References
- C.E. Betterton & S.J. Silver, “Detecting bottlenecks in serial production lines - A focus on interdeparture time variance,” Int J Prod Res, vol. 50, no. 15, pp. 4158–4174, Aug. 2012, doi: 10.1080/00207543.2011.596847.
- L.D. Fredendall, D. Ojha, J. Wayne Patterson, “Concerning the theory of workload control,” Eur J Oper Res, vol. 201, no. 1, pp. 99–111, Feb. 2010, doi: 10.1016/j.ejor.2009.02.003.
- N.O. Fernandes, M. Thürer, T.M. Pinho, P. Torres, and S. Carmo-Silva, “Workload control and optimised order release: an assessment by simulation,” Int J Prod Res, vol. 58, no. 10, pp. 3180–3193, May 2020, doi: 10.1080/00207543.2019.1630769.
- M. Thürer, M. Stevenson, & P. Renna, “Workload control in dual-resource constrained high-variety shops: an assessment by simulation,” Int J Prod Res, vol. 57, no. 3, pp. 931–947, Feb. 2019, doi: 10.1080/00207543.2018.1497313.
- T. Hutter, S. Haeussler, & H. Missbauer, “Successful implementation of an order release mechanism based on work-load control: a case study of a make-to-stock manufacturer,” Int J Prod Res, vol. 56, no. 4, pp. 1565–1580, Feb. 2018, doi: 10.1080/00207543.2017.1369598.
- C. Silva, M. Stevenson, & M. Thürer, “A case study of the successful implementation of workload control: A practitioner-led approach,” Journal of Manufacturing Technology Management, vol. 26, no. 2, pp. 280–296, Mar. 2015, doi: 10.1108/JMTM-10-2013-0144.
- N. Nahavandi, “CWIPL II, a mechanism for improving throughput and lead time in unbalanced flow line,” Int J Prod Res, vol. 47, no. 11, pp. 2921–2941, Jan. 2009, doi: 10.1080/00207540701725059.
- N.O. Fernandes, C. Silva, & S. Carmo-Silva, “Order release in the hybrid MTO-FTO production,” Int J Prod Econ, vol. 170, pp. 513–520, Dec. 2015, doi: 10.1016/j.ijpe.2015.03.025.
- N.O. Fernandes & S. Carmo-Silva, “Order release in a work-load controlled flow-shop with sequence-dependent set-up times,” Int J Prod Res, vol. 49, no. 8, pp. 2443–2454, Apr. 2011, doi: 10.1080/00207541003720376.
- N.O. Fernandes & S. Carmo-Silva, “Workload control under continuous order release,” Int J Prod Econ, vol. 131, no. 1, pp. 257–262, May 2011, doi: 10.1016/j.ijpe.2010.09.026.
- M. Thürer, M.J. Land, M. Stevenson, & L.D. Fredendall, “On the integration of due date setting and order release control,” Production Planning and Control, vol. 28, no. 5, pp. 420–430, Apr. 2017, doi: 10.1080/09537287.2017.1302102.
- M. Thürer, M. Stevenson, M.J. Land, & L.D. Fredendall, “On the combined effect of due date setting, order release, and output control: an assessment by simulation,” Int J Prod Res, vol. 57, no. 6, pp. 1741–1755, Mar. 2019, doi: 10.1080/00207543.2018.1504250.
- R. Singh & M. Mathirajan, “Experimental investigation for performance assessment of scheduling policies in semiconductor wafer fabrication – a simulation approach,” International Journal of Advanced Manufacturing Technology, vol. 99, no. 5–8, pp. 1503–1520, Nov. 2018, doi: 10.1007/s00170-018-2414-y.
- M. Thürer & M. Stevenson, “Bottleneck-oriented order release with shifting bottlenecks: An assessment by simulation,” Int J Prod Econ, vol. 197, pp. 275–282, Mar. 2018, doi: 10.1016/j.ijpe.2018.01.010.
- S. Kim, K. Roscoe Davis, & J.F. Cox, “An investigation of out-put flow control, bottleneck flow control and dynamic flow control mechanisms in various simple lines scenarios,” Production Planning and Control, vol. 14, no. 1, pp. 15–32, Jan. 2003, doi: 10.1080/0953728021000039416.
