Conception of the Track System for „Dębieńsko 1” Mining Plant

Open Access
|Mar 2018

Abstract

This article presents two concepts of site development for the „Dębieńsko 1” mining plant including plans for the track system. The first plan was created in 2013 year and mainly assumed the renovation of railway infrastructure, without changing its shape and configuration. In 2014 year it was resigned from realization of the first conception and there was proposed the second plan. It included changes in the existing track system and project of the new system of excavated raw material haulage. This system is successfully using in the USA and provides the better work productivity of a shunting locomotive. In this article also were indicated the advantages and the disadvantages of solutions proposed in the two projects of site development plans. It was denoted the project that has ultimately been chosen with the justification of choice.

DOI: https://doi.org/10.2478/mspe-10-03-2016 | Journal eISSN: 2450-5781 | Journal ISSN: 2299-0461
Language: English
Page range: 205 - 211
Submitted on: Mar 1, 2016
Accepted on: Jul 1, 2016
Published on: Mar 15, 2018
Published by: STE Group sp. z.o.o.
In partnership with: Paradigm Publishing Services
Publication frequency: 4 times per year

© 2018 Ryszard Mielimąka, Justyna Orwat, Ewa Maciejowska-Figiel, published by STE Group sp. z.o.o.
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.