References
- M. Ranjbar, “A path-relinking metaheuristic for the resource levelling problem,” J. Oper. Res. Soc., vol. 64, (7), pp. 1071–1078, 2013.
- J. Blazewicz, J.K. Lenstra and A.H.G.R. Kan, “Scheduling subject to resource constraints: classification and complexity,” Discrete Applied Mathematics, vol. 5, (1), pp. 11–24, 1983.
- S. Hartmann and D. Briskorn, “A survey of variants and extensions of the resource-constrained project scheduling problem,” Eur. J. Oper. Res., vol. 207, (1), pp. 1–14, 2010.
- E. Néron, “Lower bounds for the multi-skill project scheduling problem,” in Proceeding of the Eighth International Workshop on Project Management and Scheduling, 2002, pp. 274–277.
- B. Afshar-Nadjafi, “Multi-skilling in scheduling problems: A review on models, methods and applications,” Comput. Ind. Eng., vol. 151, pp. 107004, 2021.
- C.A. Henao, J.C. Muñoz and J.C. Ferrer, “The impact of multi-skilling on personnel scheduling in the service sector: a retail industry case,” J. Oper. Res. Soc., vol. 66, (12), pp. 1949–1959, 2015.
- M. Ertem, R. As’ad, M. Awad and A. Al-Bar, “Workers-constrained shutdown maintenance scheduling with skills flexibility: Models and solution algorithms,” Comput. Ind. Eng., vol. 172, pp. 108575, 2022.
- P. De Bruecker, J. Van den Bergh, J. Beliën and E. Demeulemeester, “Workforce planning incorporating skills: State of the art,” Eur. J. Oper. Res., vol. 243, (1), pp. 1–16, 2015.
- L. Zhu, J. Lin, Y. Li and Z. Wang, “A decomposition-based multi-objective genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem,” Knowledge-Based Syst., vol. 225, pp. 107099, 2021.
- L. Cui, X. Liu, S. Lu and Z. Jia, “A variable neighborhood search approach for the resource-constrained multi-project collaborative scheduling problem,” Applied Soft Computing, vol. 107, pp. 107480, 2021.
- L. Wang and X. Zheng, “A knowledge-guided multi-objective fruit fly optimization algorithm for the multi-skill resource constrained project scheduling problem,” Swarm and Evolutionary Computation, vol. 38, pp. 54–63, 2018.
- Y. Ren and Z. Lu, “Modeling and optimization of multi-skill resource investment problem considering workload balancing of resources,” in 2017.
- M.E. Skowroński, P.B. Myszkowski, M. Adamski and P. Kwiatek, “Tabu search approach for multi-skill resource-constrained project scheduling problem,” in 2013, pp. 153–158.
- J. Cai, Z. Peng, S. Ding and J. Sun, “Problem-specific multi-objective invasive weed optimization algorithm for reconnaissance mission scheduling problem,” Comput. Ind. Eng., vol. 157, pp. 107345, 2021.
- P.B. Myszkowski, M.E. Skowroński and P. Ł, “Novel heuristic solutions for multi-skill resource-constrained project scheduling problem,” in 2013, pp. 159–166.
- S. Parisa, Z. Sina and K. Reza, “Solving a Multi-Objective Mathematical Model for a Multi-Skilled Project Scheduling Problem by Particle Swarm Optimization and Differential Evolution Algorithms,” Industrial Engineering & Management Systems, vol. 16, pp. 288–306, 2017.
- L. Florez, D. Castro-Lacouture and A.L. Medaglia, “Sustainable workforce scheduling in construction program management,” J. Oper. Res. Soc., vol. 64, (8), pp. 1169–1181, 2013.
- X. Shen, L.L. Minku, N. Marturi, Y. Guo and Y. Han, “A Q-learning-based memetic algorithm for multi-objective dynamic software project scheduling,” Inf. Sci., vol. 428, pp. 1–29, 2018.
- R. Kia, P. Shahnazari-Shahrezaei and S. Zabihi, “Solving a multi-objective mathematical model for a multi-skilled project scheduling problem by CPLEX solver,” in 2016.
- V. Yannibelli and A. Amandi, “Hybridizing a multi-objective simulated annealing algorithm with a multi-objective evolutionary algorithm to solve a multi-objective project scheduling problem,” Expert Syst. Appl., vol. 40, (7), pp. 2421–2434, 2013.
- R. Chen, C. Liang, D. Gu and H. Zhao, “A competence-time-quality scheduling model of multi-skilled staff for IT project portfolio,” Comput. Ind. Eng., vol. 139, pp. 106183, 2020.
- H. Cheng and X. Chu, “Task assignment with multiskilled employees and multiple modes for product development projects,” The International Journal of Advanced Manufacturing Technology, vol. 61, (1–4), pp. 391–403, 2012.
- P. Shahnazari-Shahrezaei, R. Tavakkoli-Moghaddam and H. Kazemipoor, “Solving a new fuzzy multi-objective model for a multi-skilled manpower scheduling problem by particle swarm optimization and elite tabu search,” The International Journal of Advanced Manufacturing Technology, vol. 64, (9–12), pp. 1517–1540, 2013.
