Alhazmi, T., & McCaffer, R. (2000). Project procurement system selection model. Journal of Construction Engineering and Management, 126(3), pp. 176-184.10.1061/(ASCE)0733-9364(2000)126:3(176)
Anagnostopoulos, K., & Vavatsikos, A. (2006). “An AHP model for construction contractor prequalification, operational research”. An International Journal, 6, pp. 333-346.10.1007/BF02941261
Asgharizadeh, E., & Nasrollahi, M. (2009). Identification and selection of weight of factors affecting contractor selection in construction projects. Journal of Management Research, winter 2009(2), pp. 105-122.
Fong, P. S., & Choi, S. (2000). Final contractor selection using the analytical hierarchy process. Construction Management and Economics, 18, pp. 547-577.10.1080/014461900407356
Haghighi Fard, A. (2010), Selection of machinery in surface mines using analytic hierarchy process. Master thesis, Amirkabir University of Technology, Tehran, Iran
Huang, X. (2011). An analysis of the selection of project contractor in the construction management process. International Journal of Business and Management, 6(3), pp. 184-189.10.5539/ijbm.v6n3p184
Iyer, K. C., & Jha, K. N. (2005). Factors affecting cost performance: evidence from Indian construction projects. International Journal of Project Management, 23(4), pp. 283-295.10.1016/j.ijproman.2004.10.003
Jaselskis, E. J., & Russell, J. S. (1992). Risk analysis approach to selection of contractor evaluation method. Construction Engineering Management, 118(4), pp. 814-821.10.1061/(ASCE)0733-9364(1992)118:4(814)
Laryea, S., & Hughes, W. (2011). Risk and price in the bidding process of contractors. Journal of Construction Management and Engineering, 137(4), pp. 248-258.10.1061/(ASCE)CO.1943-7862.0000293
Mohagher, A., Kashi, K., & Salami, H. (2012). Selection of contractor for construction projects using a combination of multi-attribute utility theory and Electre method in the base Company. Journal of Industrial Management, summer 2012(8).
Nieto-Morote, A., & Ruz-Vila, F. (2012). A fuzzy multi-criteria decision-making model for construction contractor prequalification. Automation in Construction., 25, pp. 8-19.10.1016/j.autcon.2012.04.004
Rajae, H., & Hazrati, A. (2007). Fuzzy Saw and Fuzzy Topsis multi-criteria decision-making models for pre-qualification and selection of contractors and comparing the results. In: Project Management proceeding of the 4th International Conference in Tehran, Iran, 2007, pp. 115-132.
Sari, A., & El-Sayegh, S.M. (2007). Factors Affecting the Selection of the Appropriate Construction Management at Risk Contractor. In: Latin American and Caribbean proceeding of the international Conference for Engineering and Technology in Tampico, México, 2007, pp. 5C.1-2 - 5C.1-8.
Sik, P. A., Fong, W., & Choi, K. Y. (2000). Final contractor selection using the analytical hierarchy process. Construction management and economics, 18(5), pp. 547-557.10.1080/014461900407356
Zavadskas, E. K., Turskis, Z., & Antucheviciene, J. (2015). Selecting a contractor by using a novel method for multiple attribute analysis: weighted aggregated sum product assessment with grey values (WASPAS-G). Studies in Informatics and Control, 24(2), pp. 141-150.10.24846/v24i2y201502