Adenuga, O. A. (2003). Management of Labour-Only Contracts in the Nigerian Construction Industry, Bases of Award and Execution. In: Proceeding of 1st International Conference on Global Construction 2003, University of Lagos, Lagos, 1-4 December, 18.
Aghimien, D. O., & Oke, A. E. (2015). Application of value management to selected construction projects in Nigeria. Developing Country Studies, 5(17), pp. 8-14.
Aghimien, D. O., Awodele, O. A., Adegbembo, T. F., & Olatunji, S. O. (2017). Cost Performance of Educational Buildings in Ondo State, Nigeria. In: Environmental Design and Management International Conference (EDMIC), 22-24 May, Obafemi Awolowo University, Ile-Ife, Nigeria, pp. 298-307.
Akintoye, A. (2000). Analysis of factors influencing project cost estimating practice. Construction Management and Economics, 18, pp. 77-89. 10.1080/014461900370979
Babatunde, S. O., Opawole, A., & Ujadughe, I. C. (2010). An appraisal of project procurement methods in the Nigerian construction industry. Civil Engineering Dimension, 12, pp. 1-7.
Dada, M. O. (2012). “A second look: Stakeholders’ perceptions of some issues in design bid-build procurement practice in Nigeria. Journal of Sustainable Development, 5(1), pp. 55-63. 10.5539/jsd.v5n1p55
Department of Building and Housing. (2012). “Dealing with trades people. Types of contract”. Available on: https://www.consumer.org.nz/articles/types-of-building-contracts.
Fagbenle, O. I., & Amusan, L. M. (2011). Comparative study of the time and cost performance of labour-only subcontractors in the construction industry in South Western Nigeria. Journal of Building Performance, 2(1), pp. 94-105.
Hardy, G. (2013). The pitfalls of labour-only building contracts, ADLS. Available on: https://www.adls.org.nz/for-the-profession/news-and-opinion/2013/4/12/the-pitfalls-of-labour-only-building-contracts/.
Hatush, Z., & Skitmore, R. M. (1997). Evaluating contractor prequalification data: Selection criteria and project success factors. Construction Management and Economics, 15(2), pp. 129-147. 10.1080/01446199700000002
Heckathorn, D. D. (2011). “Comments: Snowballing versus respondent-driven sampling. Sociological Methodology, 41(1), pp. 355-366. 10.1111/j.1467-9531.2011.01244.x325098822228916
Mbachu, J. K., & Olaoye, G. S. (1999). Analysis of major cost overrun factors in building project execution. Nigerian Journal of Construction Management, 2(1), pp. 81-86.
Ogunsanmi, O. (2012). Comparisons of procurement characteristics of traditional and labour-only procurements in housing projects in Nigeria. Civil and Environmental Research, 2(8), pp. 1-10. 10.4314/ejesm.v6i2.9
Ogunsanmi, O. E. (2013). Comparisons of performance of traditional and labour-only procurement in construction projects in Nigeria. DBA Africa Management Review, 3(2), pp. 1-15.
Ogunsanmi, O. E., Iyagba, R. O. A., & Omirin, M. M. (2003). A comparative study of the performance of traditional and labour-only procurement in Nigeria. Journal of the Nigeria Institute of Building, pp. 12-27.
Ogunsemi, D. R. (2015). Value for Money in Construction Projects: The Quantity Surveyor’s Quest. In: 71st Inaugural Lecture delivered by Prof. D. R. Ogunsemi at the 2500 Capacity Auditorium, Federal University of Technology, Akure, Ondo State.
Ogunsemi, D. R., & Jagboro, G. O. (2006). Time-cost model for building projects in Nigeria. Construction Management and Economics, 24, pp. 253-258. 10.1080/01446190500521041
Ogunsemi, D. R., & Saka, N. (2006). The NEPAD Initiative and the Challenge of Efficient Cost Management of Infrastructure Development in Nigeria. In: Paper Presented at the 22nd Biennial Conference of the Nigeria Institute of Quantity Surveyors, Calabar, 22-25 November.
Omoregie, A., & Radford, D. (2006). Infrastructure delays and cost escalation: Causes and effects in Nigeria. In: Proceeding of Sixth International Postgraduate Research Conference, Delft University of Technology and TNO, pp. 79-93.
Pallant, J. (2005). SPSS Survival Manual: A Step by Step Guide to Data Analysis Using SPSS for Windows (Version 12). Allen & Unwin, Crows Nest, NSW, Australia.