Have a personal or library account? Click to login
Analysis of Rework Risk Triggers in the Nigerian Construction Industry Cover

References

  1. Abdul-Rahman, I., Memon, A. H., & Abd-Karim, A. T. (2013). Significant factors causing cost overruns in large construction projects in Malaysia. Journal of Applied Sciences, 13(2), pp. 286-293.10.3923/jas.2013.286.293
  2. Adejimi, A. (2005). Poor building maintenance in Nigeria: Are architects free from blame. In: Proceeding at the ENHIR International Conference on Housing: New Challenges and Innovations in Tomorrow’s Cities in Iceland, pp. 1-16. Available at https://borg.hi.is/enhr2005iceland/ppr/Adejimi.pdf on 06 June, 2017.
  3. Ahadzie, D. K., Proverbs, D. G., & Olomolaiye, P. O. (2008). Critical success criteria for mass house building projects in developing countries. International Journal of Project Management, 26, pp. 675-687.10.1016/j.ijproman.2007.09.006
  4. Ajayi, O., & Oyeyipo, O. (2015). Effect of rework on project performance in building project in Nigeria. International Journal of Engineering Research & Technology (IJERT), 4(02), pp. 294-300.
  5. Alreck, P. L., & Settle, R. B. (1985). The Survey Research Handbook. Richard D. Irwin, Inc, Homewood, Ill.
  6. Anil, A., & Danielraj, R. C. (2016). Analyze the causes and minimize the occurrence of rework in construction project. International Journal of Innovative Research in Science, Engineering & Technology, 5(4), pp. 6464-6467.
  7. Binyam, L., Emer, T. Q., & Yolente, C. M. (2016). Evaluation on the performance of lowest responsive bid contract and the quality of materials used on governmental building projects in Jimma town. International Journal of Scientific & Engineering Research, 7(12), pp. 60-73.
  8. Cheng, C. W. M., & Liu, A. M. M. (2007). The relationship of organizational culture and the implementation of total quality management in construction firms. Surveying and Built Environment, 18(1), pp. 7-16.
  9. Chindo, P. G., & Adogbo, K. J. (2011). Investigation into the use of total quality management in Nigerian construction industry: A case study of large and medium size firms. In: Laryea, S., Leiringer, R., & Hughes, W. (eds.), Proceedings of the West Africa Built Environment Research (WABER) Conference, Accra, Ghana, 19-21 July 2011, pp. 683-690.
  10. Clough, R., Sears, G., & Sears, S. (2005). “Construction Contracting, Seventh Edition”, A Practical Guide to Company Management.
  11. Costello, A. B., & Jason, O. (2005). Best practices in exploratory factor analysis: Four recommendations for getting the most from your analysis. Practical Assessment Research & Evaluation, 10(7). Available online: http://pareonline.net/getvn.asp?v=10&n=7.
  12. Cusack, D. (1992). Implementation of ISO 9000 in construction. In: ISO 9000 Forum Symposium, the International Group for Lean Construction, Gold Coast, Australia, pp. 157-167.
  13. Dalty, C. D., & Crawshaw, D. T. (1973). “Working Drawings in Use”, Building Research Establishment, Current Paper CP 18/73, Watford, UK.
  14. Davis, K., Ledbetter, W. B., & Buratti, J. L. (1989). Measuring design and construction quality costs. ASCE Journal of Construction Engineering and Management, 115(3), pp. 389-400.10.1061/(ASCE)0733-9364(1989)115:3(385)
  15. Enshassi, A., Sundermeier, M., & Zeiter, M. A. (2017). Factors contributing to rework and their impact on construction projects performance. International Journal of Sustainable Construction Engineering & Technology, 8(1), pp. 12-33.
  16. Fellows, R. R., & Liu, A. (2008). ). Research Methods for Construction, 3rd edn. Wiley-Blackwell Science, London.
  17. Hair, J. F., Anderson, R. E., Tathan, R. L., & Black, W. C. (1998). Multivariate Data Analysis, 5th edn. Prentice Hall, Upper Saddle River, NJ.
