References
- [1] I. Kuric. “New methods and trends in product development and planning”, in Proc. of the 1st International Conference on Quality and Innovation in Engineering and Management, 2011, pp. 453-456.
- [2] J. Matuszek and A. Moczała. “The modelling and simulation method in computer aided co-operation”. Control and Cybernetics, vol. 39, 2010, pp. 117-131.
- [3] D. Plinta and M. Krajcovic. “Production system designing with the use of digital factory and augmented reality technologies”, in Proc. of the International Conference on Automation Advances in Intelligent Systems and Computing, vol. 350, 2015, pp. 187-196.10.1007/978-3-319-15796-2_19
- [4] P. Bubeník, F. Horák. “Knowledge-based systems to support production planning”. Technical gazette, vol. 21/3, 2014, pp. 505-509.
- [5] K. Dohn, A. Gumiński and A. Pawluś. “Supply processes in a machine-building enterprise concerning metallurgical products – case study”, in Proc. of the 24th International Conference on Metallurgy and Materials, 2015, pp. 1902-1907.
- [6] A. Burduk, K. Musial, J. Kochańska, D. Górnicka, A. Stetsenko. „Tabu Search and genetic algorithm for production process scheduling problem”. LOGFORUM, vol.15 (2), 2019, pp. 181-189.10.17270/J.LOG.2019.315
- [7] A. Saniuk, S. Saniuk and K. Witkowski. “Using activity based costing in the metalworking processes”, in Proc. of the 19th International Metallurgical and Materials Conference, 2011, pp. 1328-1333.
- [8] R.S. Kaplan and S.R. Anderson. “Time-driven activity-based costing”. Harvard Business School Press, 2004.10.2139/ssrn.485443
- [9] B. Skołud. “Market oriented approach to the production management on the operational level”, in Proc. of the ModTech International Conference, Advanced Materials Research, 2013, pp. 663-668.10.4028/www.scientific.net/AMR.837.663
- [10] M. Baron-Puda. “Methodology of determining optimal quantity and quality of human resources in unit and small batch production environment”. Zarządzanie Przedsiębiorstwem, vol. 3, 2013, pp. 2-14.
- [11] G. Ćwikła. “Real-time monitoring station for production systems”. Advanced Materials Research, vol.837, 2014, pp. 334-339.10.4028/www.scientific.net/AMR.837.334
- [12] A. Gola and A. Świć. “Computer-Aided Machine Tool Selection for Focused Flexibility Manufacturing Systems Using Economical Criteria”. Actual Problems of Economics, vol. 124, no. 10, 2011, pp. 383-389.
- [13] P.R. Jr. Murphy and D.F. Wood. “Contemporary Logistics”. Pearson, 2011.
- [14] G.M. Melega, S.A. de Araujo, R. Jans. “Classification and literature review of integrated lot-sizing and cutting stock problems”. European Journal of Operational Research, vol. 271 (1), 2018, pp. 1-19.10.1016/j.ejor.2018.01.002
- [15] D. Więcek and D. Więcek. “Production Costs of Machine Elements Estimated in the Design Phase”, Book Series: Advances in Intelligent Systems and Computing, Vol. 637, 2018, pp. 380-391.10.1007/978-3-319-64465-3_37
- [16] P. Grznár, M. Gregor, Š. Mozol, M. Krajčovič, L. Dulina, M. Gašo, M. Major. “A System to Determine the Optimal Work-in-Progress Inventory Stored in Interoperation Manufacturing Buffers”. Sustainability, vol. 11(14), 3949, 2019.10.3390/su11143949
- [17] M. Krajčovič, V. Hančinský, L. Dulina, P. Grznár, M. Gašo, J. Vaculík. “Parameter setting for a genetic algorithm layout planner as a toll of sustainable manufacturing”. Sustainability, vol. 11(7), 2019, pp. 1-26.10.3390/su11072083
- [18] D. Więcek. “Implementation of artificial intelligence in estimating prime costs of producing machine elements”. Advances in Manufacturing Science and Technology, vol. 37, no. 1, 2013, pp. 43-53.10.2478/amst-2013-0004
- [19] T. Gregor, M. Krajčovič and D. Więcek. “Smart connected Logistics”. Procedia Engineering, vol. 192, pp. 265-270, 2017.10.1016/j.proeng.2017.06.046
- [20] L. Gala, J. Basl. “ERP innovation based on requirements of social responsibility measurement and evaluation”. Schriftenreihe Informatik, vol. 41, 2013, pp. 149-156.