Skip to main content
Have a personal or library account? Click to login
Simulation-Based Production Process Improvement Considering the Quality-Cost Trade-Off Cover

Simulation-Based Production Process Improvement Considering the Quality-Cost Trade-Off

By:   
Open Access
|Aug 2026

References

  1. Krynke, M. (2026) A simulation model for optimizing component placement in an assembly process. Production Engineering Archives, Quality and Production Managers Association, Vol. 32 (Issue 1), pp. 21-33. https://doi.org/10.30657/pea.2026.32.3
  2. Reema Al-dalain (2026) Exploring Lean Manufacturing Integration and Performance Evaluation for Process Optimization in the Food Processing Industry. Production Engineering Archives Quality and Production Managers Association, 32, no. 1: 87-95. https://doi.org/10.30657/pea.2026.32.7
  3. Krynke, M. (2023) Analysis of the Impact of Effective Time Management on Workstation Efficiency Using a Multi-Criteria Optimization Approach. Management Systems in Production Engineering, STE Group sp. z o.o. Vol. 31 (Issue 3), pp. 306-311. https://doi.org/10.2478/mspe-2023-0034
  4. Knop, K., Gejdos, P. (2024) Prioritizing Product Quality Problems Using Quality Management Tools. System Safety: Human – Technical Facility – Environment, Quality and Production Managers Association, Vol. 6 (Issue 1), pp. 138-153. https://doi.org/10.2478/czoto-2024-0016
  5. Mishra, S., Maurya, S., Varshney, L. et al. (2026) Optimization of time-cost-quality trade-off problems using advanced Jaya algorithm in construction project scheduling. Asian J Civ Eng 27, pp. 2339-2348. https://doi.org/10.1007/s42107-025-01618-y
  6. Al-Saeedi, H.A.H., Shiker, M.A.K. (2025) Formulating a New Mathematical Model to Solve the Quality-Cost Trade-Off Problem. Mathematical Modelling of Engineering Problems, vol. 12, no. 5, pp. 1799-1811, ISSN 2369-0739, https://doi.org/10.18280/mmep.120534
  7. Monghasemi, S. Nikoo, M.R., Fasaee M.A.K., Adamowski J. (2015) A novel multi criteria decision making model for optimizing time-cost-quality trade-off problems in construction projects. Expert Systems with Applications, vol. 42, no. 6, pp. 3089-3104, ISSN 0957-4174, https://doi.org/10.1016/j.eswa.2014.11.032
  8. Orm, M., Jeunet J. (2018) Time Cost Quality Trade-off Problems: A survey exploring the assessment of quality, Computers and Industrial Engineering, vol. 118, pp. 319-328, ISSN 0360-8352, https://doi.org/10.1016/j.cie.2018.01.012
  9. Ingaldi, M., Ulewicz, R. (2020). Problems with the Implementation of Industry 4.0 in Enterprises from the SME Sector. Sustainability, 12(1), 217. DOI: 10.3390/su12010217.
  10. Ulewicz, R., Czerwińska, K., Siwiec, D., Pacana, A. (2022). Analysis of the systemic approach to the concept of lean manufacturing – results of empirical research. Polish Journal of Management Studies, 25(2), pp. 375-395. https://doi.org/10.17512/pjms.2022.25.2.24
  11. Czerwińska, K., Pacana, A., Ostasz G. 2025, A Model for Sustainable Quality Control Improvement in the Foundry Industry Using Key Performance Indicators, Sustainability Switzerland, vol. 17, no. 4, ISSN 2071-1050, https://doi.org/10.3390/su17041418
  12. Poloczek, R. (2025) Analysis of material flow and resource utilization in production systems with the use of turntables. Production Engineering Archives, Quality and Production Managers Association, Vol. 31 (Issue 1), pp. 137-144. https://doi.org/10.30657/pea.2025.31.13
  13. Fani, V., Antomarioni, S., Bandinelli, R., Bevilacqua, M. (2023). Data-driven decision support tool for production planning: a framework combining association rules and simulation. Computers in Industry, 144, 103800. DOI: 10.1016/j.compind.2022.103800.
  14. Pawlak, S., Fornalczyk, A. (2025) Analysis of Production Process Performance Using Computer. Management Systems in Production Engineering, STE Group sp. z o.o. Vol. 33 (Issue 3), pp. 414-419. https://doi.org/10.2478/mspe-2025-0040