- H. Maghsoudlou, B. Afshar-Nadjafi and S.T. Akhavan Niaki, “Multi-skilled project scheduling with level-dependent rework risk; three multi-objective mechanisms based on cuckoo search,” Applied Soft Computing, vol. 54, pp. 46–61, 2017.
- S.C. Vanucci, E.G. Carrano, R. Bicalho and R.H.C. Takahashi, “A modified NSGA-II for the multiobjective multi-mode resource-constrained project scheduling problem,” in 2012.
- M. Arashpour, R. Wakefield, B. Abbasi, M. Arashpour and R. Hosseini, “Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resources,” Architectural Engineering and Design Management, vol. 14, (1–2), pp. 46–59, 2018.
- J. Sun, Z. Peng and J. Cai, “Problem specific genetic differential evolution algorithm for multi-skill resource-constrained project scheduling of collaborative multi-robot systems for search and rescue,” in 2021.
- H. Maghsoudlou, B. Afshar-Nadjafi and S.T.A. Niaki, “A framework for preemptive multi-skilled project scheduling problem with time-of-use energy tariffs,” Energy Systems, vol. 12, (2), pp. 431–458, 2021.
- N. Wongwai and S. Malaikrisanachalee, “Cost-Resource Replacement Trade-off Algorithm for Multi-Skilled Resource Scheduling,” International Journal of Engineering Research and Technology, vol. 13, (2), pp. 212, 2020.
- Y. U. Yining, X. U. Zhe and L. I. U. Dongning, “Distributed multi-project scheduling problem with multi-skilled staff,” Systems Engineering – Theory & Practice, vol. 40, (11), pp. 2921–2933, 2020.
- D. Hedjazi, “Scheduling a maintenance activity under skills constraints to minimize total weighted tardiness and late tasks,” International Journal of Industrial Engineering Computations, vol. 6, (2), pp. 135–144, 2015.
- C. Liu, “A Hybrid Genetic Algorithm to Minimize Total Tardiness for Unrelated Parallel Machine Scheduling with Precedence Constraints,” Mathematical Problems in Engineering, vol. 2013, pp. 1–11, 2013.
- A.H. Hosseinian and V. Baradaran, “A multi-objective multi-agent optimization algorithm for the multi-skill resource-constrained project scheduling problem with transfer times,” RAIRO – Operations Research, vol. 55, (4), pp. 2093–2128, 2021.
- A. Ghamginzadeh, A.A. Najafi and M. Khalilzadeh, “Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem Under Time Uncertainty,” Int. J. Fuzzy Syst., vol. 23, (2), pp. 518–534, 2021.
- G. Campos Ciro, F. Dugardin, F. Yalaoui and R. Kelly, “Open shop scheduling problem with a multi-skills resource constraint: a genetic algorithm and an ant colony optimisation approach,” Int. J. Prod. Res., vol. 54, (16), pp. 4854–4881, 2016.
- I. Correia and F. Saldanha-Da-Gama, “A modeling framework for project staffing and scheduling problems,” in Handbook on Project Management and Scheduling Vol.1. Springer International Publishing, 2015, pp. 547–564.
- C. Montoya, O. Bellenguez-Morineau, E. Pinson and D. Rivreau, “Integrated column generation and lagrangian relaxation approach for the multi-skill project scheduling problem,” in Handbook on Project Management and Scheduling Vol.1. Springer International Publishing, 2015, pp. 565–586.
- H. Li, “Benders decomposition approach for project scheduling with multi-purpose resources,” in Handbook on Project Management and Scheduling Vol.1. Cham: Springer International Publishing, 2014, pp. 587–601.
- Wang Yi-fan, Sun Fu-quan, Liu Shi-xin and Chen Di, “A new method to solve project scheduling problems with multi-skilled workforce constraints,” in May 2013, pp. 2408–2412.
- H. Li and K. Womer, “Scheduling projects with multi-skilled personnel by a hybrid MILP/CP benders decomposition algorithm,” Journal of Scheduling, vol. 12, (3), pp. 281–298, 2009.
- >C. Montoya, O. Bellenguez-Morineau, E. Pinson and D. Rivreau, “Branch-and-price approach for the multi-skill project scheduling problem,” Optim Lett, vol. 8, (5), pp. 1721–1734, 2014.
- O. Bellenguez-Morineau and E. Néron, “Multi-Mode and Multi-Skill project scheduling problem,” in Resource‐ Constrained Project Scheduling. London, UK: ISTE, 2008, pp. 149–160.
- O. Bellenguez-Morineau and E. Néron, “A Branch-and-Bound method for solving Multi-Skill Project Scheduling Problem,” RAIRO-Oper. Res., vol. 41, (2), pp. 155–170, 2007.