- A. Prabhu, K. Raghunandana, & P. Yogesh Pai, “Bottleneck shifting in serial line production: An investigation with different order release methods,” in Materials Today: Proceedings, Elsevier Ltd, 2022, pp. 1714–1720. doi: 10.1016/j.matpr.2021.11.337.
- D. Corti, A. Pozzetti, & M. Zorzini, “A capacity-driven approach to establish reliable due dates in a MTO environment,” Int J Prod Econ, vol. 104, no. 2, pp. 536–554, Dec. 2006, doi: 10.1016/j.ijpe.2005.03.003.
- M. Thürer & M. Stevenson, “The use of finite loading to guide short-term capacity adjustments in make-to-order job shops: an assessment by simulation,” Int J Prod Res, vol. 58, no. 12, pp. 3554–3569, Jun. 2020, doi: 10.1080/00207543.2019.1630771.
- S.N. Kadipasaoglu, W. Xiang, S.F. Hurley, & B.M. Khumawala, “A study on the efffect of the extent and location of protective capacity in flow systems,” Int. J. Production Economics. Vol. 63, 217–228, 2000.
- M. Thürer, M. Stevenson, C. Silva, M.J. Land, L.D. Fredendall, & S.A. Melnyk, “Lean control for make-to-order companies: Integrating customer enquiry management and order release,” Prod Oper Manag, vol. 23, no. 3, pp. 463–476, 2014, doi: 10.1111/poms.12058.
- P.R. Kumar, “Scheduling Manufacturing Systems of Re-En-trant Lines,” in Stochastic Modeling and Analysis of Manufacturing Systems, New York, NY: Springer New York, 1994, pp. 325–360. doi: 10.1007/978-1-4612-2670-3_8.
- M. Thürer & M. Stevenson, “Workload control in job shops with re-entrant flows: an assessment by simulation,” Int J Prod Res, vol. 54, no. 17, pp. 5136–5150, Sep. 2016, doi: 10.1080/00207543.2016.1156182.
- S.C. Graves, H.C. Meal, D. Stefek, & A.H. Zeghmi, “Scheduling of Re-Entrant Flow Shops,” 1983.
- Y. Arzi & D. Raviv, “Dispatching in a workstation belonging to a re-entrant production line under sequence-dependent set-up times,” Production Planning and Control, vol. 9, no. 7, pp. 690–699, Jan. 1998, doi: 10.1080/095372898233696.
- J.W. Fowler, G.L. Hogg, & S.J. Mason, “Workload control in the semiconductor industry,” Production Planning and Control, vol. 13, no. 7, pp. 568–578, Oct. 2002, doi: 10.1080/0953728021000026294.
- S.T. Enns & M.P. Costa, “The effectiveness of input control based on aggreǵate versus bottleneck work loads,” Production Planning and Control, vol. 13, no. 7, pp. 614–624, Oct. 2002, doi: 10.1080/0953728021000026258.
- S. Kim, J.F. Cox, & V.J. Mabin, “An exploratory study of protective inventory in a re-entrant line with protective capacity,” Int J Prod Res, vol. 48, no. 14, pp. 4153–4178, Jan. 2010, doi: 10.1080/00207540902991666.
- P. Neuner & S. Haeussler, “Rule based workload control in semiconductor manufacturing revisited,” Int J Prod Res, vol. 59, no. 19, pp. 5972–5991, 2021, doi: 10.1080/00207543.2020.1797208.
- S. Haeussler, P. Neuner, & M. Thürer, “Balancing earliness and tardiness within workload control order release: an assessment by simulation,” Flex Serv Manuf J, vol. 35, no. 2, pp. 487–508, Jun. 2023, doi: 10.1007/s10696-021-09440-9.
- F. Costa, K. Kundu, M. Rossini, & A. Portioli-Staudacher, “Comparative study of bottleneck-based release models and load-based ones in a hybrid MTO-MTS flow shop: an assessment by simulation,” Operations Management Research, vol. 16, no. 1, pp. 33–48, Mar. 2023, doi: 10.1007/s12063-022-00276-6.