  15. Pérez, M. et al. (2025) A simulation-based decision support tool for circular manufacturing systems in the automotive industry using electric machines as a remanufacturing case study. International Journal of Production Research, 63(16), pp. 5899-5918. doi: 10.1080/00207543.2025.2464912 .
  16. Wu, G., Yao, L., Yu, S. (2018) Simulation and optimization of production line based on FlexSim. Chinese Control And Decision Conference (CCDC), Shenyang, China, 2018, pp. 3358-3363, doi: 10.1109/CCDC.2018.8407704.
  17. Krynke, M. (2023) Optimizing Supply Chain in a Foundry Through Computer Simulation Using Flexsim – A Case Study. System Safety: Human – Technical Facility – Environment, Quality and Production Managers Association, Vol. 5 (Issue 1), pp. 172-181. https://doi.org/10.2478/czoto-2023-0019
  18. Beaverstock, M., Greenwood, A., & Nordgren, W. (2017). Applied simulation: modeling and analysis using FlexSim (5th ed.). Published by FlexSim Software Products, Inc., Canyon Park Technology Center, Building A Suite 2300, Orem, UT 84097 USA.
  19. Jurczyk, K.A. (2022). FlexSim. Podręcznik użytkownika [FlexSim. User Manual]. Kraków: InterMarium sp. z o.o.
  20. Ingaldi, M. (2020). A new approach to quality management: conceptual matrix of service attributes. Polish Journal of Management Studies, 22(2), pp. 187-200. https://doi.org/10.17512/pjms.2020.22.2.13
  21. Radek, N., Szczotok, A., Gądek-Moszczak, A., Dwornicka, R., Bronček, J., Pietraszek, J. (2018). The Impact of Laser Processing Parameters on the Properties of Electro-Spark Deposited Coatings. Archives of Metallurgy and Materials, 63(2), pp. 809-816. DOI: 10.24425/122407
  22. Krynke, M. (2024) Virtual Simulation Modeling as a Key Element of Warehouse Location Optimization Strategy. Management Systems in Production Engineering, STE Group sp. z o.o. Vol. 32 (Issue 3), pp. 339-344. https://doi.org/10.2478/mspe-2024-0032
  23. Prabhu, A. et al. (2025) Workload control in a bottleneck-oriented flow shop with capacity adjustments. Production Engineering Archives, Quality and Production Managers Association, Vol. 31 (Issue 4), pp. 455-465. https://doi.org/10.30657/pea.2025.31.42
  24. Negahban, A., Smith, J.S. (2014) Simulation for manufacturing system design and operation: Literature review and analysis. Journal of Manufacturing Systems, vol. 33, no. 2, pp. 241-261. https://doi.org/10.1016/j.jmsy.2013.12.007
  25. Jahangirian, M., Eldabi, T., Naseer, A., Stergioulas, L.K., Young, T. (2010) Simulation in manufacturing and business: A review. European Journal of Operational Research, vol. 203, no. 1, pp. 1-13. https://doi.org/10.1016/j.ejor.2009.06.004
  26. Jagusiak-Kocik, M. (2025) Using AI in Risk Analysis – Case Study. System Safety: Human – Technical Facility – Environment, Quality and Production Managers Association, Vol. 7 (Issue 1), pp. 385-395. https://doi.org/10.2478/czoto-2025-0036
  27. Knop, K. (2022) Using Six Sigma DMAIC Cycle to Improve Workplace Safety in the Company from Automotive Branch: A Case Study. Manufacturing Technology, 22(3), 297-306. https://doi.org/10.21062/mft.2022.040
  28. Krynke, M. (2025) Computer Simulation of Multi-Station Work Organization as a Tool Supporting Risk and Cost Management. System Safety: Human – Technical Facility – Environment, Quality and Production Managers Association, Vol. 7 (Issue 1), pp. 511-521. https://doi.org/10.2478/czoto-2025-0047
  29. Pietraszek, J., Gądek-Moszczak, A., Toruński, T. (2014) Modeling of errors counting system for PCB soldered in the wave soldering technology. Advanced Materials Research, vol. 874, pp. 139-143. https://doi.org/10.4028/www.scientific.net/AMR.874.139
DOI: https://doi.org/10.2478/mspe-2026-0042 | Journal eISSN: 2450-5781 | Journal ISSN: 2299-0461
Language: English
Page range: 493 - 501
Submitted on: May 1, 2026
Accepted on: Jul 1, 2026
Published on: Aug 6, 2026
Published by: STE Group sp. z.o.o.
In partnership with: Paradigm Publishing Services

© 2026 Marek Krynke, published by STE Group sp. z.o.o.
This work is licensed under the Creative Commons Attribution-NonCommercial 4.0 License.