- R. Chen, C. Liang, D. Gu and J.Y. Leung, “A multi-objective model for multi-project scheduling and multi-skilled staff assignment for IT product development considering competency evolution,” Int J Prod Res, vol. 55, (21), pp. 6207–6234, Nov 2, 2017.
- Yifei Ren and Zhiqiang Lu, “Modeling and optimization of multi-skill resource investment problem considering workload balancing of resources,” in Aug 2017, pp. 699–704.
- I. Abotaleb, M. Moussa and S. Hussain, “Optimization of Allocating Multi-Skilled Labor Resources Using Genetic Algorithms,” Jan 1, 2014.
- H. Zha and L. Zhang, “Fuzzy flexible resource constrained project scheduling based on genetic algorithm,” Trans. Tianjin Univ, vol. 20, (6), pp. 469–474, 2014.
- E. Attia, K. H. Edi and P. Duquenne, “Flexible resources allocation techniques: characteristics and modelling,” International Journal of Operational Research, vol. 14, (2), pp. 221–254, Jan 1, 2012.
- H. Dai, W. Cheng, W. Yang and Y. Wang, “A general variable neighbourhood search for multi-skill resource-constrained project scheduling problem with step-deterioration,” International Journal of Industrial and Systems Engineering, vol. 34, (2), pp. 145–164, 2020.
- H. Dai and W. Cheng, “A general variable neighborhood search based on path relinking algorithm for multi-skill resource-constrained project scheduling problem with multiple restrictions,” Journal of Physics. Conference Series, vol. 1341, (5), pp. 52006, Oct 1, 2019.
- H. Dai and W. Cheng, “A Memetic Algorithm for Multiskill Resource-Constrained Project Scheduling Problem under Linear Deterioration,” Mathematical Problems in Engineering, vol. 2019, pp. 1–16, Jul 4, 2019.
- Y. Tian, T. Xiong, Z. Liu, P. Deng and L. Wan, “Novel feedback-based operators in solving multi-skill resource-constrained project scheduling problem,” in Aug 2020, pp. 296–301.
- A.H. Hosseinian and V. Baradaran, “P-GWO and MOFA: two new algorithms for the MSRCPSP with the deterioration effect and financial constraints (case study of a gas treating company),” Appl Intell, vol. 50, (7), pp. 2151–2176, 2020.
- H.D. Quoc, L.N. The, C.N. Doan and T.P. Thanh, “New effective differential evolution algorithm for the project scheduling problem,” in Jun 2020, pp. 150–157.
- R. Chen, J. Lu, H. Zhang and L. Xia, “Research on Scheduling Problem of Discrete Manufacturing Workshop for Major Equipment in Complicated Environment,” IOP Conference Series: Materials Science and Engineering, vol. 688, (5), pp. 055048, 2019.
- H. Maghsoudlou, B. Afshar-Nadjafi and S.T.A. Niaki, “Preemptive multi-skilled resource constrained project scheduling problem with hard/soft interval due dates,” RAIRO. Recherche Opérationnelle, vol. 53, (5), pp. 1877–1898, Nov, 2019.
- Y. Ren and Z. Lu, “A flexible resource investment problem based on project splitting for aircraft moving assembly line,” Assem. Autom., vol. 39, (4), pp. 532–547, 2019.
- Y. Ma, Z. He and N. Wang, “Proactive project scheduling optimization based on flexible resource constraint,” in Sep 2019, pp. 1–5.
- T. Felberbauer, W.J. Gutjahr and K.F. Doerner, “Stochastic project management: multiple projects with multi-skilled human resources,” J Sched, vol. 22, (3), pp. 271–288, Jun 15, 2019.
- J. Chen, S. Tong, H. Xie, Y. Nie and J. Zhang, “Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization,” Discrete Dynamics in Nature and Society, vol. 2019, pp. 1–13, Apr 3, 2019.
- O. Polo Mejia, M. Anselmet, C. Artigues and P. Lopez, “A new RCPSP variant for scheduling research activities in a nuclear laboratory,” 47th International Conference on Computers & Industrial Engineering (CIE47), 2017.
- Q. Liu, X. Geng, M. Dong, W. Lv and C. Ye, “Scheduling optimization of design stream line for production research and development projects,” Engineering Optimization, vol. 49, (5), pp. 896–914, 2017.
- A. Dolgui, S. Kovalev, M. Y. Kovalyov, S. Malyutin and A. Soukhal, “Optimal workforce assignment to operations of a paced assembly line,” European Journal of Operational Research, vol. 264, (1), pp. 200–211, Jan 1, 2018.
- H. Maghsoudlou, B. Afshar-Nadjafi and S.T.A. Niaki, “A multi-objective invasive weeds optimization algorithm for solving multi-skill multi-mode resource constrained project scheduling problem,” Computers & Chemical Engineering, vol. 88, pp. 157–169, May 8, 2016.
- D. Joshi, M.L. Mittal and M. Kumar, “Modeling a Bi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem to Minimize Project Makespan and Skill Divergence Span,” 2015.
