Modified Resource-Constrained Project Scheduling to Minimize Idle Time for Banbury Mixing Process: A Case Study in the Tire Manufacturing Industry Cover

Modified Resource-Constrained Project Scheduling to Minimize Idle Time for Banbury Mixing Process: A Case Study in the Tire Manufacturing Industry

Open Access
|Aug 2023

References

  1. F. Habibi, F. Barzinpour, S.J. Sadjadi, “Resource-constrained project scheduling problem: review of past and recent developments,” Journal of Project Management, vol. 3, pp. 55-88, Jan. 2018.
  2. S.B. Issa, Y. Tu, “A survey in the resource-constrained project and multi-project scheduling problems,” Journal of Project Management, vol. 5, pp. 117-138, Jan. 2020.
  3. M.G. Sánchez, E. Lalla-Ruiz, A.F. Gil, C. Castro, “Resource-constrained multi-project scheduling problem: A survey,” European Journal of Operational Research, vol. 1, pp. 1-19, Sep. 2022.
  4. H.D. Ardakani, A. Dehghani, “Multi-objective optimization of multi–mode resource-constrained project selection and scheduling problem considering resource leveling and time-varying resource usage,” International Journal of Supply and Operations Management, vol. 9, pp. 34-55, Jan. 2022.
  5. U. Satic, P. Jacko, C. Kirkbride, “Performance evaluation of scheduling policies for the dynamic and stochastic resource-constrained multi-project scheduling problem,” International Journal of Production Research, vol. 60, pp. 1411-1423, Jan. 2022.
  6. S. Creemers, “Minimizing the expected makespan of a project with stochastic activity durations under resource constraints,” Journal of Scheduling, vol. 18, pp. 263-273, Mar. 2015.
  7. J.F. Gonçalves, J.J. de Magalhães Mendes, M.G. Resende, “The basic multi-project scheduling problem,” In Handbook on project management and scheduling, 1st ed., vol. 2, Springer, 2015, pp. 667-683.
  8. J. Chen, J. Zhu, D. Zhang, “Multi-project scheduling problem with human resources based on dynamic programming and staff time coefficient,” in International conference on management science & engineering 21th annual conference proceedings, 2014, pp. 1012-1018.
  9. S. Xin, Q. Su, Q. Wang, Q., Wang, “Optimization of resource-constrained multi project scheduling problem based on the genetic algorithm,” in ICSSSM, 2018, pp. 1-6.
  10. H. Zhu, Z. Lu, X. Hu, “A modified heuristic algorithm for resource constrained multi-project scheduling problem based on inspection and rework,” in CASE, 2018, pp. 1058-1063.
  11. A. Ahmeti, N. Musliu, “Hybridizing constraint programming and meta-heuristics for multi-mode resource-constrained multiple projects scheduling problem,” in PATAT, 2021, pp. 188-206.
  12. J.A. Araujo, H.G. Santos, B. Gendron, S.D. Jena, S.S. Brito, D.S. Souza, “Strong bounds for resource constrained project scheduling: Preprocessing and cutting planes,” Computers & Operations Research, vol. 113, 104782, Jan. 2020.
  13. J. Dumond, “In a multi-resource environment, how much is enough?,” International Journal of Production Research, vol. 30, pp. 395-410, Oct. 1992.
  14. J. Dumond, V. A. Mabert, “Evaluating project scheduling and due date assignment procedures: An experimental analysis,” Management Science, vol. 34, pp. 101-118, Jan. 1988.
  15. R. Van Eynde, M. Vanhoucke, “Resource-constrained multi-project scheduling: Benchmark datasets and decoupled scheduling,” Journal of Scheduling, vol. 23, pp. 301-325, Jan. 2020.
  16. H. Chen, G. Ding, J. Zhang, S. Qin, “Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival,” Computers & Industrial Engineering, vol. 137, pp. 174-186, Jan. 2019.
  17. H. Zhu, Z. Lu, C. Lu, Y. Ren, “Modeling and algorithm for resource-constrained multi-project scheduling problem based on detection and rework,” Assembly Automation, vol. 41, pp. 174-186, Jan. 2021.
  18. F. Li, Z. Xu, H. Li, “A multi-agent based cooperative approach to decentralized multi-project scheduling and resource allocation,” Computers & Industrial Engineering, vol. 151, pp. 174-186, Jan. 2021.
  19. D. Liu, Z. Xu, “A multi-PR heuristic for distributed multi-project scheduling with uncertain duration,” IEEE Access, vol. 8, pp. 227780-227792, Jan. 2020.
  20. X. Zhu, R. Ruiz, S. Li, X. Li, “An effective heuristic for project scheduling with resource availability cost,” European Journal of Operational Research, vol. 257, no. 3, pp. 746-762, Mar. 2017.
  21. M. Tritschler, A. Naber, R. Kolisch, “A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles,” European Journal of Operational Research, vol. 262, no. 1, pp. 262-273, Mar. 2017.
  22. S. Rostami, S. Creemers, R. Leus, “New strategies for stochastic resource-constrained project scheduling,” Journal of Scheduling, vol. 21, pp. 1-17, Dec. 2017.
  23. H. Davari Ardakani, A. Dehghani, “Multi-objective optimization of multi–mode resource-constrained project selection and scheduling problem considering resource leveling and time-varying resource usage,” International Journal of Supply and Operations Management, vol. 9, pp. 34-55, Jan. 2022.
  24. C.-B. Cheng, C.-Y. Lo, C.-P. Chu, “Solving multi-mode resource-constrained multi-project scheduling problem with combinatorial auction mechanisms,” International Journal of Information and Management Sciences, vol. 30, pp. 143-167, Jan. 2019
  25. M. Van Den Eeckhout, M. Vanhoucke, B. Maenhout, “A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing,” Computers & Operations Research, vol. 128, 105163, Apr. 2021.
  26. S. Gholizadeh-Tayyar, L. Dupont, J. Lamothe, M. Falcon, “Modeling a generalized resource constrained multi project scheduling problem integrated with a forward-backward supply chain planning,” IFAC-PapersOnLine, vol. 49, pp. 1283-1288, Jan. 2016.
  27. W. Hu, H. Wang, C. Peng, H. Wang, H. Liang, B. Du, “An outer-inner fuzzy cellular automata algorithm for dynamic uncertainty multi-project scheduling problem,” Soft Computing, vol. 19, pp. 2111-2132, Jan. 2015.
  28. X. Wang, Q. Chen, N. Mao, X. Chen, Z. Li, “Proactive approach for stochastic RCMPSP based on multi-priority rule combinations,” International Journal of Production Research, vol. 53, pp. 1098-1110, Jan. 2015.
  29. H. Amirian, R. Sahraeian, “Solving a grey project selection scheduling using a simulated shuffled frog leaping algorithm,” Computers & Industrial Engineering, vol. 107, pp. 141-149, Jan. 2017.
  30. J. Tian, X. Dong, S. Han, “Optimizing for a resource-constrained multi-project scheduling problem with planned resource unavailability,” in MSAM, 2018, pp. 243-248.
DOI: https://doi.org/10.2478/mspe-2023-0029 | Journal eISSN: 2450-5781 | Journal ISSN: 2299-0461
Language: English
Page range: 263 - 270
Submitted on: Dec 1, 2022
|
Accepted on: Jul 1, 2023
|
Published on: Aug 1, 2023
Published by: STE Group sp. z.o.o.
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2023 Anan Butrat, Srisawat Supsomboon, published by STE Group sp. z.o.o.
This work is licensed under the Creative Commons Attribution 4.0 License.