  18. Harrington, J., Voehl, F., & Wiggin, H. (2012). Applying TQM to the construction industry. The TQM Journal, 24(4), pp. 352-362. https://doi.org/10.1108/17542731211247373.10.1108/17542731211247373
  19. Hwang, B. G., Thomas, S. R., Haas, C. T., & Caldas, C. H. (2009). Measuring the impact of rework on construction cost performance. Journal of Construction Engineering and Management, 135(3), pp. 187-198.10.1061/(ASCE)0733-9364(2009)135:3(187)
  20. Josephson, P., Larsson, B., & Li, H. (2002). Illustrative benchmarking rework and rework costs in Swedish construction industry. Journal of Management Engineering, 18(2), pp. 76-83.10.1061/(ASCE)0742-597X(2002)18:2(76)
  21. Khan, H. J. (2003). Impact of total quality management on productivity. The TQM Magazine, 15(6), pp. 374-380.10.1108/09544780310502705
  22. Koskela, L. (1992). Application of the new production philosophy to construction. In: Technical Report #72, Centre for Integrated Facility Engineering, Department of Civil Engineering, Stanford University. (1993). Lean Production in Construction. In the 10th International Symposium on Automation and Robotics in Construction (ISARC), Elsevier, USA, pp. 47-54.10.22260/ISARC1993/0007
  23. Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and Psychological Measurement, 30, pp. 607-610.10.1177/001316447003000308
  24. Love, P. E. D. (2002). “Influence of project type and procurement method of rework costs in building construction projects. Journal of Construction Engineering and Management, 128(1), pp. 1-29.10.1061/(ASCE)0733-9364(2002)128:1(18)
  25. Love, P. E. D., Davis, P. R., Ellis, J. M., & Cheung, S. O. (2010). Dispute causation: Identification of pathogenic influences. Engineering, Construction and Architectural Management, 17(4), pp. 404-423.10.1108/09699981011056592
  26. Love, P., & Edwards, D. (2004). “Determinants of rework in building construction projects. Engineering, Construction and Architectural Management, 11(4), pp. 259-274.10.1108/09699980410547612
  27. Love, P. E., Edwards, D. F., & Sohal, A. (2004). Total quality management in Australian contracting organization: Pre-conditions for successful implementation. Engineering, Construction and Architectural Management, 11(3), pp. 189-198.10.1108/09699980410535796
  28. Love, P. E. D., Holt, G. D., Shen, L. Y., Li, H., & Irani, Z. (2002). Using systems dynamics to better understand change and rework in construction project, management systems. International Journal of Project Management, 20(6), pp. 425-436.10.1016/S0263-7863(01)00039-4
  29. Love, P. E. D., Mandal, P., & Li, H. (1999). Determining the causal structure of rework in construction projects. Construction Management and Economics, 17(4), pp. 505-517.10.1080/014461999371420
  30. Love, P., Mandal, P., Smith, J., & Georgiou, J. (2000). “DECOEM: A design and construction rework minimization model. In: 1st International Conference on Systems Thinking in Management, Geelong.
  31. Love, P. E. D., & Smith, J. (2003). Benchmarking, bench-action and bench-learning: Rework mitigation in projects. ASCE Journal of Management in Engineering, 19(4), pp. 147-159.10.1061/(ASCE)0742-597X(2003)19:4(147)
  32. Love, P. E., & Sohal, A. S. (2003). Capturing rework costs in projects. Managerial Auditing Journal, 18(4), pp. 329-339.10.1108/02686900310474343
  33. Low, S. P., & Peh, K. W. (1996). A framework for implementing total quality management in construction. The TQM Magazine, 8(5), pp. 39-46.10.1108/09544789610146033
  34. Low, S. P., & Teo, J. A. (2004). Implementing total quality management in construction firms. Journal of Management in Engineering, 20(1), pp. 8-15.10.1061/(ASCE)0742-597X(2004)20:1(8)
  35. Mahamid, I. (2016). Analysis of rework in residential building projects in Palestine. Jordan Journal of Civil Engineering, 10(2), pp. 197-208.10.14525/JJCE.10.1.3536
  36. Mastenbroek, Y. C. (2010). Reducing rework costs in construction projects. Published Bsc thesis, University of Twente, San Pedro Sula, Honduras. Available at http://purl.utwente.nl/essays/59691 on 10 July, 2017.