- L. Zhu, J. Lin and Z. Wang, “A discrete oppositional multi-verse optimization algorithm for multi-skill resource constrained project scheduling problem,” Applied Soft Computing, vol. 85, pp. 105805, Dec, 2019.
- S. Zabihi, M. Rashidi Kahag, H. Maghsoudlou and B. Afshar-Nadjafi, “Multi-objective teaching-learning-based meta-heuristic algorithms to solve multi-skilled project scheduling problem,” Computers & Industrial Engineering, vol. 136, pp. 195–211, Oct, 2019.
- H. Zheng, L. Wang and X. Zheng, “Teaching – learning-based optimization algorithm for multi-skill resource constrained project scheduling problem,” Soft Computing, vol. 21, (6), pp. 1537–1548, 2017.
- J. Lin, L. Zhu and K. Gao, “A genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem,” Expert Systems with Applications, vol. 140, pp. 112915, Feb, 2020.
- Y.F. Ren, Z.Q. Lu, X.Y. Liu and M. Zhang, “Project scheduling problem with hierarchical levels of skills,” Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), vol. 51, (5), pp. 1000–1006, 2017.
- S. Javanmard, B. Afshar-Nadjafi and S.T. Akhavan Niaki, “Preemptive multi-skilled resource investment project scheduling problem: Mathematical modelling and solution approaches,” Computers & Chemical Engineering, vol. 96, pp. 55–68, Jan 4, 2017.
- W.J. Gutjahr and P. Reiter, “Bi-objective project portfolio selection and staff assignment under uncertainty,” Optimization, vol. 59, (3), pp. 417–445, 2010.
- A.H. Hosseinian and V. Baradaran, “A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: a case study in construction industry,” Engineering, Construction and Architectural Management, vol. 30, (1), pp. 321–363, 2023.
- O. Polo-Mejía, C. Artigues, P. Lopez, L. Mönch and V. Basini, “Heuristic and metaheuristic methods for the multi-skill project scheduling problem with partial preemption,” International Transactions in Operational Research, vol. 30, (2), pp. 858–891, Mar, 2023.
- S. Javanmard, B. Afshar-Nadjafi and S. Taghi Akhavan Niaki, “A bi-objective model for scheduling of multiple projects under multi-skilled workforce for distributed load energy usage,” Operational Research, 2021.
- P.B. Myszkowski, M. Laszczyk and D. Kalinowski, “Co-evolutionary algorithm solving multi-skill resource-constrained project scheduling problem,” in Sep 2017, pp. 75–82.
- P. Shahnazari-Shahrezaei, S. Zabihi and R. Kia, “Solving a Multi-Objective Mathematical Model for a Multi-Skilled Project Scheduling Problem by Particle Swarm Optimization and Differential Evolution Algorithms,” Industrial Engineering & Management Systems: An International Journal, vol. 16, (3), pp. 288–306, 2017.
- P.B. Myszkowski, M. Laszczyk and J. Lichodij, “Efficient selection operators in NSGA-II for solving bi-objective multi-skill resource-constrained project scheduling problem,” in Sep 2017, pp. 83–86.
- M.A. Isah and B. Kim, “Integrating Schedule Risk Analysis with Multi-Skilled Resource Scheduling to Improve Resource-Constrained Project Scheduling Problems,” Applied Sciences, vol. 11, (2), pp. 650, Jan 11, 2021.
- S. Liu and C. Wang, “Optimizing linear project scheduling with multi-skilled crews,” Autom. Constr., vol. 24, pp. 16–23, Jul, 2012.
- Liu Xinbao, Lu Shaojun and Jia Zhaoli, “A variable neighbourhood search approach for the resource-constrained multi-project collaborative scheduling problem,” vol. 107, 2021.
- A. Bobek, C. Imondi, T. Shott and M. Toobaei, “Heterogeneous project scheduling for optimal six-sigma cost reduction using linear programing,” in 2012, pp. 2405–2413.
- H.Y. Chiang and B.M.T. Lin, “A Decision Model for Human Resource Allocation in Project Management of Software Development,” IEEE Access, vol. 8, pp. 38073–38081, 2020.
- S. Swangnop and P. Chaovalitwongse, “A Two-Step Tabu Search Heuristic for Multi-period Multi-site Assignment Problem with Joint Requirement of Multiple Resource Types,” Eng. J., vol. 18, (3), pp. 83–98, Jul 10, 2014.
- M.F. Fauske, “Using a genetic algorithm to solve the troops-to-tasks problem in military operations planning,” Journal of Defense Modeling and Simulation, vol. 14, (4), pp. 439–446, Oct, 2017.
- H. Li and K. Womer, “A Decomposition Approach for Shipboard Manpower Scheduling,” Military Operations Research (Alexandria, Va.), vol. 14, (3), pp. 67–90, Jan 1, 2009.
- A. Nasirian, M. Arashpour, B. Abbasi, E.K. Zavadskas and A. Akbarnezhad, “Skill Set Configuration in Prefabricated Construction: Hybrid Optimization and Multicriteria Decision-Making Approach,” J. Constr. Eng. Manage., vol. 145, (9), Sep 1, 2019.
