Have a personal or library account? Click to login
New Challenges to the Deep Development of the Bulqiza Chrome Mines Cover

New Challenges to the Deep Development of the Bulqiza Chrome Mines

By: Edmond Goskolli  
Open Access
|Jul 2022

References

  1. [1] Bakallbashi J., Goskolli E. e.a., 2015 Feasibility study of development in depth of Bulqiza north mine, Tirana
  2. [2] Qorlaze S., Gjoni V., 1988 Geological report on Bulqiza North Chromium Deposit 1984-1988, Tirana
  3. [3] Guda V, Goskolli E. e.a., 2001 Study of gas release in chromium mine of Albania, Tirana.
  4. [4] Nesimi R. e.a., 2014 Report of the results of geological drilling conducted in the mining of northern Bulqize Bulqiza
  5. [5] Bieniawski, Z.T., 1989 Engineering rock mass classifications. New York, Wiley
  6. [6] McPherson M.J., 1988 An analysis of the resistance and airflow characteristics of mine shafts, 4th International Mine Ventilation Congress, Brisbane, Australia.
  7. [7] Goskolli E. e.a., 1990 Microclimates and working conditions in the North Bulqize mine 1987-1990.
DOI: https://doi.org/10.2478/minrv-2022-0011 | Journal eISSN: 2247-8590 | Journal ISSN: 1220-2053
Language: English
Page range: 29 - 34
Published on: Jul 12, 2022
Published by: University of Petrosani
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2022 Edmond Goskolli, published by University of Petrosani
This work is licensed under the Creative Commons Attribution-ShareAlike 4.0 License.