Have a personal or library account? Click to login

Identification and evaluation of criteria for selecting contractors using a risk management approach

Open Access
|Aug 2018

References

  1. Alhazmi, T., & McCaffer, R. (2000). Project procurement system selection model. Journal of Construction Engineering and Management, 126(3), pp. 176-184.10.1061/(ASCE)0733-9364(2000)126:3(176)
  2. Anagnostopoulos, K., & Vavatsikos, A. (2006). “An AHP model for construction contractor prequalification, operational research”. An International Journal, 6, pp. 333-346.10.1007/BF02941261
  3. Asgharizadeh, E., & Nasrollahi, M. (2009). Identification and selection of weight of factors affecting contractor selection in construction projects. Journal of Management Research, winter 2009(2), pp. 105-122.
  4. Fong, P. S., & Choi, S. (2000). Final contractor selection using the analytical hierarchy process. Construction Management and Economics, 18, pp. 547-577.10.1080/014461900407356
  5. Haghighi Fard, A. (2010), Selection of machinery in surface mines using analytic hierarchy process. Master thesis, Amirkabir University of Technology, Tehran, Iran
  6. Holt, G. D. (2010). Classifying construction contractors. Building Research and Information, 25(6), pp. 374-382.10.1080/096132197370200
  7. Huang, X. (2011). An analysis of the selection of project contractor in the construction management process. International Journal of Business and Management, 6(3), pp. 184-189.10.5539/ijbm.v6n3p184
  8. Iyer, K. C., & Jha, K. N. (2005). Factors affecting cost performance: evidence from Indian construction projects. International Journal of Project Management, 23(4), pp. 283-295.10.1016/j.ijproman.2004.10.003
  9. Jaselskis, E. J., & Russell, J. S. (1992). Risk analysis approach to selection of contractor evaluation method. Construction Engineering Management, 118(4), pp. 814-821.10.1061/(ASCE)0733-9364(1992)118:4(814)
  10. Laryea, S., & Hughes, W. (2011). Risk and price in the bidding process of contractors. Journal of Construction Management and Engineering, 137(4), pp. 248-258.10.1061/(ASCE)CO.1943-7862.0000293
  11. Ledezema, E. L., & Fernandez, N. Q. (2012). Risk management in the bidding process. Master thesis, KTH Royal Institute of Technology in Stockholm.
  12. Mohagher, A., Kashi, K., & Salami, H. (2012). Selection of contractor for construction projects using a combination of multi-attribute utility theory and Electre method in the base Company. Journal of Industrial Management, summer 2012(8).
  13. Nieto-Morote, A., & Ruz-Vila, F. (2012). A fuzzy multi-criteria decision-making model for construction contractor prequali­fication. Automation in Construction., 25, pp. 8-19.10.1016/j.autcon.2012.04.004
  14. Plenkiewicz, E. (2009). Contractor prequalification model using fuzzy sets. Journal of Civil Engineering and Management, 15(4), pp. 377-385.
  15. Rajae, H., & Hazrati, A. (2007). Fuzzy Saw and Fuzzy Topsis multi-criteria decision-making models for pre-qualification and selection of contractors and comparing the results. In: Project Management proceeding of the 4th International Conference in Tehran, Iran, 2007, pp. 115-132.
  16. Sari, A., & El-Sayegh, S.M. (2007). Factors Affecting the Selection of the Appropriate Construction Management at Risk Contractor. In: Latin American and Caribbean proceeding of the international Conference for Engineering and Technology in Tampico, México, 2007, pp. 5C.1-2 - 5C.1-8.
  17. Sik, P. A., Fong, W., & Choi, K. Y. (2000). Final contractor selection using the analytical hierarchy process. Construction management and economics, 18(5), pp. 547-557.10.1080/014461900407356
  18. Zavadskas, E. K., Turskis, Z., & Antucheviciene, J. (2015). Selecting a contractor by using a novel method for multiple attribute analysis: weighted aggregated sum product assessment with grey values (WASPAS-G). Studies in Informatics and Control, 24(2), pp. 141-150.10.24846/v24i2y201502
DOI: https://doi.org/10.2478/otmcj-2018-0004 | Journal eISSN: 1847-6228 | Journal ISSN: 1847-5450
Language: English
Page range: 1747 - 1760
Submitted on: Oct 18, 2017
Accepted on: Apr 1, 2018
Published on: Aug 1, 2018
Published by: University of Zagreb
In partnership with: Paradigm Publishing Services
Publication frequency: 1 times per year

© 2018 Ehsan Mousakhani, Shirzad Ranjbar, Taha Ashoori, published by University of Zagreb
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.