- H. Nie, B. Liu, P. Xie, Z. Liu and H. Yang, “A Cuckoo Search Algorithm for Scheduling Multiskilled Workforce,” Journal of Networks, vol. 9, (5), pp. 1346, May 1, 2014.
- L. Florez, A.L. Medaglia and D. Castro, “Maximizing labor stability as a sustainability performance indicator in project scheduling,” in Construction Research Congress 2012, pp. 465–474.
- >P. Korytkowski and B. Malachowski, “Competence-based estimation of activity duration in IT projects,” Eur. J. Oper. Res., vol. 275, (2), pp. 708–720, Jun 1, 2019.
- R. Celkevicius and R.F.S.M. Russo, “An integrated model for allocation and leveling of human resources in IT projects,” International Journal of Managing Projects in Business, vol. 11, (2), pp. 234–256, 2018.
- Guo Y.-n, J. Ji, J. Ji and Gong D.-w., “Multi-objective software project scheduling optimization method with the learning and forgetting effect,” 2018.
- Y. Li and Z. Xiao, “A Constraint-Based Approach for Multi-Skilled Project Scheduling Problem,” Applied Mechanics and Materials, vol. 681, pp. 265–269, Oct 1, 2014.
- H. Najafzad, H. Davari-Ardakani and R. Nemati-Lafmejani, “Multi-skill project scheduling problem under time-of-use electricity tariffs and shift differential payments,” Energy (Oxf.), vol. 168, pp. 619–636, Feb 1, 2019.
- Polo-mejia Oliver, Artigues Christian and Lopez Pierre, “A Heuristic Method for the Multi-skill Project Scheduling Problem with Partial Preemption,” 2019.
- J. Snauwaert and M. Vanhoucke, “A new algorithm for resource-constrained project scheduling with breadth and depth of skills,” Eur. J. Oper. Res., vol. 292, (1), pp. 43–59, 2021.
- X. Wang, F. A. F. Ferreira and C. Chang, “Multi-objective competency-based approach to project scheduling and staff assignment: Case study of an internal audit project,” Socioecon. Plann. Sci., vol. 81, pp. 101182, Jun, 2022.
- M. Hematian, M.M. Seyyed Esfahani, I. Mahdavi, N. Mahdavi-Amiri and J. Rezaeian, “A multiobjective integrated multiproject scheduling and multiskilled workforce assignment model considering learning effect under uncertainty,” Comput. Intell., vol. 36, (1), pp. 276–296, 2020.
- Joshi Dheeraj, M. L. Mittal and Kumar Manish, “Modeling a Bi-Objective Multi-Skill Resource-Constrained Project Scheduling Problem to Minimize Project Makespan and Skill Divergence Span,” 2020.
- C. Di, Liu Shi-xin and Wang Yi-fan, “Modeling for project scheduling with multi-skilled workforce constraints and uncertainty,” in 2014, pp. 157–160.
- B. Maenhout and M. Vanhoucke, “A resource type analysis of the integrated project scheduling and personnel staffing problem,” Ann Oper Res, vol. 252, (2), pp. 407–433, 2017.
- M. Walter and J. Zimmermann, “Minimizing average project team size given multi-skilled workers with heterogeneous skill levels,” Comput. Oper. Res., vol. 70, pp. 163–179, Jun, 2016.
- J. Chen, J. Zhu and D. Zhang, “Multi-project scheduling problem with human resources based on dynamic programming and staff time coefficient,” in 2014, pp. 1012–1018.
- V. Fernandez-Viagas and J. M. Framinan, “Integrated Project Scheduling and Staff Assignment with Controllable Processing Times,” The Scientific World, vol. 2014, pp. 924120–16, Apr 24, 2014.
- T. Geibinger, F. Mischek and N. Musliu, “Investigating constraint programming for real world industrial test laboratory scheduling,” in Integration of Constraint Programming, Artificial Intelligence, and Operations Research. Springer International Publishing, 2019, pp. 304–319.
- S. Tackenberg and S. Duckwitz, “Actor-oriented optimization model for maintenance tasks,” in 2018.
- M. Arashpour, V. Kamat, Y. Bai, R. Wakefield and B. Abbasi, “Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction,” Autom. Constr., vol. 95, pp. 1–9, 2018.
- M.A. Santos and A.P. Tereso, “On the multi-mode, multi-skill resource constrained project scheduling problem – A software application,” in Advances in Intelligent and Soft Computing. Springer Berlin Heidelberg, 2011, pp. 239–248.
- A. Karam, E. Attia and P. Duquenne, “A MILP model for an integrated project scheduling and multi-skilled workforce allocation with flexible working hours,” IFAC-PapersOnLine, vol. 50, (1), pp. 13964–13969, 2017.
- Y. Ren and Z. Lu, “Integrated optimisation of the flexible resource workload balancing and investment project scheduling problem,” International Journal of Mechatronics and Automation, vol. 6, (2–3), pp. 71–82, 2018.
