References
- A.Y. Chang, Y.T. Cheng, „Analysis model of the sustainability development of manufacturing small and mediumsized enterprises in Taiwan.” Journal of Cleaner Production, vol 207(10), pp. 458–473, 2019.
- J.M. Rohani, S.M. Zahraee, „Production line analysis via value stream mapping: a lean manufacturing process of color industry.” Procedia Manufacturing, No. 2, pp. 6–10, 2015.
- B. Alkan, D.A. Vera, M. Ahmad, M. Ahmad, R. Harrison, “Complexity in manufacturing systems and its measures: a literature review.” European Journal of Industrial Engineering, 12(1), pp. 116–150, 2018.
- J.M. Müller, O. Buliga, K. Voigt, “How SMEs approach business model innovations in Industry 4.0”. Technological Forecastingand Social Change, pp. 2–17, 2018.
- J.M. Müller, D. Kiel, K.I. Voigt, “What Drives the Implementation of Industry 4.0? The Role of Opportunities and Challenges in the Context of Sustainability”. Sustainability, 10, 1, 2018.
- J. Bendkowski, Zmiany w pracy produkcyjnej w perspektywie koncepcji „Przemysł 4.0”. Zeszyt Naukowy Politechniki Śląskiej, pp. 21–33, 2017.
- D. Kiel, J.M. Müller, C. Arnold, K. Voigt, “Sustainable Industrial Value Creation: Benefits and Challenges of Industry 4.0”. International Journal of Innovation Management, 21, 8, 2017.
- H.S. Birkel, J.W. Veile, J.M. Müller, E. Hartmann, K. Voigt, “Development of a Risk Framework for Industry 4.0 in the Context of Sustainability for Established Manufacturers”. Sustainability, pp. 384, 2019.
- U. Dombrowski, T. Richter, P. Krenkel, “Interdependencies of industrie 4.0 & lean production systems: a use cases analysis”. Procedia Manufacturing, pp. 1061–1068, 2017.
- T. Wagner, C. Herrmann, S. Thiede, “Industry 4.0 impacts on lean production systems.” Procedia CIRP, 63, pp. 125–131, 2017.
- K. Mohan Sharma, S. Lata, “Effectuation of Lean Tool “5S”. Materials and Work Space Efficiency in a Copper Wire Drawing Micro-Scale Industry, Vol. 5, pp. 4678–4683, 2017.
- N.A.A. Rahman, S.M. Sharif, M.M. Esa, “Lean Manufacturing Case Study with Kanban System Implementation”. Procedia Economics and Finance, Vol. 7, pp. 174–180, 2013.
- N. Nandakumar, P.G. Saleeshya, P. Harikumar, “Bottleneck Identification And Process Improvement By Lean Six Sigma DMAIC Methodology.” Materials Today: Proceedings, No. 24, pp. 1217–1224, 2020.
- M. Ghosh, “Lean Manufacturing performance in Indian Manufacturing Plan”. Journal of Manufacturing Tech Management, No. 24, pp. 113–122, 2013.
- B.V. Chowdary, D. George, “Improvement of manufacturing operations at a pharmaceutical company”. Journal of Tech Management, No. 23, pp. 6–75, 2013.
- H.T.S. Caldera, C. Desha, L. Dawes, “Exploring the role of lean thinking in sustainable business practice” A systematic literature review. J. Clean. Prod., 167, 1546–1565, 2017.
- S. Thanki, K. Govindan, J. Thakkar, “An investigation on lean-green implementation practices in Indian SMEs using analytical hierarchy process (AHP) approach.” J. Clean. Prod., 135, pp. 284–298, 2016.
- D.M. Nguyen, T.K. Duong, “Enterprises Characteristics and Lean Out-come: An Empirical evidence from Vietnam Manufacturing” Management System in Production Engineering, 2(30), pp. 98–108, 2022.
- R.S. Mor, A. Bhardwaj, S. Singh, A. Sachdeva, „Productivity gainsthrough standardization-of-work in a manufacturing company” Journal of Manufacturing Technology Management, 30(6), pp. 899–919, 2019.
- Kaizen Institute. Standardization. Global Leader & Pioneer in Kaizen/Lean/Operation Excellence Domain, 2013.
- E. Jiménez, A.S. Tejeda, M Pérez, J. Blanco, E. Martínez, „Applicabilityof lean production with VSM to the Rioja wine sector” Int. J. Prod. Res., 50, pp. 1890–1904, 2015.
- B.S. Sidhu, V. Kumar, A. Bajaj, „The “5S” strategy by using PDCA cycle for continuous improvement of the manufacturing processes in agriculture industry,” Int. J. Res. Ind. Eng. J. homepage, 2, pp. 10–23, 2013.
- S. Pawlak, „Analysis of the impact of selected Lean Manufacturing tools on the parameters of the production process – case study” Zeszyty Naukowe Politechniki Śląskiej. Organizacja i Zarządzanie, pp. 379–391, 2023.
- S. Bhasin, P. Burcher, „Lean viewed as a philosophy”, Journal of Manufacturing Technology Management, pp. 56–72, 2016.
- S. Singh, A. Agrawal, D. Sharma, V Saini, A. Kumar, S Praveenkumar, „Implementation of Total Productive Maintenance Approach: Improving Overall Equipment Efficiency of a Metal Industry” Inventions, pp. 119, 2022.
- S. Pawlak, K. Nowacki, H. Kania, „Analysis of the impact of the 5S tool and standardization on the duration of the production process – case study. Production Engineering Archives, 29, pp. 421–427, 2023
- G. Pinto, F.J.G Silva, A. Baptista, O. Nuno, R. Fernandes, C. Casais, R. Samuel, „TPM implementation and maintenance strategic plan – a case study”. Procedia Manufacturing, Vol. 51, pp. 1423–1430, 2020.
- R. Singh, A. Ashish, M. Gohil, B. Dhaval, D Shah, „Total Productive Maintenance (TPM) Implementation in a Machine Shop: A Case Study”, Production Engineering, pp. 592–599, 2013.