Partnering and private finance. Building Research & Information, 28(2), pp. 141-155.10.1080/096132100369046
  62. Wong, C. H. (2004). Contractor performance prediction model for the United Kingdom construction contractor: Study of logistic regression approach. Journal of Construction Engineering and Management, 130(5), pp. 691-698. doi: 10.1061/(ASCE)0733- 9364(2004)130:5(691).
  63. Xiao, H., & Proverbs, D. (2003). Factors influencing contractor performance: An international investigation. Engineering, Construction and Architectural Management, 10(5), pp. 322-332.10.1108/09699980310502937
  64. Yang, W., Gao, Y., Li, Y., Shen, H., & Zheng, S. (2017). Different roles of control mechanisms in buyer-supplier conflict: An empirical study from China. Industrial Marketing Management, 65, pp. 144-156. doi: 10.1016/j.indmarman.2017.04.002.
DOI: https://doi.org/10.2478/otmcj-2018-0010 | Journal eISSN: 1847-6228 | Journal ISSN: 1847-5450
Language: English
Page range: 1794 - 1802
Submitted on: Mar 31, 2018
Accepted on: Jul 23, 2018
Published on: Oct 30, 2018
Published by: University of Zagreb
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2018 Shumank Deep, Laura Simon, Mohd Asim, Ali Rahimzadeh, Sulala Al-Hamdani, published by University of Zagreb
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.