- M.N.K. Saunders, P. Lewis and A. Thornhill, “Research methods for business students,” 2009.
- B. Fahimnia, J. Sarkis and H. Davarzani, “Green supply chain management: A review and bibliometric analysis,” Int J Prod Econ, vol. 162, pp. 101–114, 2015.
- D. Mishra, A. Gunasekaran, T. Papadopoulos and S. J. Childe, “Big Data and supply chain management: a review and bibliometric analysis,” Annals of Operations Research, vol. 270, (1), pp. 313–336, 2018.
- L.M. Kipper, L.B. Furstenau, D. Hoppe, R. Frozza and S. Iepsen, “Scopus scientific mapping production in industry 4.0 (2011–2018): a bibliometric analysis,” Int J Prod Res, vol. 58, (6), pp. 1605–1627, 2020.
- A. Saihi, M. Ben-Daya and R.A. As’ad, “Maintenance and sustainability: a systematic review of modeling-based literature,” Journal of Quality in Maintenance Engineering, vol. 29, (1), pp. 155–187, 2023.
- J. Borregan-Alvarado, I. Alvarez-Meaza, E. Cilleruelo-Carrasco and G. Garechana-Anacabe, “A Bibliometric Analysis in Industry 4.0 and Advanced Manufacturing: What about the Sustainable Supply Chain?” Sustainability, vol. 12, (19), pp. 7840, 2020.
- O. Persson, R. Danell and J. Schneider, “How to use Bibexcel for various types of bibliometric analysis,” Celebrating Scholarly Communication Studies: A Festschrift for Olle Persson at His 60th Birthday, vol. 5, pp. 9–24, 2009.
- N.J. Van Eck and L. Waltman, “Text mining and visualization using VOSviewer,” arXiv Preprint arXiv:1109.2058, 2011.
- M. Bastian, S. Heymann and M. Jacomy, “Gephi: An open source software for exploring and manipulating networks,” in 2009.
- E.C. Garfield, “Citation Analysis as a Tool in Journal Evaluation,” Science, vol. 178, (4060), pp. 471–479, 1972.
- A.D. Sharplin and R.H. Mabry, “The Relative Importance of Journals Used in Management Research: An Alternative Ranking,” Human Relations, vol. 38, (2), pp. 139–149, 1985.
- M.J. Culnan, “The Intellectual Development of Management Information Systems, 19721982: A Co-Citation Analysis,” Management Science, vol. 32, (2), pp. 156, 1986.
- M. Skowronski and P.B. Myszkowski, Specialized Genetic Operators for Multi-Skill Resource-Constrained Project Scheduling Problem. 2013.
- P.B. Myszkowski, M.E. Skowroński, ŁP. Olech and K. Oślizło, “Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem,” Soft Computing, vol. 19, (12), pp. 3599–3619, 2015.
- O. Bellenguez and E. Néron, “Lower bounds for the multi-skill project scheduling problem with hierarchical levels of skills,” in Practice and Theory of Automated Timetabling. Springer Berlin Heidelberg, 2005, pp. 229–243.
- O. Bellenguez-Morineau and E. Néron, “Multi-Mode and Multi-Skill Project Scheduling Problem,” Resource-Constrained Project Scheduling, pp. 149–160, 2008.
- M. Fırat and C.A.J. Hurkens, “An improved MIP-based approach for a multi-skill workforce scheduling problem,” Journal of Scheduling, vol. 15, (3), pp. 363–380, 2012.
- O. Bellenguez-Morineau, “Methods to solve multi-skill project scheduling problem,” 4or, vol. 6, (1), pp. 85–88, 2008.
- P.B. Myszkowski, M. Skowroński and K. Sikora, “A new benchmark dataset for multi-skill resource-constrained project scheduling problem,” in 2015.
- I. Correia and F. Saldanha-Da-Gama, “The impact of fixed and variable costs in a multi-skill project scheduling problem: An empirical study,” Computers and Industrial Engineering, vol. 72, (1), pp. 230–238, 2014.
- Y. Ding and B. Cronin, “Popular and/or prestigious? Measures of scholarly esteem,” Information Processing & Management, vol. 47, (1), pp. 80–96, 2011.
- Y. Ding, E. Yan, A. Frazho and J. Caverlee, “PageRank for ranking authors in co-citation networks,” J. Am. Soc. Inf. Sci. Technol., vol. 60, (11), pp. 2229–2243, 2009.
- S. Brin and L. Page, “The anatomy of a large-scale hypertextual Web search engine,” Comput. Networks ISDN Syst., vol. 30, (1), pp. 107–117, 1998.
- P. Chen, H. Xie, S. Maslov and S. Redner, “Finding scientific gems with Google’s PageRank algorithm,” Journal of Informetrics, vol. 1, (1), pp. 8–15, 2007.
- B.H. Tabrizi, R. Tavakkoli-Moghaddam and S.F. Ghaderi, “A two-phase method for a multi-skilled project scheduling problem with discounted cash flows,” Sci. Iranica, vol. 21, (3), pp. 1083–1095, 2014.