  37. McIntyre, C., & Kirschenman, M. (2000). Survey of total quality management in construction industry in upper Midwest. Journal of Management in Engineering, 16(5), pp. 67-70.10.1061/(ASCE)0742-597X(2000)16:5(67)
  38. Meshksar, S. (2012). Cost and time impacts of reworks in building a reinforced concrete structure. Master thesis, North Cyprus, Gazimagusa: Eastern Mediterranean University. Available at http://hdl.handle.net/11129/290 on 7 June, 2017.
  39. Mundfrom, D. J., Shaw, D. G., & Ke, T. L. (2005). Minimum sample size recommendations for conducting factor analyses. International Journal of Testing, 5(2), pp. 159-168.10.1207/s15327574ijt0502_4
  40. Oyewobi, L. O., & Ogunsemi, D. R. (2010). Factors influencing rework occurrence in construction: A study of selected building projects in Nigeria. Journal of Building Performance, 1(1), pp. 1-20.
  41. Palaneeswaran, E. (2006). Reducing rework to enhance project performance levels. In: Proceedings of the One Day Seminar on “Recent Developments in Project Management in Hong Kong.
  42. Pallant, J. (2007). SPSS Survival Manual: A Step-By-Step Guide to Data Analysis Using SPSS” Version 15, 3rd edn. Open university Press, England.
  43. Peter, H., Pascale, C., & Todd, L. (2010). Barriers and benefits of quality management in the construction industry: An empirical study. Total Quality Management., 21(9), pp. 953-969.10.1080/14783363.2010.487673
  44. Preacher, K. J., & MacCallum, R. C. (2002). Exploratory factor analysis in behaviour genetics research: Factor recovery with small sample sizes. Behaviour Genetics, 32, pp. 153-161.10.1023/A:1015210025234
  45. Rounce, G. (1998). Quality, waste, and cost consideration in architectural building design management. International Journal of Project Management, 16(2), pp. 123-127.10.1016/S0263-7863(97)00042-2
  46. Saidu, I., & Shakantu, W. M. (2016b). The contributions of material waste to project-cost overrun in Abuja, Nigeria. Acta Structilia, 23(1), pp. 99-113.10.18820/24150487/as23i1.4
  47. Saidu, I., & Shakantu, W. M. W. (2016a). “A study of the relationship between material waste and cost overruns in the construction industry. In: Windapo, A. O. (ed.), The 9th CIDB Postgraduate Conference Cape Town, South Africa. Emerging Trends in Construction Organizational Practices and Project-Management Knowledge Area. 2-4 February, 2016, pp. 124-134
  48. Simpeh, E. K. (2012). An analysis of the causes and impact of rework in construction projects. A Thesis submitted Cape Peninsula University of Technology, South Africa. Available at http://hdl.handle.net/11189/1054 on 10 December, 2016.
  49. Spacey, J. (2016). What is a risk trigger? Available at http://simplicable.com/new/risk-trigger on 8 March, 2017.
  50. Spector, P. (1992). Summated Rating Scale Construction: An Introduction. Sage Publications, Newbury Park, CA.10.4135/9781412986038
  51. Tabachnick, B. G., & Fidell, L. S. (2007). Using Multivariate Statistics, 5th edn. Pearson Education Inc, Boston, MA.
  52. Wasfy, M. A. F. (2010). Severity and impact of rework, a case study of a residential commercial tower project in the Eastern Province-KSA. Master thesis. Dhahran, Saudi Arabia: King Fahd University of Petroleum & Minerals.
  53. Yong, G., & Pearce, S. (2013). A beginner’s guide to factor analysis: Focusing on exploratory factors analysis. Tutorials in Quantitative Methods for Psychology, 9(2), pp. 79-94.10.20982/tqmp.09.2.p079
  54. Zhao, N. (2008). The minimum sample size in factor analysis. Retrieved from: https://www.encorewiki.org/plugins/servlet/mobile#content/view/25657 on 15 December, 2016.
DOI: https://doi.org/10.2478/otmcj-2018-0008 | Journal eISSN: 1847-6228 | Journal ISSN: 1847-5450
Language: English
Page range: 1778 - 1793
Submitted on: Feb 19, 2018
Accepted on: Jun 14, 2018
Published on: Aug 25, 2018
Published by: University of Zagreb
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2018 Emmanuel Chidiebere Eze, John Ebhohimen Idiake, Bashir Olanrewaju Ganiyu, published by University of Zagreb
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.