Have a personal or library account? Click to login
The Impact of Selected Lean Manufacturing Tools on the Level of Delays in the Production Process. A Case Study Cover

The Impact of Selected Lean Manufacturing Tools on the Level of Delays in the Production Process. A Case Study

By: Szymon Pawlak  
Open Access
|Feb 2024

References

  1. A.Y. Chang, Y.T. Cheng, „Analysis model of the sustainability development of manufacturing small and mediumsized enterprises in Taiwan.” Journal of Cleaner Production, vol 207(10), pp. 458–473, 2019.
  2. J.M. Rohani, S.M. Zahraee, „Production line analysis via value stream mapping: a lean manufacturing process of color industry.” Procedia Manufacturing, No. 2, pp. 6–10, 2015.
  3. B. Alkan, D.A. Vera, M. Ahmad, M. Ahmad, R. Harrison, “Complexity in manufacturing systems and its measures: a literature review.” European Journal of Industrial Engineering, 12(1), pp. 116–150, 2018.
  4. J.M. Müller, O. Buliga, K. Voigt, “How SMEs approach business model innovations in Industry 4.0”. Technological Forecastingand Social Change, pp. 2–17, 2018.
  5. J.M. Müller, D. Kiel, K.I. Voigt, “What Drives the Implementation of Industry 4.0? The Role of Opportunities and Challenges in the Context of Sustainability”. Sustainability, 10, 1, 2018.
  6. J. Bendkowski, Zmiany w pracy produkcyjnej w perspektywie koncepcji „Przemysł 4.0”. Zeszyt Naukowy Politechniki Śląskiej, pp. 21–33, 2017.
  7. D. Kiel, J.M. Müller, C. Arnold, K. Voigt, “Sustainable Industrial Value Creation: Benefits and Challenges of Industry 4.0”. International Journal of Innovation Management, 21, 8, 2017.
  8. H.S. Birkel, J.W. Veile, J.M. Müller, E. Hartmann, K. Voigt, “Development of a Risk Framework for Industry 4.0 in the Context of Sustainability for Established Manufacturers”. Sustainability, pp. 384, 2019.
  9. U. Dombrowski, T. Richter, P. Krenkel, “Interdependencies of industrie 4.0 & lean production systems: a use cases analysis”. Procedia Manufacturing, pp. 1061–1068, 2017.
  10. T. Wagner, C. Herrmann, S. Thiede, “Industry 4.0 impacts on lean production systems.” Procedia CIRP, 63, pp. 125–131, 2017.
  11. K. Mohan Sharma, S. Lata, “Effectuation of Lean Tool “5S”. Materials and Work Space Efficiency in a Copper Wire Drawing Micro-Scale Industry, Vol. 5, pp. 4678–4683, 2017.
  12. N.A.A. Rahman, S.M. Sharif, M.M. Esa, “Lean Manufacturing Case Study with Kanban System Implementation”. Procedia Economics and Finance, Vol. 7, pp. 174–180, 2013.
  13. N. Nandakumar, P.G. Saleeshya, P. Harikumar, “Bottleneck Identification And Process Improvement By Lean Six Sigma DMAIC Methodology.” Materials Today: Proceedings, No. 24, pp. 1217–1224, 2020.
  14. M. Ghosh, “Lean Manufacturing performance in Indian Manufacturing Plan”. Journal of Manufacturing Tech Management, No. 24, pp. 113–122, 2013.
  15. B.V. Chowdary, D. George, “Improvement of manufacturing operations at a pharmaceutical company”. Journal of Tech Management, No. 23, pp. 6–75, 2013.
  16. H.T.S. Caldera, C. Desha, L. Dawes, “Exploring the role of lean thinking in sustainable business practice” A systematic literature review. J. Clean. Prod., 167, 1546–1565, 2017.
  17. S. Thanki, K. Govindan, J. Thakkar, “An investigation on lean-green implementation practices in Indian SMEs using analytical hierarchy process (AHP) approach.” J. Clean. Prod., 135, pp. 284–298, 2016.
  18. D.M. Nguyen, T.K. Duong, “Enterprises Characteristics and Lean Out-come: An Empirical evidence from Vietnam Manufacturing” Management System in Production Engineering, 2(30), pp. 98–108, 2022.
  19. R.S. Mor, A. Bhardwaj, S. Singh, A. Sachdeva, „Productivity gainsthrough standardization-of-work in a manufacturing company” Journal of Manufacturing Technology Management, 30(6), pp. 899–919, 2019.
  20. Kaizen Institute. Standardization. Global Leader & Pioneer in Kaizen/Lean/Operation Excellence Domain, 2013.
  21. E. Jiménez, A.S. Tejeda, M Pérez, J. Blanco, E. Martínez, „Applicabilityof lean production with VSM to the Rioja wine sector” Int. J. Prod. Res., 50, pp. 1890–1904, 2015.
  22. B.S. Sidhu, V. Kumar, A. Bajaj, „The “5S” strategy by using PDCA cycle for continuous improvement of the manufacturing processes in agriculture industry,” Int. J. Res. Ind. Eng. J. homepage, 2, pp. 10–23, 2013.
  23. S. Pawlak, „Analysis of the impact of selected Lean Manufacturing tools on the parameters of the production process – case study” Zeszyty Naukowe Politechniki Śląskiej. Organizacja i Zarządzanie, pp. 379–391, 2023.
  24. S. Bhasin, P. Burcher, „Lean viewed as a philosophy”, Journal of Manufacturing Technology Management, pp. 56–72, 2016.
  25. S. Singh, A. Agrawal, D. Sharma, V Saini, A. Kumar, S Praveenkumar, „Implementation of Total Productive Maintenance Approach: Improving Overall Equipment Efficiency of a Metal Industry” Inventions, pp. 119, 2022.
  26. S. Pawlak, K. Nowacki, H. Kania, „Analysis of the impact of the 5S tool and standardization on the duration of the production process – case study. Production Engineering Archives, 29, pp. 421–427, 2023
  27. G. Pinto, F.J.G Silva, A. Baptista, O. Nuno, R. Fernandes, C. Casais, R. Samuel, „TPM implementation and maintenance strategic plan – a case study”. Procedia Manufacturing, Vol. 51, pp. 1423–1430, 2020.
  28. R. Singh, A. Ashish, M. Gohil, B. Dhaval, D Shah, „Total Productive Maintenance (TPM) Implementation in a Machine Shop: A Case Study”, Production Engineering, pp. 592–599, 2013.
DOI: https://doi.org/10.2478/mspe-2024-0011 | Journal eISSN: 2450-5781 | Journal ISSN: 2299-0461
Language: English
Page range: 103 - 107
Submitted on: Jul 1, 2023
Accepted on: Jan 1, 2024
Published on: Feb 26, 2024
Published by: STE Group sp. z.o.o.
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2024 Szymon Pawlak, published by STE Group sp. z.o.o.
This work is licensed under the Creative Commons Attribution 4.0 License.