- V. Tiwari, J.H. Patterson and V.A. Mabert, “Scheduling projects with heterogeneous resources to meet time and quality objectives,” Eur. J. Oper. Res., vol. 193, (3), pp. 780–790, 2009.
- P. Smet, T. Wauters, M. Mihaylov and G. Vanden Berghe, “The shift minimisation personnel task scheduling problem: A new hybrid approach and computational insights,” Omega, vol. 46, pp. 64–73, 2014.
- N. Wongwai and S. Malaikrisanachalee, “Augmented heuristic algorithm for multi-skilled resource scheduling,” Autom. Constr., vol. 20, (4), pp. 429–445, 2011.
- A. Pilkington and C. Liston-Heyes, “Is production and operations management a discipline? A citation/co-citation study,” International Journal of Operations & Production Management, vol. 19, (1), pp. 7–20, 1999.
- H. Small, “Co-Citation in the Scientific Literature: A New Measure of the Relationship Between Two Documents,” Journal of the American Society for Information Science, vol. 24, pp. 265–269, 1973.
- C. Chen, F. Ibekwe-Sanjuan and J. Hou, “The Structure and Dynamics of Co-Citation Clusters: A Multiple-Perspective Co-Citation Analysis,” J. Am. Soc. Inf. Sci. Technol., vol. 61, pp. 1386–1409, 2010.
- L. Leydesdorff, “Bibliometrics/citation networks,” arXiv Preprint arXiv:1502.06378, 2015.
- B. Hjørland, “Citation analysis: A social and dynamic approach to knowledge organization,” Information Processing & Management, vol. 49, (6), pp. 1313–1325, 2013.
- >F. Radicchi, C. Castellano, F. Cecconi, V. Loreto and D. Parisi, “Defining and identifying communities in networks,” Proceedings of the National Academy of Sciences, vol. 101, (9), pp. 2658–2663, 2004.
- A. Clauset, M.E.J. Newman and C. Moore, “Finding community structure in very large networks,” Physical Review E, vol. 70, (6), pp. 066111, 2004.
- V.D. Blondel, J. Guillaume, R. Lambiotte and E. Lefebvre, “Fast unfolding of communities in large networks,” Journal of Statistical Mechanics: Theory and Experiment, vol. 2008, (10), pp. P10008, 2008.
- S. Hartmann and D. Briskorn, “A survey of variants and extensions of the resource-constrained project scheduling problem,” Eur. J. Oper. Res., vol. 207, (1), pp. 1–14, 2010.
- R. Kolisch and R. Padman, “An integrated survey of deterministic project scheduling,” Omega (Oxford), vol. 29, (3), pp. 249-272, Jun 1, 2001.
- C. Heimerl and R. Kolisch, “Scheduling and staffing multiple projects with a multi-skilled workforce,” OR Spectrum, vol. 32, (2), pp. 343–368, 2010.
- J. Alcaraz, C. Maroto and R. Ruiz, “Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms,” The Journal of the Operational Research Society, vol. 54, (6), pp. 614–626, Jun 1, 2003.
- B.F. Almeida, I. Correia and F. Saldanha-da-Gama, “Priority-based heuristics for the multi-skill resource constrained project scheduling problem,” Expert Systems with Applications, vol. 57, pp. 91–103, Sep 15, 2016.
- S. Hartmann and R. Kolisch, “Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem,” Eur. J. Oper. Res., vol. 127, (2), pp. 394–407, 2000.
- W.J. Gutjahr, S. Katzensteiner, P. Reiter, C. Stummer and M. Denk, “Competence-driven project portfolio selection, scheduling and staff assignment,” Central Europ J Oper Res, vol. 16, (3), pp. 281–306, Sep 1, 2008.
- R. Kolisch and S. Hartmann, “Experimental investigation of heuristics for resource-constrained project scheduling: An update,” European Journal of Operational Research, vol. 174, (1), pp. 23–37, Oct 1, 2006.
- S. Shadrokh and F. Kianfar, “A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty,” European Journal of Operational Research, vol. 181, (1), pp. 86–101, Aug 16, 2007.
- R. Kolisch, “Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation,” European Journal of Operational Research, vol. 90, (2), pp. 320–333, Apr 19, 1996.
- P. Brucker, A. Drexl, R. Möhring, K. Neumann and E. Pesch, “Resource-constrained project scheduling: Notation, classification, models, and methods,” Eur. J. Oper. Res., vol. 112, (1), pp. 3–41, 1999.
- D. Golenko-Ginzburg and D. Blokh, “A generalized activity network model,” The Journal of the Operational Research Society, vol. 48, (4), pp. 391–400, Apr 1, 1997.
- V. Yannibelli and A. Amandi, “A knowledge-based evolutionary assistant to software development project scheduling,” Expert Systems with Applications, vol. 38, (7), pp. 8403–8413, Jul 1, 2011.