- N.O. Fernandes, M. Thürer, & M. Stevenson, “Direct Workload Control: simplifying continuous order release,” Int J Prod Res, vol. 60, no. 4, pp. 1424–1437, Feb. 2022, doi: 10.1080/00207543.2020.1857451.
- M. Thürer & M. Stevenson, “Order release, dispatching and resource assignment in multiple resource-constrained job shops: an assessment by simulation,” Int J Prod Res, vol. 60, no. 12, pp. 3669–3681, Jun. 2022, doi: 10.1080/00207543.2021.1930240.
- M. Thürer, N.O. Fernandes, S. Haeussler, & M. Stevenson, “Dynamic planned lead times in production planning and control systems: does the lead time syndrome matter?,” Int J Prod Res, vol. 61, no. 4, pp. 1268–1282, Feb. 2023, doi: 10.1080/00207543.2022.2034193.
- P. Bortolotti et al., “A Detailed Wind Turbine Blade Cost Model,” 2019. [Online]. Available: www.nrel.gov/publications.
- R.G. Sargent, “Verification and validation of simulation models,” in Proceedings of the 2010 Winter Simulation Conference, IEEE, Dec. 2010, pp. 166–183. doi: 10.1109/WSC.2010.5679166.
- M. Land & G. Gaalman, “International journal of production economics ELSEVIER Workload control concepts in job shops A critical assessment,” 1996.
- M. Thürer, N.O. Fernandes, M. Stevenson, & T. Qu, “On the backlog-sequencing decision for extending the applicability of ConWIP to high-variety contexts: an assessment by simulation,” Int J Prod Res, vol. 55, no. 16, pp. 4695–4711, Aug. 2017, doi: 10.1080/00207543.2017.1281462.
- M. Thürer, M. Stevenson, & C. Silvaa, “Three decades of workload control research: A systematic review of the literature,” International Journal of Production Research, vol. 49, no. 23. pp. 6905–6935, Dec. 01, 2011. doi: 10.1080/00207543.2010.519000.
- M.L. Spearman, D.L. Woodruff, & W.J. Hopp, “CONWIP: A pull alternative to kanban,” Int J Prod Res, vol. 28, no. 5, pp. 879–894, May 1990, doi: 10.1080/00207549008942761.
- M. Thürer, M. Stevenson, C. Silva, & T. Qu, “Drum-buffer-rope and workload control in High-variety flow and job shops with bottlenecks: An assessment by simulation,” Int J Prod Econ, vol. 188, pp. 116–127, Jun. 2017, doi: 10.1016/j.ijpe.2017.03.025.
- M. Thürer, T. Qu, M. Stevenson, C.D. Li, & G.Q. Huang, “De-constructing bottleneck shiftiness: the impact of bottleneck position on order release control in pure flow shops,” Production Planning and Control, vol. 28, no. 15, pp. 1223–1235, Nov. 2017, doi: 10.1080/09537287.2017.1362486.
- W.G. Gilland, “A simulation study comparing performance of CONWIP and bottleneck-based release rules,” Production Planning and Control, vol. 13, no. 2, pp. 211–219, Mar. 2002, doi: 10.1080/09537280110069784.
- R. Singh & M. Mathirajan, “Investigation of different inputs and a new release policy in the proposed simulation model for wafer fabrication system,” Sādhanā, vol. 44, no. 2, p. 41, Feb. 2019, doi: 10.1007/s12046-018-1006-8.
- M. Thürer & M. Stevenson, “Card-based delivery date promising in pure flow shops with order release control,” Int J Prod Res, vol. 54, no. 22, pp. 6798–6811, Nov. 2016, doi: 10.1080/00207543.2016.1177672.
- C.E. Betterton & J.F. Cox, “Espoused drum-buffer-rope flow control in serial lines: A comparative study of simulation models,” Int J Prod Econ, vol. 117, no. 1, pp. 66–79, Jan. 2009, doi: 10.1016/j.ijpe.2008.08.050