- E.L. Demeulemeester and W.S. Herroelen, “An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem,” European Journal of Operational Research, vol. 90, (2), pp. 334–348, Apr 19, 1996.
- >R. Heilmann, “Resource – constrained project scheduling: a heuristic for the multi-mode case,” OR Spektrum, vol. 23, (3), pp. 335–357, Aug 1, 2001.
- L. Drezet and J. Billaut, “A project scheduling problem with labour constraints and time-dependent activities requirements,” International Journal of Production Economics, vol. 112, (1), pp. 217–225, Mar 1, 2008.
- A.A.B. Pritsker, L.J. Waiters and P.M. Wolfe, “Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach,” Management Science, vol. 16, (1), pp. 93–108, Sep 1, 1969.
- V. Valls, F. Ballestín and S. Quintanilla, “A hybrid genetic algorithm for the resource-constrained project scheduling problem,” European Journal of Operational Research, vol. 185, (2), pp. 495–508, Mar 1, 2008.
- G. Zhu, J.F. Bard and G. Yu, “A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem,” INFORMS Journal on Computing, vol. 18, (3), pp. 377–390, Jun 22, 2006.
- J.E. Gomar, C.T. Haas and D.P. Morton, “Assignment and Allocation Optimization of Partially Multiskilled Workforce,” Journal of Construction Engineering and Management, vol. 128, (2), pp. 103–109, Mar 1, 2002.
- M. Arashpour, R. Wakefield, N. Blismas and J. Minas, “Optimization of process integration and multi-skilled resource utilization in off-site construction,” Automation in Construction, vol. 50, pp. 72–80, Feb, 2015.
- A. Drexl and A. Kimms, “Optimization guided lower and upper bounds for the resource investment problem,” The Journal of the Operational Research Society, vol. 52, (3), pp. 340–351, Mar 1, 2001.
- G. Taguchi, Introduction to Quality Engineering: Designing Quality into Products and Processes. The Organization, 1986.
- R. Kolisch, A. Sprecher and A. Drexl, “Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems,” Management Science, vol. 41, (10), pp. 1693–1703, Oct 1, 1995.
- K. Hyari, M. El-Mashaleh and A. Kandil, “Optimal Assignment of Multiskilled Labor in Building Construction Projects,” International Journal of Construction Education and Research, vol. 6, (1), pp. 70–80, Mar 5, 2010.
- R.C. Burleson, C.T. Haas, R.L. Tucker and A. Stanley, “Multiskilled Labor Utilization Strategies in Construction,” Journal of Construction Engineering and Management, vol. 124, (6), pp. 480–489, Nov 1, 1998.
- >T. Hegazy, M. Said and M. Kassab, “Incorporating rework into construction schedule analysis,” Automation in Construction, vol. 20, (8), pp. 1051–1059, Dec 1, 2011.
- V. Valls, Á Pérez and S. Quintanilla, “Skilled workforce scheduling in Service Centres,” European Journal of Operational Research, vol. 193, (3), pp. 791–804, Mar 16, 2009.
- V. Jain and I.E. Grossmann, “Algorithms for Hybrid MILP/CP Models for a Class of Optimization Problems,” INFORMS Journal on Computing, vol. 13, (4), pp. 258–276, 2001.
- R. Klein, “Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects,” Eur. J. Oper. Res., vol. 127, (3), pp. 619–638, 2000.
- F.F. Boctor, “Resource-constrained project scheduling by simulated annealing,” International Journal of Production Research, vol. 34, (8), pp. 2335–2351, Aug 1, 1996.
- H. ALwaer and D.J. Clements-Croome, “Key performance indicators (KPIs) and priority setting in using the multi-attribute approach for assessing sustainable intelligent buildings,” Building and Environment, vol. 45, (4), pp. 799–807, Apr 1, 2010.
- K. El-Rayes and O. Moselhi, “Optimizing Resource Utilization for Repetitive Construction Projects,” Journal of Construction Engineering and Management, vol. 127, (1), pp. 18–27, Jan 1, 2001.
- A. Sigrún, A. Hayriye and D.G. Douglas, “Design principles for flexible systems. Production and Operations Management,” 2013.
- J.N. Hooker, “Logic, Optimization, and Constraint Programming,” INFORMS Journal on Computing, vol. 14, (4), pp. 295–321, Sep 22, 2002.
- G. Fernández-Sánchez and F. Rodríguez-López, “A methodology to identify sustainability indicators in construction project management – Application to infrastructure projects in Spain,” Ecological Indicators, vol. 10, (6), pp. 1193–1201, Nov 1, 2010.
- M. Arashpour, M. Shabanikia and M. Arashpour, “Valuing the contribution of knowledge-oriented workers to projects: A merit based approach in the construction industry,” Australasian Journal of Construction Economics and Building, vol. 12, (4), pp. 1–12, Jan 1, 2012.
- P. Jaśkowski and A. Sobotka, “Scheduling Construction Projects Using Evolutionary Algorithm,” Journal of Construction Engineering and Management, vol. 132, (8), pp. 861–870, Aug 1, 2006.